!John White - IPEC status report for Feb. 21 Page 1 From:

"McMullin, Kathy" <KMcMullentergy.com>

To:

" (Popopeek~aol.com)" <Popopeek~aol.com>, " Baranski, James"

<james.baranski~semo.state.ny.us>, " Eddy, Paul" <paul-eddy dps.state.ny.us>, " Greeley, Dan"

<greeleyd6co.rockland.ny.us>, " Gross, Steve - Orange PIO" <sgrosslco.orange.ny.us>, " Meyer, Sue-Rockland Alt. POIO" <Meyers~co.rockland.ny.us>, " Sutton, Tony" <awsl @westchestergov.com>,

Adam Stiebeling <abspcbesibestweb.net>, "Albanese, Raymond" <rlal @westchestergov.com>, Alfredo Vidal <avidal~thevidalgroup.com>, "Anthony Sutton (awsl @weschestergov.com)"

<awsl @weschestergov.com>, "B. Gore" <bgore@urbanomics.com>, "Baker Nancy (bakerna @ co.rockland.ny.us)" <bakerna @ co.rockland.ny.us>, "Barry, Terrence" <TBarry@ entergy.com>,

"Benjamin, Liz" <BenjamiL @ co.rockland.ny.us>, "Bentley, Robyn" <rbentle @ entergy.com>, "Bergmann Ken (ken.bergmann © semo.state.ny.us)" <ken.bergmann@semo.state.ny.us>, Bernie McGarry

<mcgarry senate.state.ny.us>, "Blizard, Andrea" <ablizar@entergy.com>, "Bob Outhouse (rjO4 @ westchestergov.com)" <rjO4 @ westchestergov.com>, "Bob Outhouse (rjo4 @ westchestergov.com.)"

<rjo4@westchestergov.com>, "Bordewich Jean (eanbordewich @schumer.senate.gov)"

<jeanbordewich @ schumer.senate.gov>, "Bordewich Jean (schumer@valstar.net)"

<schumer~valstar.net>, "Boska John (jpb1 @nrc.gov)" <jpbl @nrc.gov>, "Bowman, Greg"

<GBowm9O@prod.entergy.com>, Brian Holian <bjm~nrc.gov>, "Brian Holian (beh~nrc.gov)"

<beh @ nrc.gov>, "Bridges Jeff (JBridges @troopers.state.ny.us)" <JBridges@troopers.state.ny.us>, Chief Tubbs <ChiefBTubbs~aol.com>, Chris Schwarz <cschwarQentergy.com>, "Comiotes, Jim"

<JComiot@entergy.com>, "Conroy, Pat" <PConroy@ entergy.com>, "Cooper Linda (lindac yorktownny.org)" <lindac yorktownny.org>, "Cox, Mark R" <mcox90©entergy.com>, "Crawford Garnesha (Gcrawford @ urbanomics.com)" <Gcrawford @ urbanomics.com>, "Curran, Nick"

<Nick.curran © mail.house.gov>, "Dacimo, Fred" <FDacimo @entergy.com>, David Brand

<DavidPBrand©hotmail.com>, David Greene <dgreene@urbanomics.com>, David Weinraub

<DWeinraub©bmwlobby.com>, "DeGasperis, Edward" <edegasp@entergy.com>, "Dirocco, Anthony"

<ADiroccO entergy.com>, "Don Maurer (Donald.Maurer@semo.state.ny.us)"

<Donald.Maurer@ semo.state.ny.us>, "Dowling, Adele" <amd2 @westchestergov.com>, "Drew Barney (Bamey.Drew@lafarge-na.com)" <Bamey.Drew@lafarge-na.com>, "Elisa Gwilliam (elisagwilliam msn.com)" <elisagwilliam msn.com>, "Fay, Deborah" <DFayl @entergy.com>, Feathers

<jdf @fcwc-law.com>, "Feeney Andrew (Andrew.Feeney@semo.state.ny.us)"

<Andrew.Feeney@semo.state.ny.us>, "Feroe Peter (peter.feroe ©mail.house.gov)"

<peter.feroe@mail.house.gov>, Geri Shapiro <gerishapiro~aol.com>, "Gibbons Emily (Emily.Gibbons @ mail.house.gov)" <Emily.Gibbons@ mail.house.gov>, "Giguere, Kathleen"

