Text

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1280010801 Perform Surveillance Tests TASK STANDARD: Perform a SDM ST and identify to CRS that boration is required.

K/A: 2.2.12 K/A RATING: RO: 3.0 SRO:

K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 15 minutes

REFERENCES:

72ST-9RX14, Rev 9, Core Data Book Unit 2 Cycle 13 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 06/08/2005 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT RA1-1 Capehart 1 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: This JPM may be run in-plant or in the Simulator. This JPM does not require the simulator.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 1.

2.

3.

4.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • Provide a copy of U2C13 Core Data Book.

RA1-1 Capehart 2 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • Unit 2 is in mode 4 in a short notice outage. (Cycle 13)
  • The Core is at 251 EFPD
  • RCS Boron = 900 ppm per chemistry sample this morning @ 1000
  • Current RCS Temperature (Tcold) is 300°F
  • All CEAS are fully inserted, RTSG breakers are open
  • The Reactor has been shutdown for 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />
  • The plant is expected to be in Mode 5 with an RCS Tcold of 150°F in six hours.

Your task is to:

1. Perform a shutdown margin calculation using 72ST-9RX14 Section 8.1, for the expected mode 5 temperature of 150°F (Tcold) conditions.
2. Determine if any actions are required.
  • The SM has given his permission to perform the ST.
  • The prerequisites have NOT been completed.

RA1-1 Capehart 3 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • If performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • If locked valves will be involved. No attempt will be made to actually operate any valves.

RA1-1 Capehart 4 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Candidate fills in Section 7.0 data Section 7.0 is initialed as complete and initials. once the following data is filled in:

o Circle Unit 2 Note: The Examinee may o Enter Todays date inappropriately circle MODE 4 based o Circle MODE 5 on current conditions instead of the o Initials Step 7.1 & 7.2 final SDM calculated MODE 5. This o Initials Step 7.3 Section 8.1 is not critical because the same curve and NAs Section 8.2 - 8.5 is used regardless.

o Initials Step 7.4 Examinee should determine that Section 8.1 is the correct section from the Initiating CUE SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Examinee NAs steps 8.1.1. Examinee notes that the steps of 8.1.1 are NA and annotates appropriately.

SAT / UNSAT Comments (required for UNSAT):

RA1-1 Capehart 5 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

3.
  • Examinee records data into step Examinee records the following data:

8.1.2.

The Examinee may inappropriately o RCS Boron 900 ppm place the wrong Tcold value of 300 o Date/Time Today

°F based on current conditions o Current EFPD 251 instead of the final SDM calculated o Tcold 150 °F Tcold of 150 °F. If so, this will affect the correct boron determination.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

4.
  • The Examinee obtains the Required Examinee obtains U2C13 Core Data RCS Boron Concentration from the Book and proceeds to page 124 U2C13 Core Data Book and enters (curve 3.1.11) and interpolates the value into step 8.1.3. correct boron concentration of 945 ppm +/- 5 ppm for 150 F. Value is entered into the first sub step of 8.1.3. The second sub step is NAed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5.
  • Examinee accessed step 8.1.4 and Examinee determines that the determines that the condition is not condition for this step is NOT met, met. Initials and proceeds to step initials the step and proceeds to next 8.1.5. step.

SAT / UNSAT Comments (required for UNSAT):

RA1-1 Capehart 6 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

6.
  • Evaluate Step 8.1.5 for inclusion of Examinee determines that (at 100 negative reactivity from Xenon hours past shutdown) the Core is essentially Xenon free. Cannot use Xenon adjustment. (NAs steps 8.1..5 through 8.1.8)

Note: step becomes critical if values for Xenon other than 0 are used.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

7.
  • Evaluate Step 8.1.9 for Acceptance Examinee determines the Acceptance Criteria Criteria is NOT met. Circles NO, initials, and proceeds to step 8.1.11.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9. Obtain independent verification of all Inform CUE: An independent Examinee requests independent steps performed in this procedure. verification has been performed. verification.

SAT / UNSAT Comments (required for UNSAT):

RA1-1 Capehart 7 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

10.
  • Addresses Step 8.11 due to NOT Examinee identifies the requirements meeting acceptance criteria. to:
  • Notify Reactor Engineering Note: Critical part is to identify that Boration is needed to meet the required shutdown margin for the future condition of 150F.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT RA1-1 Capehart 8 Rev 0, 6/8/05

RA1-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/8/05 6 New JPM.

REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

1. Vendor reference document upgrade
2. Plant modification (include number)
3. Procedure upgrade
4. Internal or External Agency Commitment (indicate item number)
5. Technical Specification Change (indicate amendment number)
6. Other (explain in comments)

RA1-1 Capehart 9 Rev 0, 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIATING CUE:

  • Unit 2 is in mode 4 in a short notice outage. (Cycle 13)
  • The Core is at 251 EFPD
  • RCS Boron = 900 ppm per chemistry sample this morning @ 1000
  • Current RCS Temperature (Tcold) is 300°F
  • All CEAS are fully inserted, RTSG breakers are open
  • The Reactor has been shutdown for 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />
  • The plant is expected to be in Mode 5 with an RCS Tcold of 150°F in six hours.

Your task is to:

1. Perform a shutdown margin calculation using 72ST-9RX14 Section 8.1, for the expected mode 5 temperature of 150°F (Tcold) conditions.
2. Determine if any actions are required.
  • The SM has given his permission to perform the ST.
  • The prerequisites have NOT been completed.

CANDIDATE RA1-2 Shannon 10 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1220020001 Perform adjustable power signal calibrations TASK STANDARD: Calibrate NKBDELT K/A: 32002A106 K/A RATING: RO: 4.0 SRO: 4.0 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 15 minutes

REFERENCES:

40OP-9ZZ05, Power Operations, Appendix R, Calibration of NKBDELT (Rev 102)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: John M. Dedon TECH REVIEW:

REVISION DATE: 04/06/04 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT RA1-2 Shannon 11 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. Performed as a table-top JPM B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 5.

6.

7.

8.

C. SPECIAL INSTRUCTIONS:

None. This JPM will be conducted in table top format.

D. REQUIRED CONDITIONS:

  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • CMC and PC COLSS Addressable Constants Change Log sheets for NKE06.
  • A Calculator RA1-2 Shannon 12 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

Perform Appendix R (Calibration of NKBDELT) of 40OP-9ZZ05, Power Operations. You have the following data from the Plant Computer (PC) and Core Monitoring Computer (CMC):

PC CMC NKBDELTC: 99.4 99.35 NKBSTATC: 101.58 101.61 JSCALORC: 99.62 99.61 NKE07: 0.972 0.972 INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.

RA1-2 Shannon 13 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

  • Locked valves will be involved. No attempt will be made to actually operate any valves.

RA1-2 Shannon 14 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1.
  • Compare that JSCALORC and Determines >0.2% difference for PC NKBDELTC on the PC and CMC. and CMC and goes to Step 2.0.

Check that the difference is within 0.2%. Note: necessary data provided in CUE.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Record the values of NKBSTATC, Examinee records the values of JSCALORC, and Addressable NKBSTATC, JSCALORC, and Constant NKE07 from the PC and Addressable Constant NKE07 from CMC. the PC and CMC given in CUE.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3.
  • Calculate and record new values of If needed CUE: request an answer Examinee calculates and records new addressable constant NKE06 using to 3 significant digits. values of addressable constant the Equation (in procedure). NKE06 using the Equation.

If the Tabletop data was utilized; NKE06 = NKBSTATC -

PC NKE06= -0.9097 (JSCALORC / NKE07) When independent verification is CMC NKE06= -0.8694 requested, Inform CUE: the Independent Verification has been Note: the value must be negative.

completed and the procedure has been returned to you.

SAT / UNSAT Comments (required for UNSAT):

RA1-2 Shannon 15 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

4. Enter the new values of NKE06 into Inform CUE: The new values for the PC and CMC. NKE06 have been entered into the PC and CMC.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5.
  • Document the changes in the COLSS Examinee documents the changes in Addressable Constant Log. the COLSS Addressable Constant Log. The critical portion is that the New Value must be entered correctly.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6. Check that NKBDELTC and If the Tabletop data was utilized and; .

JSCALORC read within 0.2% of one PC NKE06= -0.9097 another. CMC NKE06= -0.869 Then CUE: NKBDELTC and JSCALORC read within 0.2% of each other SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT RA1-2 Shannon 16 Rev 0 6/8/05

AD010-CR-000 RA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/8/05 NRC REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

7. Vendor reference document upgrade
8. Plant modification (include number)
9. Procedure upgrade
10. Internal or External Agency Commitment (indicate item number)
11. Technical Specification Change (indicate amendment number)
12. Other (explain in comments)

RA1-2 Shannon 17 Rev 0 6/8/05

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

Perform Appendix R (Calibration of NKBDELT) of 40OP-9ZZ05, Power Operations. You have the following data from the Plant Computer (PC) and Core Monitoring Computer (CMC):

PC CMC NKBDELTC: 99.4 99.35 NKBSTATC: 101.58 101.61 JSCALORC: 99.62 99.61 NKE07: 0.972 0.972 CANDIDATE RA-2 Capehart 18 Rev 0, 6/10/05

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1290030101 Generate a Permit TASK STANDARD: Identifies isolation boundaries for a Condensate Transfer Pump Permit K/A: 2.2.13 K/A RATING: RO: 3.6 SRO: 3.8 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 25 min

REFERENCES:

40DP-9OP29, Power Block Permit and Tagging (Rev 29); P&IDs 13-M-CTP-001 and 13-E-CTP-001 SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT ADMIN AREA X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 6/08/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT ADMIN AREA TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT RA-2 Capehart 19 Rev 0, 6/10/05

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: Simulator not required B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

1. N/A 2.

3.

4.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • Mechanical & Electrical P&ID for CTA-P01 o 13-M-CTP-001 o 13-E-CTP-001 20

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any in-plant equipment.
  • The examiner will provide any responses and indications required from outside the control room.
  • Independent verification of valve positions waived for this JPM.
  • You may use any source of information normally available.

INITIATING CUE:

Unit 1 is at rated power when conditions requiring a permit on CTA-P01 (Condensate Transfer Pump A) arise. SWMS is not available. CTA-P01 must be isolated to adjust or repack the pump.

Your task is using P&IDs, identify the components for this work that would require a red danger tag per 40DP-9OP29, Power Block Permit and Tagging.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.

SAFETY CONSIDERATIONS:

  • None.

21

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD Determines the suction valve, CTA- Determines the suction valve, CTA-

1.
  • V023, must be closed. V023, must be RED tagged CLOSED.