<KGiguer@entergy.com>, "Glenn Troester (grtroes@nppd.com)" <grtroes@nppd.com>, "Gottlieb, Larry"

<LGottli@entergy.com>, "Greene, Dominick" <dgreene©co.orange.ny.us>, "Grosjean, Alain"

<AGrosje©entergy.com>, "Guiao Frank (Frank.Guiao@ lafarge-na.com)"

<Frank.Guiao© lafarge-na.com>, Harry Giannoulis <harry~theparksidegroup.com>, "Hinrichs, Gary"

<ghinric entergy.com>, "Hipschman, Thomas" <thips90@entergy.com>, "lnzirillo, Frank"

<finziri~entergy.com>, Ira Promisel <ipromise~troopers.state.ny.us>, Jack Spath <jps~nyserda.org>,

"Jeff Tkacs jefftltownofcortlandt.com)" <jefft~townofcortlandt.com>, "Jensen, Chris"

<jensenc©co.rockland.ny.us>, JES <JES1 @ westchestergov.com>, Jim Cunningham

<jim.cunningham@nyc.bm.com>, Jim Wright <wright@senate.state.ny.us>, John Cordo

<JLC@fcwc-law.com>, "Jones, T. R." <tjones2@entergy.com>, "Kansler, Michael"

<MKansle©entergy.com>, Kathleen Wood <kathleen.wood@chamber.state.ny.us>, "Keegan Pat (Pat.keegan @ mail.house.gov)" <Pat.keegan © mail.house.gov>, "Kerns, Matt" <MKerns©entergy.com>,

"Kopy Mike (MKopy@troopers.state.ny.us)" <MKopy@troopers.state.ny.us>, "Kraus Kevin (kevin.kraus©semo.state.ny.us)" <kevin.kraus @semo.state.ny.us>, "L. Leach"

<lionelleach~yahoo.com>, "Leach, Don" <DLeach@entergy.com>, "Leibell Vincent (leibell@senate.state.ny.us)" <leibell @senate.state.ny.us>, "Leon, Pete" <Pete.Leon @ mail.house.gov>,

"Lew David (DCL~nrc.gov)" <DCL@nrc.gov>

Date:

2/21/06 6:03PM

Subject:

IPEC status report for Feb. 21 Indian Point Energy Center Status Report 4l

JohnWhie -IPEC status report for Feb. 21

= -

Page 2 Joh W hi.......t.............

C-status reoor for Feb. 21Pa e

February 21, 2006 Operational Status Indian Point Unit 2 is operating at 100% and has been online 61 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 140 days. Operations and maintenance crews are making plans for 2R17 refueling outage at IP2 scheduled to begin in April.

Indian Point Tritium Investigation The investigation into the source and extent of a tritium plume on site continues. The NRC is continuing its special investigation and oversight. Samples are obtained regularly from both newly installed wells and existing wells on site. The latest sample results are summarized below from the phase 1 monitoring wells.

These wells were installed to characterize the near field tritium plume adjacent to the IP2 spent fuel pool and the 1P2 transformer yard.

ID Date Location Sample Results Tritium (pCi/L)

Monitoring Wells MW 30 2/7/06 IP2 fuel storage building 511,000 MW-31 2/7/06 MOB side walk

I ohn White - IPEC status report for Feb. 21 Page 31 Joh Wht PC ttsr-tfrFb.2 ae3 33,100 MW-32 2/7/06 Near IP2 spent fuel building 17,700 MW-33 2/7/06 Transformer yard 214,000 MW-34 2/7/06 Transformer yard 174,000 MW-35 2/7/06 Transformer yard 84,500 MW-36

  • 2/10/06 IP2 Turbine building adjacent to discharge canal 20,000 @ 26' 47,500 @41' 22,400 @53' MW-il1 2/7/06

I John White - IPEC status report for Feb. 21 Page 41 John White - IPEC status reoort for Feb. 21 Paae 411 Transformer yard 238,000 Off Site Locations 2/4/06 Algonquin outfall ND 2/4/06 Gypsum plant ND 2/4/06 Trap rock Quarry ND MW 36 was sampled at multiple locations ND = None detectable for tritium The test results are generally consist with previous results for those wells that have a trend. The results for MW-36, which is the most recently sampled well from phase 1, are the first set of multi-level samples obtained from that well.