NOTE: There are 9 tagged items per the standard CTA-P01 tagout in SWMS (Site Work Management System) computer. 6 of these are RED tagged. The 6 asterisked items shown here are the minimum required to successfully complete the JPM.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determines the Fuel Pool Supply Determines the Fuel Pool Supply

2.
  • from CTA-P01, CTA-V018, must be from CTA-P01, CTA-V018, must be closed. RED tagged CLOSED.

SAT / UNSAT Comments (required for UNSAT):

22

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Determines the Supply Header Determines the Supply Header

3.
  • Isolation Valve, CTA-V017, must be Isolation Valve, CTA-V017, must be closed RED tagged CLOSED.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determines the mini-flow recirc Determines the mini-flow recirc

4.
  • valve, CTA-V028, must be closed. valve, CTA-V028, must be RED tagged CLOSED.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determines the full flow recirc valve, Determines full flow recirc valve,

5.
  • CTA-V033, must be closed CTA-V033, must be RED tagged CLOSED.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determines breaker PHA-M3308 Determines breaker PHA-M3308

6.
  • must be open. must be RED TAGGED OPEN.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT 23

RA-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 00 6/9/05 6 New ADMIN JPM REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

1. Vendor reference document upgrade
2. Plant modification (include number)
3. Procedure upgrade
4. Internal or External Agency Commitment (indicate item number)
5. Technical Specification Change (indicate amendment number)
6. Other (explain in comments) 24

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIATING CUE:

Unit 1 is at rated power when conditions requiring a permit on CTA-P01 (Condensate Transfer Pump A) arise. SWMS is not available. CTA-P01 must be isolated to adjust or repack the pump.

Your task is using P&IDs, identify the components for this work that would require a red danger tag per 40DP-9OP29, Power Block Permit and Tagging.

CANDIDATE RA3 Capehart 25 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM ADMIN TASK BASIS INFORMATION TASK: 1290020301 Conduct On Shift Operations IAW Conduct of Shift Operations TASK: 1290010301 Implement verification of plant activities.

TASK STANDARD: Determine proper REP task, determine RCA entry requirements.

K/A 2.3.10 K/A RATING: RO: 2.9 SRO: 3.3 K/A: 2.3.4 K/A RATING: RO: 2.5 SRO: 3.1 APPLICABLE POSITION(S): RO VALIDATION TIME: 15 minutes

REFERENCES:

NGW01, Initial Radiation Worker Practices.

SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 06/07/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT X TESTING METHOD: SIMULATE PERFORM X EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT RA3 Capehart 26 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC# : N/A B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

1. N/A C. SPECIAL INSTRUCTIONS:
  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • A copy of the Emergency Response REP 9-9999E.

RA3 Capehart 27 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

  • You may use any source of information normally available.

A COPY OF THE FOLLOWING IS ATTACHED:

  • COMMON EMERGENCY RESPONSE REP 9-9999E.

INITIATING CUE:

Given the following initial conditions:

  • The Unit has experienced a Large Loss of Coolant Accident during an earthquake event.
  • Radiation levels are elevated in the Auxiliary Bldg lower levels.
  • The Control Room has been informed that the Area 2 Auxiliary Operator is trapped under debris in the A train Shutdown Cooling Room.
  • The Emergency Coordinator has authorized you to perform life saving activities to assist the Area 2 Auxiliary Operator out of the area.

Your tasks are to locate the Emergency Response REP and determine:

1. the proper task for this evolution.
2. if a RP Pre-Job Brief is required prior to entering the RCA?
3. RP coverage during job performance.
4. dress-out requirements.
5. required EPD settings.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set, then ensure the examinee has been briefed IAW NUREG 1021.

Step sequence is not critical unless noted or will prevent achieving the task standard.

RA3 Capehart 28 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM SAFETY CONSIDERATIONS: none RA3 Capehart 29 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP ELEMENT STANDARD

1.
  • Examinee reviews REP and survey and Examinee determines entry on TASK 3 is determines task he can enter on. required.

SAT UNSAT (UNSAT requires comments)

STEP ELEMENT STANDARD

2.
  • Examinee determines if RP pre-job Brief is Determines must perform RP pre-job brief.

required for entry into the RCA.

SAT UNSAT (UNSAT requires comments)

STEP ELEMENT STANDARD

3.
  • Examinee determines RP coverage RP coverage is CONTINUOUS.

requirements during job performance..

SAT UNSAT (UNSAT requires comments)

STEP ELEMENT STANDARD

4.
  • Examinee determines dress-out PC and respiratory protection equipment requirements. requirements per direction from the RPM / RPC

/ RAC or designee.

SAT UNSAT (UNSAT requires comments)

COMMENTS:

RA3 Capehart 30 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP ELEMENT STANDARD

5.
  • Determine the REP required EPD settings. Examinee determines EPD is required with alarm settings of 25,000 mRem dose and 250,000 mRem/hr Dose Rate (as stated on the REP)

SAT UNSAT (UNSAT requires comments)

NORMAL TERMINATION POINT COMMENTS:

RA3 Capehart 31 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM KEY

1. Determine proper task for this evolution.

Proper task is TASK 3.

2. Is a RP Pre-Job Brief required prior to entering the RCA?

Yes.

3. Determine RP coverage during job performance.

RP coverage is CONTINUOUS.

4. Determine dress-out requirements.

PC and respiratory protection equipment requirements per direction from the RPM / RPC

/ RAC or designee.

5. Determine required EPD settings.

Examinee determines EPD is required with alarm settings of 25,000 mRem Dose and 250,000 mrem/hr Dose Rate.

COMMENTS:

RA3 Capehart 32 Rev 0, 6/8/05

RA3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 06/08/05 6 New Admin Task JPM REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

1. Vendor reference document upgrade
2. Plant modification (include number)
3. Procedure upgrade
4. Internal or External Agency Commitment (indicate item number)
5. Technical Specification Change (indicate amendment number)
6. Other (explain in comments)

RA3 Capehart 33 Rev 0, 6/8/05

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIATING CUE:

  • The Unit has experienced a Large Loss of Coolant Accident during an earthquake event.
  • Radiation levels are elevated in the Aux Bldg lower levels.
  • The Control Room has been informed that the Area 2 Auxiliary Operator is trapped under debris in the A train Shutdown Cooling Room.
  • The Emergency Coordinator has authorized you to perform life saving activities to assist the Area 2 Auxiliary Operator out of the area.

Your tasks are to locate the Emergency Response REP and determine:

1. the proper task for this evolution.
2. if a RP Pre-Job Brief is required prior to entering the RCA?
3. RP coverage during job performance.
4. dress-out requirements.
5. required EPD settings.

CANDIDATE 34 Capehart 6/8/05

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. Determine the proper task for this evolution.
2. Is a RP Pre-Job Brief required prior to entering the RCA?
3. Determine RP coverage during job performance.
4. Determine dress-out requirements.
5. Determine required EPD settings.

CANDIDATE 35 Capehart 6/8/05

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1280010202 Review Surveillance Tests TASK STANDARD: Identify errors and determine a boration required.

K/A: 2.2.12 K/A RATING: RO: SRO: 3.4 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): SRO VALIDATION TIME: 15 minutes

REFERENCES:

72ST-9RX14, Rev 9, Core Data Book Unit 2 Cycle 13 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 06/08/2005 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT 36 Capehart 6/8/05

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: Simulator setup required. This JPM may be run in-plant or in the Simulator.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 9.

10.

11.

12.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • 72ST-9RX14, Section 7 & 8 data completed as follows:

o Complete prerequisites for Unit 2, Mode 5, and Section 8.1 o Step 8.1.1 N/A all steps o Step 8.1.2 RCS Boron from latest Chemistry sample 925 Date/Time from latest Chemistry sample Use todays date and an earlier time EFPD 251 Most Conservative Tcold 300 NOTE: The correct value is 150 o Step 8.1.3 IF RTCBs are open .. Required RCS Boron Concentration 920 NOTE: The correct value is 982 o Step 8.1.4 - Circle the GO TO step 8.1.9 o Step 8.1.9 - Initial and circle YES OR Use attached marked up procedure

  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • None.

37

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • Unit 2 is in mode 4 in a short notice outage. (Cycle 13)
  • The Core is at 251 EFPD
  • Current RCS Temperature (Tcold) is 300°F
  • All CEAS are fully inserted, RTSG breakers are open
  • The Reactor has been shutdown for 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />
  • Mode 5 with an RCS Tcold of 150°F is expected to be reached in about six hours.

Your task is to:

1. Perform the Independent Verification per step 8.1.10 of 72ST-9RX14.
2. Identify 3 errors (Non-clerical, not typos)
3. Determine any required action(s) that need to be done as a result of these errors.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step 38

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • If performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • If locked valves will be involved. No attempt will be made to actually operate any valves.

39

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Verify the completion of the Examinee verified that Section 7.0 is prerequisites section. initialed as complete.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Verify that the correct section is Examinee should determine that used. (Section 8.1) Section 8.1 is the correct section from the Initiating CUE.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3.
  • Verify the data in Step 8.1.2 is ERROR #1. Examinee notes that the correct for this performance. Most conservative Tcold is INCORRECTLY marked as 300 °F.

The Most conservative Tcold will be 150 °F based on proceeding to cooldown to MODE 5.

SAT / UNSAT Comments (required for UNSAT):

40

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

4.
  • Refer to Section 3.1.11 of Core Data ERROR # 2. Examinee verifies Book U2C13 and verify the table and correct table was used and an minimum RCS Boron Value. INCORRECT boron concentration of 890 ppm boron was selected based on using the Current Tcold value (300 °F) instead of the projected most conservative Tcold for cooldown Correct boron concentration is 945 ppm +/- 5 ppm for 150 °F (Tcold).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5.
  • Examinee checks that RCS boron Examinee determines that the from chemistry is greater than the incorrect response for Step 8.1.4 of Required RCS boron concentration YES was taken and therefore step from the Core Data Book. 8.1.9 was performed next INCORRECTLY.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6.
  • Evaluate Step 8.1.5 for inclusion of Examinee determines that (at 100 negative reactivity from Xenon hours past shutdown) the Core is essentially Xenon free. Cannot use Xenon adjustment. (Steps 8.1.5 through 8.1.8 are NOT APPLICABLE)

Note: Step is critical only if a value is entered for Xenon.

SAT / UNSAT Comments (required for UNSAT):

41

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD ERROR #3. Examinee identifies the

7.
  • Acceptance Criteria of step 8.1.9 acceptance criteria are NOT met evaluated and determined if satisfied.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

8.
  • Addresses Step 8.11 due to NOT Examinee identifies the acceptance meeting acceptance criteria. criteria are not met and action must be taken to:
  • Notify Reactor Engineering Note: Critical part is to identify that Boration is needed to meet the required shutdown margin for the future condition of 150F.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT 42

SA1-1 AD012-CR-000 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/8/05 6 Modified existing JPM.

REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

13. Vendor reference document upgrade
14. Plant modification (include number)
15. Procedure upgrade
16. Internal or External Agency Commitment (indicate item number)
17. Technical Specification Change (indicate amendment number)
18. Other (explain in comments) 43

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • Unit 2 is in mode 4 in a short notice outage. (Cycle 13)
  • The Core is at 251 EFPD
  • RCS Temperature (Tcold) is 300°F
  • All CEAS are fully inserted, RTSG breakers are open
  • The Reactor has been shutdown for 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />
  • Mode 5 with an RCS Tcold of 150°F is expected to be reached in about six hours.

Your task is to:

1. Perform the Independent Verification per step 8.1.10 of 72ST-9RX14.
2. Identify 3 errors (Non-clerical, not typos)
3. Determine any required action(s) that need to be done as a result of these errors.

CANDIDATE SA1-2 Capehart 44 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1290020301 Conduct of Shift Operations TASK STANDARD: Area Operator determined to not be able to stand watch.

SRO determined to NOT meet overtime limitation exception criteria.

K/A: 2.1.5 K/A RATING: RO: SRO: 3.4 APPLICABLE POSITION(S): SRO VALIDATION TIME: 10 min.

REFERENCES:

01DP-9EM01, OVERTIME LIMITATIONS (Rev 4)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT ADMIN AREA X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 6/8/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT ADMIN AREA TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT SA1-2 Capehart 45 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: The simulator is not specifically needed for this JPM.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT TAG TITLE VALUE TIME RAMP RATE DELAY N/A C. SPECIAL INSTRUCTIONS:

  • Ensure that a copy of 01DP-9EM01, OVERTIME LIMITATIONS, Rev. 4, is available.

D. REQUIRED CONDITIONS:

  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • Blank copy of 01DP-9EM01, OVERTIME LIMITATIONS, Rev. 4.
  • Calculator
  • Access to the Operations 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> calculator on the intranet is not allowed for this JPM.

SA1-2 Capehart 46 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

1. The following Unit 1 outage working hour history is given for you as the CRS and one of your Area Operators.

A. Da CRS Area Operator te 6/28 (Day 1) 12 hrs (DS) 12 hrs (NS) 6/29 12 hrs (DS) OFF 6/30 12 hrs (DS) OFF 6/31 OFF 12 hrs (DS) 7/1 12 hrs (DS) 12 hrs (DS) 7/2 12 hrs (DS) 12 hrs (DS) 7/3 12 hrs (DS) 12 hrs (DS) 7/4 12 hrs (DS) 12 hrs (DS) 7/5 12 hrs (DS) 12 hrs (DS)

DS=Dayshift NS=Nightshift

2. You and the Area Operator are scheduled to work dayshift today, 7/6 INITIATING CUE:
  • You are to evaluate the working hour history for yourself and the Area Operator to determine whether both of you can work a full dayshift of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on 7/6. Explain the basis for each of your conclusions.
  • Access to the Operations 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> calculator table on the intranet is not available for this task.

SA1-2 Capehart 47 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set, then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.

SAFETY CONSIDERATIONS:

  • None SA1-2 Capehart 48 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD Obtain 01DP-9EM01, Overtime Obtains 01DP-9EM01, Overtime

1. If candidate requests access to the Limitations Limitations.

Operations 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> calculator, CUE: the calculator is not available.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2.
  • The number of hours worked Assess hours worked and shall be controlled in accordance conclude the following:

with the limitations set in 01DP- The SRO can work the entire 12 9EM01, Overtime Limitations. hour dayshift.

SAT / UNSAT Comments (required for UNSAT):

COMMENTS:

SA1-2 Capehart 49 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

3.
  • The number of hours worked Assess hours worked and shall be controlled in accordance conclude the following:

with the limitations set in 01DP-9EM01, Overtime Limitations. The Area Operator can NOT take the shift unless an exception is given because the next hour worked will result in him exceeding 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 168 hour0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> period.

SAT / UNSAT Comments (required for UNSAT):

COMMENTS:

SA1-2 Capehart 50 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

4.
  • The number of hours worked INFORM CUE: Assesses whether the CRS can shall be controlled in accordance Assume you, the CRS, have assist with the ST.

with the limitations set in 01DP- just completed a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift 9EM01, Overtime Limitations. with a half hour turnover on Candidate concludes that the ST July 6th and you are now in the work may NOT be performed due break room. You receive a page to exceeding working hour limits from the Control Room that of any one of the following:

your help is needed in

  • 24 in 48 hrs performing a routine
  • 72 in 168 hrs Surveillance in containment for about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
  • 8 hr break between work Identify any working hour periods limits associated with this additional task. NOTE: The work could be performed if an Overtime Limitation Exception Report is When requested, CUE (as processed and approved.

appropriate): I understand the However for this scenario it ST work may/may not be should not be approved. This performed. work could be reasonably performed by another operator.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT COMMENTS:

SA1-2 Capehart 51 Rev 0, 6/8/05

SA1-2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 06/8/05 New Original REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

1. Vendor reference document upgrade
2. Plant modification (include number)
3. Procedure upgrade
4. Internal or External Agency Commitment (indicate item number)
5. Technical Specification Change (indicate amendment number)
6. Other (explain in comments)

SA1-2 Capehart 52 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM INITIAL CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

1. The following Unit 1 outage working hour history is given for you as the CRS and one of your Area Operators.

A. Da CRS Area Operator te 6/28 (Day 1) 12 hrs (DS) 12 hrs (NS) 6/29 12 hrs (DS) OFF 6/30 12 hrs (DS) OFF 6/31 OFF 12 hrs (DS) 7/1 12 hrs (DS) 12 hrs (DS) 7/2 12 hrs (DS) 12 hrs (DS) 7/3 12 hrs (DS) 12 hrs (DS) 7/4 12 hrs (DS) 12 hrs (DS) 7/5 12 hrs (DS) 12 hrs (DS)

DS=Dayshift NS=Nightshift

2. You and the Area Operator are scheduled to work dayshift today, 7/6 INITIATING CUE:
  • You are to evaluate the working hour history for yourself and the Area Operator to determine whether both of you can work a full dayshift of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> on 7/6. Explain the basis for each of your conclusions.
  • Access to the Operations 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> calculator table on the intranet is not available for this task.

CANDIDATE SA3 Capehart 53 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM JPM BASIS INFORMATION TASK: 1290020301 Conduct On Shift Operations IAW Conduct of Shift Operations TASK STANDARD: Determine qualification status as qualified. Determine proper REP task, contact RP, and enter the RCA. Upon entering take action for EPD alarm.

K/A: 2.3.10 K/A RATING: RO: 2.9 SRO: 3.3 APPLICABLE POSITION(S): SRO VALIDATION TIME: 20 min

REFERENCES:

NGW01, Initial Radiation Worker Practices. REP 3-3022F SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phillip Capehart TECH REVIEW:

REVISION DATE: 09/29/2004 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT SA3 Capehart 54 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM

1. SIMULATOR SETUP:

A. IC#: None. Performed in plant or table top.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

13. N/A
14. N/A
15. N/A
16. N/A C. SPECIAL INSTRUCTIONS:
  • None.

D. REQUIRED CONDITIONS:

  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • A copy of the REFUELING MACHINE CAMERA MAINTENANCE: REMOVE, REPAIR, AND REINSTALL REP (i.e. REP 3-3022F attached)

SA3 Capehart 55 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

Given the following initial conditions.

  • Unit 3 is preparing for core offload.
  • This will be your first entry into the RCA this outage.
  • You are going to enter containment to assist the RAMs (Refuel and Maintenance) group to identify the location (i.e. equipment setup) for placing the refuel camera on the Refuel platform. No hands on work is to be performed at this time.
  • An HRA entry may be required.

Your tasks for this JPM are to:

  • Use a Qualification Computer Station or PC to determine your GET RADWORKER qualification status prior to entry into the RCA.
  • Given the appropriate REP for this job (3-3022F), discuss the following radiological requirements to perform this task:
  • Correct task # appropriate for the job scope.
  • Limitations associated with the REP.
  • Dosimetry required and the appropriate settings
  • Radiation Protection Coverage Requirements.

Once the REP requirements for this evolution have been addressed, entry into the RCA will be made (or simulated) on the appropriate REP. Examinee may NOT discuss entry requirements with RP until the above items have been identified.

SA3 Capehart 56 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM NOTE: NO ENTRY INTO A HIGH RADIATION AREA OR CONTAMINATED AREA WILL ACTUALLY BE MADE.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • No attempt will be made to actually operate any valves.
  • Notes to examiner:

No entry into a High Radiation Area or Contaminated Area will be allowed. Examinee may discuss entry requirements with RP.

  • It is preferred that this JPM be performed at the RP Island in preparation to performing an in plant/inside the RCA JPM SA3 Capehart 57 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM JPM START TIME:

STEP CUE STANDARD After the candidate completes this Uses computer and determines 1.* Enters employee information into step provide him/her with the qualification status of RAD Qualification Computer Station (or REP. WORKER as Yes.

SWMS program on personal PC) to (REP 3-3022F) query qualification status (Note: a personal PC may be used in lieu of the Qualification Computer Station to access SWMS, SWMS Intranet web site or SWMS Warehouse to verify qualifications)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determine the correct task number Examinee selects appropriate task

2.
  • for the evolution. number (e.g. REP 3-3022F, Task 1, Refueling Operations and Support Work)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determine the REP Limitations Examinee determines the REP

3.
  • radiological limitations (e.g. NO VHRA Entry, NO Entry INTO >

5,000 mREM/hr., NO Containment Entry in Plant Modes 1-2 ) (pg 1 of 20)

SAT / UNSAT Comments (required for UNSAT):

SA3 Capehart 58 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM STEP CUE STANDARD Determine Dosimetry (with Examinee determines EPD is

4.
  • appropriate settings). required with settings as stated on the REP (e.g. set at 50 mRem dose and 1000 mREM/hr Dose Rate.) (pg 6 of 20)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Determines RP coverage After Examinee determines Examinee determines

5.
  • requirements. INTERMITTENT coverage is INTERMITTENT coverage is required. required.