Split samples from the phase one monitoring wells were taken on Feb.7. Results have not been received yet from the NRC or DEC.

Construction continues on the phase 2 wells, which help characterize the site including IP1 and IP3.

No tritium has been found in any off-site location including drinking water supplies. There are no health or

I John White - IPEC status report for Feb. 21 Page 5 1 John Wht-PC ttu eor frFe.21Pae5q safety impacts to the public or workers from tritium on site.

Status Report Available on JIC Website The Indian Point status report is now available on the new Joint Information Center web site. The web site is part of the virtual news room concept that is being developed for public emergency information. Starting next week, the status report will be sent to the distribution list via the web site. The web site will also include the latest radiological release information for Indian Point.

To preview the web site follow the link to Indian

<http://jic.semo.state.ny.us/PlantStatus/PiantStatusMain.aspx> Point Status Page Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.

John White - TEXT.htm Page 1 Indian Point Energy Center Status Report February 21, 2006 Operational Status Indian Point Unit 2 is operating at 1 00%/6 and has been online 61 days.

Indian Point Unit 3 is operating at 100% reactor power and has been on-line for 140 days. Operations and maintenance crews are making plans for 2R1 7 refueling outage at IP2 scheduled to begin in April.

Indian Point Tritium Investigation The investigation into the source and extent of a tritium plume on site continues. The NRC is continuing its special investigation and oversight. Samples are obtained regularly from both newly installed wells and existing wells on site. The latest sample results are summarized below from the! phase 1 monitoring wells. These wells were installed to characterize the near field tritium plume adjacent to the IP2 spent fuel pool and the IP2 transformer yard.

ID Date Location Sample Results Tritium (pCVL)

Monitoring W ells

___}:.

________:__:X i_

E ::____

MW 30 2/7/06 P2 fuel storage building 511,000 W-31 217/06 MOB side walk 33,100 W-32 27/06 Near IP2 spent fuel building 17,700

I John White - TEXT.htm Page 21X i

MW-33 27/06 Transformer yard 214,000 MW-34 2/7/06 Transformer yard 174,000 MW-35 2/7/06 ransformer yard 84,500 MW-36

  • 2/10/06 P2 Turbine building adjacent to discharge 20,000 @ 26' ranal 47,500 @ 41' 22,400 @53' MW-1 11 2/7/06 Transformer yard 238,000 Dff Site Locations

___________________________i______

2/4/06

_Algonquin outfall ND 2/4/06

_Gypsum plant ND 2/4/06 Trap rock Quarry ND MW 36 was sampled at multiple locations ND = None detectable for tritium The test results are generally consist with previous results for those wells that have a trend. The results for MW-36, which is the most recently sampled well from phase 1, are the first set of multi-level samples obtained from that well.

Split samples from the phase one monitoring wells were taken on Feb.7. Results have not been received yet from the NRC or DEC.

Construction continues on the phase 2 wells, which help characterize the site including IP1 and IP3.

IAhn White - TEXT.htm Page 3 n

h-Pe I

No tritium has been found in any off-site location including drinking water supplies.

There are no health or safety impacts to the public or workers from tritium on site.

Status Report Available on JIC Website The Indian Point status report is now available on the new Joint Information Center web site. The web site is part of the virtual news room concept that is being developed for public emergency information. Starting next week, the status report will be sent to the distribution list via the web site. The web site will also include the latest radiological release information for Indian Point.

To preview the web site follow the link to Indian Point Status Page Educational Outreach Entergy Nuclear Northeast provides customized outreach education programs for schools, youth groups, and civic organizations. The topics we cover include Emergency Planning, Understanding Radiation, Nuclear Fuel and a general overview of the operations of Indian Point Energy Center. If you would like a brochure or are interested in scheduling a program, contact IPEC Communications at 914-271-7441.

If you have any questions or need clarification of the information provided, please contact Kathy McMullin, manager of communications, Indian Point Energy Center, at 914-271-7132.