INFORM CUE: All entry Note to evaluator: Once the REP requirements have been met.

requirements for the evolution Enter (or simulate entering) the have been addressed, entry into the RCA and proceed to the dress out RCA will be made (or simulated).

area.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Enter the Auxiliary Building. Note to evaluator, when examinee Examinee enters the Auxiliary 6.

has reached the dress out station, Building, and proceeds to the dress initiate the following cue: out station.

INFORM CUE: When in the dress out area your EPD is beeping 3 times every second and the display is flashing dose alarm.

NOTE: This alarm is unacknowledgeable. It can only be cleared at the ARACS system.

SAT / UNSAT Comments (required for UNSAT):

SA3 Capehart 59 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM STEP CUE STANDARD Does not enter containment and IF REQUESTED CUE: RP has been Does not enter containment.

7.
  • contacts RP. contacted. Examinee returns to RP island and informs RP of suspect EPD reading.

INFORM CUE: This completes this JPM.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT SA3 Capehart 60 Rev 0, 6/8/05

SA3 PVNGS JOB PERFORMANCE MEASURE 2005 SRO NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 3/24/99 6 New Admin Task JPM 1 4/11/01 6 Include step to verify qualifications.

REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

19. Vendor reference document upgrade
20. Plant modification (include number)
21. Procedure upgrade
22. Internal or External Agency Commitment (indicate item number)
23. Technical Specification Change (indicate amendment number)
24. Other (explain in comments)

SA3 Capehart 61 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM INITIATING CUE:

Given the following initial conditions.

  • Unit 3 is preparing for core offload.
  • This will be your first entry into the RCA this outage.
  • You are going to enter containment to assist the RAMs (Refuel and Maintenance) group to identify the location (i.e. equipment setup) for placing the refuel camera on the Refuel platform. No hands on work is to be performed at this time.
  • An HRA entry may be required.

Your tasks for this JPM are to:

1. Use a Qualification Computer Station or PC to determine your GET RADWORKER qualification status prior to entry into the RCA.
2. Given the appropriate REP for this job (3-3022F), discuss the following radiological requirements to perform this task:

a) Correct task # appropriate for the job scope.

b) Limitations associated with the REP.

c) Dosimetry required and the appropriate settings d) Radiation Protection Coverage Requirements.

Once the REP requirements for this evolution have been addressed, entry into the RCA will be made (or simulated) on the appropriate REP. Examinee may NOT discuss entry requirements with RP until the above items have been identified.

NOTE: NO ENTRY INTO A HIGH RADIATION AREA OR CONTAMINATED AREA WILL ACTUALLY BE MADE.

CANDIDATE SA4A Potter 62 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM

5. Use a Qualification Computer Station or PC to determine your GET RADWORKER qualification status prior to entry into the RCA.
6. Correct task # appropriate for the job scope.
7. Limitations associated with the REP.
8. Dosimetry required and the appropriate settings.
9. Radiation Protection Coverage Requirements.

CANDIDATE SA4A Potter 63 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM KEY KEY

1. Use a Qualification Computer Station or PC to determine your GET RADWORKER qualification status prior to entry into the RCA.

The correct answer will be worker dependant. Expect that candidate qualification status is good.

2. Correct task # appropriate for the job scope.

Task #1 (Refueling Operations and support work)

3. Limitations associated with the REP.

No VHRA entry, No entry into >5,000 mRem/hr., No Containment entry in plant modes 1-2

4. Dosimetry required and the appropriate settings.

EPD required with settings of 50 mRem dose, and 1000mRem/hr dose rate.

5. Radiation Protection Coverage Requirements.

RP coverage is Intermittent.

SA4A Potter 64 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM JPM BASIS INFORMATION 1240100202 Classify events requiring emergency plan implementation TASK: 1240100302 Direct an emergency response as the emergency coordinator (EC) 1240100402 Determine protective action recommendations (PAR)

An ALERT is declared within 15 minutes; form EP-0541 is filled out, TASK STANDARD: Notification directed within 15 minutes of classification K/A: 2.4.38 K/A RATING: RO: SRO: 4.0 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): SRO VALIDATION TIME: 15 minutes

REFERENCES:

EPIP-01, Satellite Technical Support Center Actions (Rev 18); EPIP-99, EPIP Standard Appendices, Appendix A (Rev 3)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Warren Potter TECH REVIEW:

REVISION DATE: 6/8/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT SA4A Potter 65 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM

1. SIMULATOR SETUP:

A. The simulator should be in FREEZE after 2005 LOIT NRC Scenario #1.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

  • As left by the scenario.

EVENT COMMAND DESCRIPTION 17.

18.

19.

20.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • Simulator in FREEZE at the conclusion of 2005 LOIT NRC Exam scenario #1.
2. SPECIAL TOOLS/EQUIPMENT:
  • Form EP-0541 available, blocks 1, 2, 4 and 6 complete.
  • A watch or clock to time event classification and notifications.

SA4A Potter 66 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

The following plant conditions apply:

  • You are in Unit 1.

Based on this event and current conditions, perform all On-shift Emergency Coordinator duties for this event per EPIP-01 until properly relieved.

  • This is a time critical JPM.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • This JPM has two (2) Time Critical elements. The first is to classify the event within 15 minutes from the time the initiating cue is given, the second is to initiate/direct the NAN notification by the STSC Communicator within 15 minutes from the time the classification is made.
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.

SA4A Potter 67 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM JPM START TIME:

STEP CUE STANDARD EPIP-01 obtained.

1. Obtain Procedure EPIP-01 Note to evaluator: The critical time to classify the event is 15 minutes from the time the examinee has received the initiating cue.

START TIME:

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Determine if Initial Actions must be Determines that Initial Actions must performed. be performed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3. If a toxic gas release has occurred, No action. No toxic gas release.

then consider the initiation of a CRVIAS.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 68 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD If EPIP-09 entry is required (security Determines there is no security event

4. If Requested CUE: There is no event) and EPIP-09 has not already in progress. Continues in procedure.

security event in progress.

been implemented, then go to EPIP-09 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5. Contact the Shift Manager in the If requested CUE: Only Unit 1 is Contacts other unit SMs to determine other two units to discuss the impacted. if other units are impacted. Continues possibility that EALs may be met or in procedure.

exceeded in more than one unit. If requested CUE: You are the designated on-shift EC.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Requests the services of an STSC

6.
  • If an STSC Communicator is Inform CUE: An STSC Communicator to assume the role.

available in the ECs control room, Communicator qualified person then direct them to assume the STSC has assumed the role of STSC Communicator role. Communicator.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 69 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Uses EPIP-99, Appendix A and

7.
  • Determines EAL Level currently determines EAL as Loss or being met or exceeded. Evaluates the Potential Loss of the RCS (based fission product barrier thresholds and on RCS Leak > 44 gpm or RCS event-based EALs.

leak rate > available makeup capacity as indicated by a loss of RCS subcooling [1-6].

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

8. If time allows, then review the If requested CUE: there is no other Continues on in procedure.

classification with another EC EC qualified person present.

qualified individual.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 70 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Classifies event as an ALERT within

9.
  • If an EAL is currently met or 15 minutes of step 1 START TIME.

exceeded, then the EC determines the highest classification and logs the Record CLASSIFICATION declaration time.

TIME:

  • Total time to classify (Critical <15 min)

Record NOTIFICATION START TIME:

(same as Classification Time above)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10. Add 15 minutes to the time noted in Records time when offsite agencies the previous step to determine when must be commenced.

the notification of the offsite agencies must commence. Record Time: ________________

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

11. EC evaluates and determines if there Determines there has been no has been a transitory condition. transitory condition.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 71 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD

12. If the event in progress endangers Candidate may elect to provide this personnel (e.g. safety or security message. This is not critical to the issues) then transmit the Attention evaluation.

all plant personnel message.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. If the STSC has not already been Inform CUE: The STSC has No message transmittal. Continues activated in the ECs unit, then the already been activated in Unit 1. on in procedure. If a message is on-shift EC transmits the procedural transmitted, that is acceptable.

message..

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

14. Proceed to Section 5.0, ALERT Proceeds to section 5.0, ALERT.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

15. Complete initial steps 5.1, 5.2, and Completes steps 5.1, 5.2, and 5.3.

5.3 of section 5.0 SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 72 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD

16. If the STSC Communicator has Inform CUE: The STSC Directs STSC Communicator to arrived in the control room, then, Communicator has arrived. perform EPIP-01, Appendix C.

Direct the STSC Communicator to perform EPIP-01, Appendix C SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

17. Completes form EP-0541, Palo INFORM CUE: Provide the Verde NAN Emergency Message examinee with the EP-0541 form Form. with blocks 1, 2, 4, and 6 filled out:

Examinee completes steps 3 and 5 of Form EP-0541 as follows:

  • Step 3 ALERT, UNIT 1 Status Code 1-6
  • Step 5 NO Radioactive release is in progress. NO Protective Actions are required (see step 7 below)
  • Reviews form for accuracy and signs step 6.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 73 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Contact Security (CAS) (5.1) If requested CUE: CAS has been Using the telephone or radio contacts 18.

notified. CAS and directs the CAS operator to notify the Security Operations Section Leader to complete supplemental notifications and activate the auto dialer.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Consults Appendix B, Protective

19. Determine appropriate Protective Action Recommendations.

Action Recommendations.

Protective Actions are NONE Recommended Note to evaluator: Examinee may have previously completed this action since it is information to be included on form EP-0541.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 74 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Direct the STSC Communicator to Directs the STSC Communicator to 20.

complete and transmit the Palo Verde transmit NAN form within 15 NAN Emergency Message form. minutes of event CLASSIFICATION TIME in step 9 above.

Note: This step may have been performed at step above. Time STSC Communicator directed:

If requested CUE: The STSC *Total time since Classification Communicator has initiated the START TIME (Critical <15 NAN Message form Minutes.)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD If requested CUE: Site Manager Site Manager notified of the

21. Notify Site Manager.

has been informed to report to the Emergency Situation and directed to Unit 1 Control Room. come to the UNIT 1 Control room to assume the role of On-shift Emergency Coordinator.

SAT / UNSAT Comments (required for UNSAT):

SA4A Potter 75 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Assembles ERO staff for briefing.

22. Assemble the On-shift Emergency Inform CUE: The Radiation Response Organization (ERO) staff Protection Monitor and Shift for an initial briefing in the STSC Technical Advisor have not yet general area. arrived in the STSC. The briefing can be performed when the ERO staff has assembled in the STSC.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD As a minimum, step 5.1.5 Standard

23. Conduct onsite notification using Notification message for ALERT Step 5.1 Flowchart..

is transmitted over the Unit Evacuation System Note: examinee may direct the following (Recommended unless the EC is fairly certain plant conditions will not deteriorate.):

  • Assembly Notification(step If requested CUE: Notifications 5.1.20) and, are complete.

Inform CUE: the Site Manger has

  • Accountability Request(step relieved you as the Emergency 5.1.3)

Coordinator.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT SA4A Potter 76 Rev 0, 6/8/05

SA4A PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

25. Vendor reference document upgrade
26. Plant modification (include number)
27. Procedure upgrade
28. Internal or External Agency Commitment (indicate item number)
29. Technical Specification Change (indicate amendment number)
30. Other (explain in comments)

SA4A Potter 77 Rev 0, 6/8/05

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM INITIAL CONDITIONS INITIATING CUE:

The following plant conditions apply:

  • You are in Unit 1.

Based on this event and current conditions, perform all On-shift Emergency Coordinator duties for this event per EPIP-01 until properly relieved.

  • This is a time critical JPM.

CANDIDATE SA4B Potter 78 Rev 0, 6/10/05

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM JPM BASIS INFORMATION 1240100202 Classify events requiring emergency plan implementation TASK: 1240100302 Direct an emergency response as the emergency coordinator (EC) 1240100402 Determine protective action recommendations (PAR)

An ALERT is declared within 15 minutes; form EP-0541 is filled out, TASK STANDARD: Notification directed within 15 minutes of classification K/A: 2.4.38 K/A RATING: RO: SRO: 4.0 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): SRO VALIDATION TIME: 15 minutes

REFERENCES:

EPIP-01, Satellite Technical Support Center Actions (Rev 18); EPIP-99, EPIP Standard Appendices, Appendix A (Rev 3)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Warren Potter TECH REVIEW:

REVISION DATE: 6/8/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT SA4B Potter 79 Rev 0, 6/10/05

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM

1. SIMULATOR SETUP:

A. The simulator should be in FREEZE after 2005 LOIT NRC Scenario #2.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

  • As left by the scenario.

EVENT COMMAND DESCRIPTION 21.

22.

23.

24.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • Simulator in FREEZE at the conclusion of 2005 LOIT NRC Exam scenario #2.
2. SPECIAL TOOLS/EQUIPMENT:
  • Form EP-0541 available, blocks 1, 2, 4 and 6 complete.
  • A watch or clock to time event classification and notifications.

80

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

The following plant conditions apply:

  • You are in Unit 1.

Based on this event and the conditions just prior to the PBB-S04 restoration, perform all On-shift Emergency Coordinator duties for this event until properly relieved.

  • This is a time critical JPM.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • This JPM has two (2) Time Critical elements. The first is to classify the event within 15 minutes from the time the initiating cue is given, the second is to initiate/direct the NAN notification by the STSC Communicator within 15 minutes from the time the classification is made.
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.

JPM START TIME:

81

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD EPIP-01 obtained.

1. Obtain Procedure EPIP-01 Note to evaluator: The critical time to classify the event is 15 minutes from the time the examinee has received the initiating cue.

START TIME:

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Determine if Initial Actions must be Determines that Initial Actions must performed. be performed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3. If a toxic gas release has occurred, No action. No toxic gas release.

then consider the initiation of a CRVIAS.

SAT / UNSAT Comments (required for UNSAT):

82

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD If EPIP-09 entry is required (security Determines there is no security event

4. If Requested CUE: there is no event) and EPIP-09 has not already in progress. Continues in procedure.

security event in progress.

been implemented, then go to EPIP-09 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5. Contact the Shift Manager in the If requested CUE: Only Unit 1 is Contacts other unit SMs to determine other two units to discuss the impacted. if other units are impacted. Continues possibility that EALs may be met or in procedure.

exceeded in more than one unit. If requested CUE: You are the designated on-shift EC.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Requests the services of an STSC

6.
  • If an STSC Communicator is Inform CUE: An STSC Communicator to assume the role.

available in the ECs control room, Communicator qualified person then direct them to assume the STSC has assumed the role of STSC Communicator role. Communicator.

SAT / UNSAT Comments (required for UNSAT):

83

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Uses EPIP-99, Appendix A and

7.
  • Determines EAL Level currently determines EAL as LOAF such that being met or exceeded. Evaluates the minimum acceptable Feedwater fission product barrier thresholds and flow cannot be maintained [1-8].

event-based EALs.

This applies because actions are taken outside the control room to restore Feedwater (trip 86 relays on the class 1E busses).

Note to evaluator: EAL [2-3]

applies if power is not restored to PBB-S04 within 15 minutes. EAL

[5-9] has been determined NOT to apply to this case since SGs are still a viable heat sink.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

8. If time allows, then review the If requested CUE: there is no other Continues on in procedure.

classification with another EC EC qualified individual present.

qualified individual.

SAT / UNSAT Comments (required for UNSAT):

84

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Classifies event as an ALERT within

9.
  • If an EAL is currently met or 15 minutes of step 1 START TIME.

exceeded, then the EC determines the highest classification and logs the Record CLASSIFICATION declaration time.

TIME:

  • Total time to classify (Critical <15 min)

Record NOTIFICATION START TIME:

(same as Classification Time above)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10. Add 15 minutes to the time noted in Records time when offsite agencies the previous step to determine when must be commenced.

the notification of the offsite agencies must commence. Record Time: ________________

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

11. EC evaluates and determines if there Determines there has been no has been a transitory condition. transitory condition.

SAT / UNSAT Comments (required for UNSAT):

85

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD

12. If the event in progress endangers Candidate may elect to provide this personnel (e.g. safety or security message. This is not critical to the issues) then transmit the Attention evaluation.

all plant personnel message.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. If the STSC has not already been Inform CUE: The STSC has No message transmittal. Continues activated in the ECs unit, then the already been activated in Unit 1. on in procedure. If a message is on-shift EC transmits the procedural transmitted, that is acceptable.

message.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

14. Proceed to Section 5.0, ALERT Proceeds to section 5.0, ALERT.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

15. Complete initial steps 5.1, 5.2, and Completes steps 5.1, 5.2, and 5.3.

5.3 of section 5.0 SAT / UNSAT Comments (required for UNSAT):

86

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD

16.
  • If the STSC Communicator has Inform CUE: The STSC Directs STSC Communicator to arrived in the control room, then, Communicator has arrived. perform EPIP-01, Appendix C.

Direct the STSC Communicator to perform EPIP-01, Appendix C SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

17.
  • Completes form EP-0541, Palo INFORM CUE: Provide the Verde NAN Emergency Message examinee with the EP-0541 form Form. with blocks 1, 2, 4, and 6 filled out:

Examinee completes steps 3 and 5 of Form EP-0541 as follows:

  • Step 3 ALERT, UNIT 1 Status Code 1-8 (maybe 2-3)
  • Step 5 NO Radioactive release is in progress. NO Protective Actions are required (see step 7 below)
  • Reviews form for accuracy and signs step 6.

SAT / UNSAT Comments (required for UNSAT):

87

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Contact Security (CAS) (5.1) If requested CUE: CAS has been Using the telephone or radio contacts 18.

notified. CAS and directs the CAS operator to notify the Security Operations Section Leader to complete supplemental notifications and activate the auto dialer.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Consults Appendix B, Protective

19. Determine appropriate Protective Action Recommendations.

Action Recommendations.

Protective Actions are NONE Recommended Note to evaluator: Examinee may have previously completed this action since it is information to be included on form EP-0541.

SAT / UNSAT Comments (required for UNSAT):

88

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD Direct the STSC Communicator to Directs the STSC Communicator to

20.
  • complete and transmit the Palo Verde transmit NAN form within 15 NAN Emergency Message form.(5.1) minutes of event CLASSIFICATION TIME in step 9 above.

Note: This step may have been performed at step above. Time STSC Communicator directed:

If requested CUE: The STSC *Total time since Classification Communicator has initiated the START TIME (Critical <15 NAN Message form Minutes.)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD If requested CUE: Site Manager Site Manager notified of the

21. Notify Site Manager.

has been informed to report to the Emergency Situation and directed to Unit 1 Control Room. come to the UNIT 1 Control room to assume the role of On-shift Emergency Coordinator.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Assembles ERO staff for briefing.

22. Assemble the On-shift Emergency Inform CUE: The Radiation Response Organization (ERO) staff Protection Monitor and Shift for an initial briefing in the STSC Technical Advisor have not yet general area. arrived in the STSC. The briefing can be performed when the ERO staff has assembled in the STSC.

SAT / UNSAT Comments (required for UNSAT):

89

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM STEP CUE STANDARD As a minimum, step 5.1.5 Standard

23. Conduct onsite notification using Notification message for ALERT Step 5.1 Flowchart..

is transmitted over the Unit Evacuation System Note: examinee may direct the following (Recommended unless the EC is fairly certain plant conditions will not deteriorate.):

  • Assembly Notification(step If requested CUE: Notifications 5.1.20) and, are complete.

Inform CUE: the Site Manger has

  • Accountability Request(step relieved you as the Emergency 5.1.3)

Coordinator.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT 90

SA4B PVNGS JOB PERFORMANCE MEASURE 2005 NRC SRO EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/10/05 New JPM created for 2005 LOIT NRC Exam REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

31. Vendor reference document upgrade
32. Plant modification (include number)
33. Procedure upgrade
34. Internal or External Agency Commitment (indicate item number)
35. Technical Specification Change (indicate amendment number)
36. Other (explain in comments) 91

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

The following plant conditions apply:

  • You are in Unit 1.

Based on this event and the conditions just prior to the PBB-S04 restoration, perform all On-shift Emergency Coordinator duties for this event until properly relieved.

  • This is a time critical JPM.

CANDIDATE JP1 Capehart 92 Rev 0, 6/10/05

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1240028801 - Energize PKD-M44 From the D Battery Charger TASK STANDARD: PKD-M44 is energized from BD Battery Charger K/A: 4.2.058AA1.03 K/A RATING: RO: 3.1 SRO: 3.3 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 20 minutes

REFERENCES:

40EP-9EO10, Standard Appendices, Appendix 97 (Rev 35)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 6/10/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JP1 Capehart 93 Rev 0, 6/10/05

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: N/A B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 25.

26.

27.

28.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • Copy of Appendix 97of 40EP-9EO10, Standard Appendices.

94

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • Following a Reactor Trip, a fault on the battery bank resulted in PKD-M44 being de-energized.
  • The affected battery cell has been jumpered out by Electricians and PKD-M44 has been cleared for restoration.
  • The Control Room Supervisor now directs you to place Battery Charger D on PKD-M44 using Appendix 97 of 40EP-9EO10, Standard Appendices.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

95

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD Perform the following on Battery

1. AC POWER input breaker is in Examinee locates AC POWER input Charger D, PKD-H14:

OFF. breaker and verifies it is OFF.

(DC Equipment Room D)

a. Ensure the AC POWER input breaker is in OFF.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. b. Ensure the DC POWER output DC POWER input breaker is in Examinee locates DC POWER input breaker is in OFF. OFF. breaker and verifies it is OFF.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

c. Ensure that the mode selector
3. MODE SELECTOR Switch in Examinee locates the MODE switch is in FLOAT.

FLOAT. SELECTOR switch and verifies it is FLOAT.

SAT / UNSAT Comments (required for UNSAT):

96

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Ensure that breaker PHB-M3209,

4. Breaker PHB-M3209 is ON and Examinee locates PHB-M3209 and BATTERY CHARGER D E-the contactor is CLOSED. verifies it is ON and that the PKD-H14 is ON and the contactor is CLOSED.

contactor is closed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD IF PKD-M44 is de-energized,

5. Breaker PKD-M4406, Examinee locates PKD-M4406 and THEN ensure that breaker PKD-INVERTER D E-PND-N14, is verifies it is OPEN.

M4406, INVERTER D E-PND-open.

N14, is open.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Ensure that breaker PKD-M4405;

6. Breaker PKD-M4405, 125V DC Examinee locates PKD-M4405 and 125V DC BACK-UP BAT CHGR BACK-UP BAT CHGR BD, is verifies it is OPEN.

BD E-PKB-H16 is open.

open.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Ensure that breaker PKD-M4404,

7. Breaker PKD-M4404, 125V DC Examinee locates PKD-M4404 and 125V DC NORM BAT CHGR D NORM BAT CHGR D, is verifies it is CLOSED.

E-PKD-H14, is closed.

closed.

SAT / UNSAT Comments (required for UNSAT):

97

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Close the DC POWER output

8.
  • The DC POWER output Examinee locates the DC POWER breaker.

breaker is CLOSED. output breaker closes it.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD WHEN at least 1 minute has elapsed

8.
  • 1 minute has passed. Examinee locates the AC POWER since closing the DC POWER input breaker and closes it.

output breaker, THEN close the AC The AC POWER input breaker POWER input breaker.

is CLOSED.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Check that battery charger voltage

9.
  • The battery charger voltage is Examinee locates the D Battery indicates 130 - 140 VDC.

reading 100 VDC. Charger Voltage meter and notes the reading is below the specified level.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Inform the responsible operator that

10.
  • The CRS informs you that he will Examinee contacts the Control Room this attachment is complete but with contact Electrical Maintenance to for guidance.

a problem noted.

troubleshoot Battery Charger D and directs you to remove Battery Charger D and align Battery Charger BD to PKD-M44 in accordance with Attachment 97-B.

If the examinee request guidance to back out of this appendix, direct him to follow Attachment 97-B as it will take care of the alignment.

SAT / UNSAT Comments (required for UNSAT):

98

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Perform the following on Battery

11. AC POWER input breaker is in Examinee locates AC POWER input Charger BD, PKD-H16:

OFF. breaker and verifies it is OFF.

(DC Equipment Room B)

a. Ensure the AC POWER input breaker is in OFF.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD CHARGER OUTPUT TO PKD-

12. b. Ensure that BOTH of following Examinee locates Charger Output M4405 and M4205 is in OFF.

breakers are in OFF. breakers and verifies they are OFF.

o CHARGER OUTPUT TO PKD-M4405 o CHARGER OUTPUT TO PKD-M4205 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

c. Ensure that the mode selector
13. MODE SELECTOR Switch in Examinee locates the MODE switch is in FLOAT.

FLOAT. SELECTOR switch and verifies it is FLOAT.

SAT / UNSAT Comments (required for UNSAT):

Ensure that breaker PHB-M3425,

14. Another AO has verified that Examinee verifies that PHB-M3425 BATTERY CHARGER BD E-Breaker PHB-M3425 is ON and is ON and that the contactor is PKD-H16 is ON and the the contactor is CLOSED. CLOSED.

contactor is closed.

SAT / UNSAT Comments (required for UNSAT):

99

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD IF PKD-M44 is de-energized,

15. Breaker PKD-M4406, Examinee locates PKD-M4406 and THEN ensure that breaker PKD-INVERTER D E-PND-N14, is verifies it is OPEN.

M4406, INVERTER D E-PND-open.

N14, is open.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Ensure that breaker PKD-M4404;

16. Breaker PKD-M4404, 125V DC Examinee locates PKD-M4404 and 125V DC NORM BAT CHGR D NORM BAT CHGR D, is open. verifies it is OPEN.

E-PKB-H14 is open.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Ensure that breaker PKD-M4405,

17. Breaker PKD-M4405, 125V DC Examinee locates PKD-M4405 and 125V DC BACK-UP BAT CHGR BACK-UP BAT CHGR D, is verifies it is CLOSED.

D E-PKD-H16, is closed.

closed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Close the CHARGER OUTPUT TO

18.
  • The CHARGER OUTPUT TO Examinee locates the CHARGER PKD-M4405.

PKD-M4405 is CLOSED. OUTPUT TO PKD-M4405 and closes it.

SAT / UNSAT Comments (required for UNSAT):

100

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Close the AC POWER input

19.
  • The AC POWER input breaker Examinee locates the AC POWER breaker.

is CLOSED. input breaker and closes it.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Check that battery charger voltage

20.
  • BD Battery charger voltage Examinee locates the BD Battery indicates 130 - 140 VDC.

indicates 130 VDC. Charger Voltage output indicator.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Inform the responsible operator that

10. Examinee contacts the Control this attachment is complete.

Room.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT 101

JP-1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6 6/10/05 New JPM REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

37. Vendor reference document upgrade
38. Plant modification (include number)
39. Procedure upgrade
40. Internal or External Agency Commitment (indicate item number)
41. Technical Specification Change (indicate amendment number)
42. Other (explain in comments) 102

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIATING CUE:

  • Following a Reactor Trip, a fault on the battery bank resulted in PKD-M44 being de-energized.
  • The affected battery cell has been jumpered out by Electricians and PKD-M44 has been cleared for restoration.
  • The Control Room Supervisor now directs you to place Battery Charger D on PKD-M44 using Appendix 97 of 40EP-9EO10, Standard Appendices.

CANDIDATE JP2 Shannon 103 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1250440201, Respond to a Control Room fire.

TASK STANDARD: Line up a Borated Water Source during Control Room Fire K/A: 4.2-068-AA1.11 K/A RATING: RO: 3.9 SRO: 4.1 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): AO VALIDATION TIME: 15 minutes

REFERENCES:

40AO-9ZZ19, Control Room Fire (Rev 14)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Alan Malley TECH REVIEW:

REVISION DATE: 08/31/04 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JP2 Shannon 104 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: N/A B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 29.

30.

31.

32.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • Copy of 40AO-9ZZ19, Appendix G JP2 Shannon 105 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The control room has been evacuated due to a fire.
  • You have been directed by the CRS to perform the Upper Auxiliary Building Actions that are necessary to line up a borated water source to the charging pumps, from the RWT, per 40AO-9ZZ19, Control Room Fire, Appendix G, steps 1-6.
  • Assume you have a portable lantern per step 1.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JP2 Shannon 106 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain procedure 40AO-9ZZ19, If requested, CUE: Assume you Examinee obtains procedure 40AO-Control Room Fire, Appendix G. have the portable lantern. 9ZZ19, Control Room Fire, Appendix G.

Note: Procedure provided by examiner.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2.
  • Open the following disconnects on DS 26-07, DS 24-17, DS-22-13 and Examinee simulates opening ZAN-C01: DS-22-14 knife switches are in the disconnects DS 26-07, DS 24-17, fully down position, not in DS-22-13 and DS-22-14.
  • DS 26-07 electrical contact.
  • DS 24-17 NOTE: Located 120 Aux Bldg hallway east
  • DS 22-13
  • DS 22-14 SAT / UNSAT Comments (required for UNSAT):

JP2 Shannon 107 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

3.
  • Open the following disconnects on DS 18-04, DS 16-06, DS-16-10 and Examinee simulates opening ZAN-C02: DS-16-14 knife switches are in the disconnects DS 18-04, DS 16-06, fully down position, not in DS-16-10 and DS-16-14
  • DS 18-04 electrical contact.
  • DS 16-06 NOTE: Located 120 Aux Bldg hallway east
  • DS 16-10
  • DS 16-14 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

4.
  • Perform the following at NHN- Examinee simulates placing CS-3 in M7209, RWT Gravity Feed Line to local Charging Pump Suction CHE-HV- CS-3 is in local Examinee simulates opening CHE-536: CHE-HV-536 RED light is on, HV-536 a) Place CS-3 in Local GREEN light is off (at NHN-M7209).

b) Open CHE-HV-536 using NOTE: Located 120 Aux Bldg the local control switch hallway east SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5.
  • Perform the following at NHN- Examinee simulates placing CS-3 in M7208, VCT outlet CHN-UV-501: local CS-3 is in local a) Place CS-3 in the local position Examinee simulates closing CHN-UV-501.

b) Close CHN-UV-501, VCT CHN-UV-501 GREEN light on, outlet using the local control RED light is off (at NHN-M7208).

switch.

SAT / UNSAT Comments (required for UNSAT):

JP2 Shannon 108 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

6. Inform the CRS that the charging CRS has been notified that the Examinee simulates notifying the pump suction has been shifted to the charging pump suction is aligned CRS that the charging pump suction RWT. to the RWT. is aligned to the RWT.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JP2 Shannon 109 Rev 1 6/3/05

AO017-PL-002 JP2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 1 08/31/04 6 Cue to perform steps 1 - 6 to include contacting the control room.

REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

43. Vendor reference document upgrade
44. Plant modification (include number)
45. Procedure upgrade
46. Internal or External Agency Commitment (indicate item number)
47. Technical Specification Change (indicate amendment number)
48. Other (explain in comments)

JP2 Shannon 110 Rev 1 6/3/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The control room has been evacuated due to a fire.
  • You have been directed by the CRS to perform the Upper Auxiliary Building Actions that are necessary to line up a borated water source to the charging pumps, from the RWT, per 40AO-9ZZ19, Control Room Fire, Appendix G, steps 1-6.
  • Assume you have a portable lantern per step 1.

CANDIDATE JP3 Shannon 111 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1250065201 Align local air /nitrogen bottle to the Fuel Transfer Canal Gate Seal TASK STANDARD: Pressurize the Fuel Transfer Canal Gate Seal K/A: 3.8-078-K4.02 K/A RATING: RO: 3.2 SRO: 3.5 K/A: 3.8-078-A3.01 K/A RATING: RO: 3.1 SRO: 3.2 APPLICABLE POSITION(S): AO VALIDATION TIME: 15 minutes

REFERENCES:

40AO-9ZZ06, R15, Loss of Instrument Air, Appendix I (Rev 15)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR PLANT X JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Jim Shannon TECH REVIEW:

REVISION DATE: 6/08/2005 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT X TESTING METHOD: SIMULATE X PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JP3 Shannon 112 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: N/A B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

33. N/A 34.

35.

36.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • N/A JP3 Shannon 113 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

The unit was operating at 100% power when a loss of instrument air occurred. The CRS entered 40AO-9ZZ06, the Loss of Instrument Air procedure, and directed the performance of Appendix H to align the local air/nitrogen bottle to the Fuel Transfer Canal Gate Seal and to verify the pressure to the Cask Loading Pit Gate and the Decon Washdown Pit Gate.

The instrument air system has been returned to service.

The CRS directs you to realign instrument air to the Transfer Canal Gate Seal, and to place the Cask Loading Pit Gate and the Decon Washdown Pit Gate nitrogen bottles in standby per 40AO-9ZZ06, Appendix I, starting at step 3.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.

JP3 Shannon 114 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JP3 Shannon 115 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Ensure IAN-V320, Instrument Air IAN-V320, has turned fully open. Examinee simulates opening IAN-Isolation to Gate Seals, is open. V320.

140 ft Fuel Bldg. North of the Cask Pit in Zone 3.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Ensure IAN-PCV-137, Fuel Bldg IAN-PCV-137, IS SET FOR 41.5 Examinee simulates verifying IAN-Instrument Air Header Press Control PSIG. PCV-137 is set for 39.5 - 43.5 PSIG.

Valve, is set for 39.5 - 43.5 PSIG.

140 ft Fuel Bldg. North of the Cask Pit in Zone 3.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3.
  • Open IAN-VE90 Air Isolation from IAN-VE90 has turned fully open. Examinee simulates opening IAN-IA Header (140 Fuel Bldg North VE90.

Wall on local panel).

SAT / UNSAT Comments (required for UNSAT):

JP3 Shannon 116 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

4.
  • Open IAN-VG21 Cask Loading Pit IAN-VG21 has turned fully open. Examinee simulates opening IAN-and Decon Area Gate Isolation VG21.

Valve (140 Fuel Bldg North Wall).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5. PERFORM THE FOLLOWING The Nitrogen / Air bottle #1 Examinee simulates adjusting the FOR TRANSFER CANAL GATE Pressure Regulator Control Knob Nitrogen / Air bottle #1 Pressure SEAL NITROGEN / AIR BOTTLE is adjusted to the fully counter Regulator Control Knob to the fully
  1. 1: (PCV-219A): clockwise position, minimum counter clockwise position.

output and no spring pressure.

Ensure that the Nitrogen / Air bottle

  1. 1 Pressure Regulator Control (PCV-219A) knob is adjusted to the fully counter clockwise position, minimum output no spring pressure.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6.
  • Close the Nitrogen / Air bottle #1 The Nitrogen / Air bottle #1 Examinee simulates closing the isolation valve. isolation valve has turned fully Nitrogen / Air bottle #1 isolation closed. valve.

SAT / UNSAT Comments (required for UNSAT):

JP3 Shannon 117 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

7.
  • Unit 2 & 3 only - The Nitrogen / Air bottle #1 Examinee simulates closing the Pressure Regulator Outlet Valve Nitrogen / Air bottle #1 Pressure Close the Nitrogen / Air bottle #1 has turned fully closed. Regulator Outlet Valve.

Pressure Regulator Outlet Valve.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

8.
  • Close IAN-VE92, Local Air / IAN-VE92, Local Air / Nitrogen Examinee simulates closing IAN-Nitrogen Bottle #1 Header Isolation Bottle #1 Header Isolation Valve VE92, Local Air / Nitrogen Bottle Valve. has turned fully clockwise. #1 Header Isolation Valve.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9. PERFORM THE FOLLOWING The Nitrogen / Air bottle #2 Examinee simulates adjusting the FOR TRANSFER CANAL GATE Pressure Regulator Control Knob Nitrogen / Air bottle #2 Pressure SEAL NITROGEN / AIR BOTTLE is adjusted to the fully counter Regulator Control Knob to the fully
  1. 2 (PCV-219B): clockwise position, minimum counter clockwise position.

output and no spring pressure.

Ensure that the Nitrogen / Air bottle

  1. 2 Pressure Regulator Control (PCV-219B) knob is adjusted to the fully counter clockwise position, minimum output no spring pressure.

SAT / UNSAT Comments (required for UNSAT):

JP3 Shannon 118 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

10.
  • Close the Nitrogen / Air bottle #2 The Nitrogen / Air bottle #2 Examinee simulates closing the isolation valve. isolation valve has turned fully Nitrogen / Air bottle #2 isolation closed. valve.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

11.
  • Unit 2 & 3 only - The Nitrogen / Air bottle #2 Examinee simulates closing the Pressure Regulator Outlet Valve Nitrogen / Air bottle #2 Pressure Close the Nitrogen / Air bottle #2 has turned fully closed. Regulator Outlet Valve.

Pressure Regulator Outlet Valve.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

12.
  • Close IAN-VE94, Local Air / IAN-VE94, Local Air / Nitrogen Examinee simulates closing IAN-Nitrogen Bottle #2 Header Isolation Bottle #2 Header Isolation Valve VE94, Local Air / Nitrogen Bottle Valve. has turned fully closed. #2 Header Isolation Valve.

SAT / UNSAT Comments (required for UNSAT):

JP3 Shannon 119 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

13.
  • Ensure all of the following pressure The following isolation valves have Examinee simulates closing all the indicator isolation valves are closed. turned fully clockwise: following isolation valves:
  • IAN-VF98, IAN-PI-282A (A
  • IAN-VF98 has been turned
  • IAN-VF98, IAN-PI-282A Train IA Supply to Decon fully closed. Isolation Valve.

Washdown Pit Gate), Isolation

  • IAN-VF89, IAN-PI-278 Valve. Isolation Valve.
  • IAN-VF89, IAN-PI-278 (A
  • IAN-VF89 has been turned
  • IAN-VF94, IAN-PI-281A Train IA Backup Supply to Cask fully closed. Isolation Valve.

Loading & Decon Washdown

  • IAB-VG11, IAN-PI-281B Gate), Isolation Valve. Isolation Valve.
  • IAN-VF94, IAN-PI-281A (A
  • IAN-VF94 has been turned
  • IAB-VG06, IAN-PI-284 Train IA Supply to Cask fully closed. Isolation Valve.

Loading Pit Gate), Isolation

  • IAB-VG15, IAN-PI-282B Valve. Isolation Valve
  • IAB-VG11, IAN-PI-281B (B
  • IAB-VG11 has been turned Train IA Supply to Cask fully closed.

Loading Pit Gate) Isolation Valve.

  • IAB-VG06, IAN-PI-284 (B
  • IAB-VG006 has been turned Train IA Backup Supply to Cask fully closed.

Loading & Decon Washdown Gate) Isolation Valve.

  • IAB-VG15, IAN-PI-282B (B
  • IAB-VG15 has been turned Train IA Supply to Decon fully closed.

Washdown Pit Gate) Isolation Valve.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JP3 Shannon 120 Rev 0, 6/8/05

JP 3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/8/2005 New Created JPM for 2005 LOIT NRC Exam.

REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

49. Vendor reference document upgrade
50. Plant modification (include number)
51. Procedure upgrade
52. Internal or External Agency Commitment (indicate item number)
53. Technical Specification Change (indicate amendment number)
54. Other (explain in comments)

JP3 Shannon 121 Rev 0, 6/8/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

The unit was operating at 100% power when a loss of instrument air occurred. The CRS entered 40AO-9ZZ06, the Loss of Instrument Air procedure, and directed the performance of Appendix H to align the local air/nitrogen bottle to the Fuel Transfer Canal Gate Seal and to verify the pressure to the Cask Loading Pit Gate and the Decon Washdown Pit Gate.

The instrument air system has been returned to service.

The CRS directs you to realign instrument air to the Transfer Canal Gate Seal, and to place the Cask Loading Pit Gate and the Decon Washdown Pit Gate nitrogen bottles in standby per 40AO-9ZZ06, Appendix I, starting at step 3.

CANDIDATE JS1 Shannon 122 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0120020701 Fill a safety injection tank TASK STANDARD: Fill the 1A Safety Injection Tank.

K/A: 3.2-006-A4.01 K/A RATING: RO: 4.1 SRO: 3.9 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 25 minutes

REFERENCES:

40OP-9SI03, Safety Injection Tank Operations (Rev 27); 40AL-9RK2B, Window 2B05A, Rev 48 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: John M. Dedon TECH REVIEW:

REVISION DATE: 11/19/03 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS1 Shannon 123 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: 20 B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

37. See BELOW C. REQUIRED CONDITIONS:
  • Drain 1A SIT to 40% NR as follows:

o SIE-V463 OPEN (MRF SI03 OPEN) o SIA-V459 10 (MRF SI04 10) o Open SIA-UV-682 o Open SIB-UV-631 and drain 1A SIT to 40% NR o Close SIB-UV-631 o Close SIA-UV-682 o SIA-V459 0 (MRF SI04 CLOSED)

  • Modify the following Remote Functions:
  • MRF SI02 100 (SI-V219 open)
  • Acknowledge any alarms
  • Provide Initiating CUE.
  • Go to RUN on Simulator STEP COMMAND DESCRIPTION
7. When directed to open SIE-V463, In setup (4.5.11) report it is open.
10. When directed to open SIE-V219, In setup (4.5.13) report it is open.
14. When directed to open SIB UV Per the procedure SI03.

(4.5.15) 667, MRF MV09:SIBUV667 100

15. When directed to throttle SIB UV Report valve SIB-UV-667 is 9 turns closed from full open (even (4.5.16) 667 9 turns from full open, MRF though it is nearly closed). This brings in the low flow alarm in MV09:SIBUV667 1 step 15.
18. When directed to open SIB UV Per the alarm response.

667, MRF MV09:SIBUV667 100

23. When directed to throttle SIB UV Report valve is 9 turns from full open and has been verified.

667 to 9 turns from full open, MRF MV09:SIBUV667 3

24. When directed to throttle SIB UV A valve position of 40% is approximately equal to a disch press 667, to obtain a disch press of of 1400 psig.

1400 psig. MRF MV09:SIBUV667 40 JS1 Shannon 124 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

26. When directed to throttle open Report SIB-V-400 is open.

SIB-V400, MRF SI05 10

2. SPECIAL TOOLS/EQUIPMENT:
  • None JS1 Shannon 125 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The CRS directs you to line up and fill the "1A" Safety Injection Tank to 49% on the narrow range instrument in accordance with 40OP-9SI03, section 4.5.
  • B HPSI pump is available.
  • No HPSI injection valves are known to leak.
  • All prerequisites are met.
  • Steps 4.5.1 through 4.5.4 have been completed.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS1 Shannon 126 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtains 40OP-9SI03. Obtains 40OP-9SI03.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Ensure SIE-HV-661 closed. Examinee verifies valve is closed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3. Ensure SIA-UV-682 closed. Examinee verifies valve is closed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

4. Verify that Appendix D, Train B Appendix D, Train B HPSI Header Examinee verifies that Appendix D, HPSI Header Venting OR 41ST- Venting, has been completed. Train B HPSI Header Venting OR 9SI07 has been completed. 41ST-9SI07 has been completed.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 127 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

5. Verify if HPSI Pump B is being HPSI Pump B is NOT being Examinee verifies if HPSI Pump B is restored from an outage/maintenance restored from an outage or being restored from an condition. maintenance condition. outage/maintenance condition.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6. If any of the following exist: Examinee verifies venting does not have to be performed.

Maintenance has not been performed Maintenance has not been on theSI system. performed on theSI system.

It cannot be determined if the seal The seal cavity has been vented.

cavity has been vented.

The CRS/ Shift Manager does not The CRS/ Shift Manager directs that direct HPSI Pump B to be vented.

HPSI Pump B to be vented.

Then perform venting.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

7.
  • Direct AO to unlock and open SIE- If asked: SIE-V463 is open. Examinee directs operator to unlock V463. and open SIE-V463.

NOTE: Valve operation part of Simulator Setup.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 128 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

8. Insert manual SESS Containment Examinee inserts a manual SESS Isolation alarm during the time SIE- Containment Isolation alarm when V463 is open. SIE-V463 is opened.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9. Assign an AO to close SIE-V463 per If Asked: An operator has been Examinee assigns operator to close 40DP-9OP19. assigned to close SIE-V463 if SIE-V463 if needed.

needed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10.
  • Direct an AO to unlock and open If Asked: SIB-V219 is open. Examinee directs operator to unlock SIB-V219. and open SIB-V219.

NOTE: Valve operation part of Simulator Setup.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

11. Note the time HPSI Pump "B" is Examinee notes the time SIB-V219 inoperable. was opened and HPSI "B" became inoperable.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 129 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

12. Inform the CRS/SM of HPSI B CRS has been informed. Examinee informs the CRS/SM of status. HPSI "B" inoperable.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. Insert a manual SESS alarm for the Examinee inserts a manual SESS HPSI "B" pump. alarm for "B" SI.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

14.
  • Direct AO to unlock and fully open Examinee directs operator to unlock SIB-UV-667. and fully open SIB-UV-667.

NOTE: Driver action required.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 130 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

15. Direct AO to close SIB-UV-667 Instructor note: Valve is actually Examinee directs operator to close Nine (9) turns from full open. almost fully closed. SIB-UV-667 9 turns from full open.

NOTE: Simulator driver action required to throttle valve.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

16.
  • Start HPSI pump "B" on Recirc to Examinee starts HPSI pump "B".

RWT.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

17. Check for the following expected If asked: The CRS directs you to Examinee verifies HPSI B Amps <

indications: respond to the alarm by referring 138 and refers to HPSI LOOP 1/2 to the appropriate alarm response. FLOW LO, SIFS304 annunciator.

  • Motor amps less than 138 amps. Note: Transitions to Alarm Response

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 131 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

18.
  • Ensure that HPSI PUMP B RECIRC Instructor Note: HPSI PUMP A Examinee directs an AO to open VLV, SIB-UV-667 is open. RECIRC VLV, SIA-UV-666, is N/A HPSI PUMP B RECIRC VLV, SIB-(HPSI A not running). UV-667.

Note: Examinee may either direct an AO to open the valve or open it from the control room.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

19. Ensure that TRAIN B PUMPS Instructor Note: TRAIN A PUMPS Ensure that TRAIN B PUMPS COMBINED RECIRC TO RWT COMBINED RECIRC TO RWT COMBINED RECIRC TO RWT VLV, SIB-UV-659 is open. VLV, SIA-UV-660, is N/A (HPSI A VLV, SIB-UV-659 is open.

not running).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

20. If the minimum flow requirements Examinee determines that the cannot be maintained, then trip the minimum flow requirements are affected HPSI Pump. being maintained because the HPSI LOOP 1/2 FLOW LO alarm cleared when the HPSI PUMP B RECIRC VLV, SIB-UV-667, was opened.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 132 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

21. Direct the Nuclear Operator to check A Nuclear Operator has checked Examinee directs a Nuclear Operator the valve lineup for HPSI Pump B the valve lineup for the HPSI to check the valve lineup for HPSI and its recirc flow path. Pump B and its recirc flow path Pump B and its recirc flow path.

and finds nothing wrong.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

22. Perform an independent verification A Nuclear Operator has on all applicable valves, breakers and performed an independent components that were operated by verification on all applicable this alarm response per 02DP- valves. The operator has 0ZZ01, Verification of Plant determined that before the alarm Activities. response steps were taken that HPSI PUMP B RECIRC VLV, SIB-UV-667, was found just barely cracked open. It is now 100% Note: Must now transition back to open. 40OP-9SI03 The CRS directs you to continue with filling 1A Safety Injection Tank.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

23. Direct AO to throttle SIB-UV-667 to Examinee directs operator to throttle bring discharge pressure to 1400 psig SIB-UV-667 as necessary to achieve as seen on SI-PI-309. 1400 psig discharge pressure.

Note: Simulator driver action required to throttle valve.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 133 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

24.
  • Open SIA-UV-682. Examinee opens SIA-UV-682 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

25. Direct AO to unlock and throttle Examinee directs operator to unlock open SIB-V400 slowly to control and throttle open SIB-V400.

SIT fill rate.

NOTE: Simulator driver action required to throttle SIB-V400.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

26. Check SIT Fill and Drain manual If requested: The SIT manual Examinee verifies SIE-V230 open.

Isolation valve for SIT 1A is Open. isolation valve SIE-V230 is open.

It has not been closed.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 134 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

27.
  • Commence filling the SIT by: Examinee notes beginning SIT level and opens SIB-UV-631.
  • Record beginning SIT level for Chemistry
  • Open SIT fill and drain SIB-UV- NOTE: Opening of SIB-UV-631 is 631. critical portion of step.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

28. Check that all available SIT Examinee verifies Level and pressure indications track properly. increasing on SIT 1A.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

29.
  • WHEN the desired SIT level is When SIB-UV-631 is closed CUE: Examinee closes SI-UV-631 when reached (49% NR), THEN close Another RO has been assigned to SIT level is 49% NR (level > 44%

SIB-UV-631. complete the remainder of this and < 55% NR) section of the procedure.

Examinee may have to vent the SIT while filling. This will be done in accordance with section 4.4 of 40OP-9SI03.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS1 Shannon 135 Rev 1 6/6/05

SI004-CR-000 JS1 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

55. Vendor reference document upgrade
56. Plant modification (include number)
57. Procedure upgrade
58. Internal or External Agency Commitment (indicate item number)
59. Technical Specification Change (indicate amendment number)
60. Other (explain in comments)

JS1 Shannon 136 Rev 1 6/6/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The CRS directs you to line up and fill the "1A" Safety Injection Tank to 49%

on the narrow range instrument in accordance with 40OP-9SI03, section 4.5.

  • B HPSI pump is available.
  • No HPSI injection valves are known to leak.
  • All prerequisites are met.
  • Steps 4.5.1 through 4.5.4 have been completed.

CANDIDATE JS2 Potter 137 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0780031301, Transfer 13.8KV bus S01 From 13.8KV Bus S03 to the Unit Auxiliary Transformer MAN-X02 TASK STANDARD: Transfers 13.8KV bus S01 From 13.8KV Bus S03 to the Unit Auxiliary Transformer MAN-X02 K/A: 3.6-062-K1.04 K/A RATING: RO: 3.7 SRO: 4.2 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 15 minutes

REFERENCES:

40OP-9NA03, 13.8KV Electrical System (NA) (Rev 16) 41AL-1RK1A, Panel B01A Alarm Responses (Rev 37)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Alan Malley TECH REVIEW:

REVISION DATE: 10/22/03 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS2 Potter 138 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: Any IC with the Main Generator on line > 20% power.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

38. Go to RUN on the Simulator
39. Ensure NAN-S01 and S02 are transferred to S03 and S04 respectively per 40OP-9NA03, Sections 7.0 and 11.0, and then acknowledge alarms.
40. IMF BK01:NANS04B Auto trip logic failure. Prevents NAN-S04B from opening automatically.

C. SPECIAL INSTRUCTIONS:

  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • None JS2 Potter 139 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The Unit's power is being supplied from offsite power (startup transformers).
  • The CRS directs you to transfer Unit loads to the Unit Auxiliary Transformer, MAN-X02, in accordance with 40OP-9NA03.
  • All prerequisites have been performed.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS2 Potter 140 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain procedure 40OP-9NA03 and 40OP-9NA03 obtained.

refers to section 4.8 or section 4.9.

Note: JPM starts at procedure step 4.8. If examinee goes to section 4.9 first, start at JPM step 8.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2.
  • Turn the Synchronizing Switch for Examinee places synchronizing NAN-S01 Supply Breaker, NAN-SS- switch NAN-SS-S01A to ON and S01A, to ON and check for proper verifies proper synchronization synchronization. indicated by MAN-EI-002I, MAN-EI-002R and synchronizing scope at the 12 oclock position.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3.
  • Close the NAN-S01 Supply breaker Examinee closes NAN-S01A using NAN-S01A by turning handswitch NAN-HS-S01A and checks red NAN-HS-S01A to CLOSE. closed light illuminated.

SAT / UNSAT Comments (required for UNSAT):

JS2 Potter 141 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

4. Check that the NAN-S03-NAN-S01 Examinee verifies NAN-S03B opens Supply breaker, NAN-S03B, when NAN-HS-S01A is released by automatically opens when checking the green open light is handswitch NAN-HS-S01A is illuminated on NAN-HS-S03B.

released.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5. Check that NAN-S01 voltage is Examinee verifies voltage between between 12.42KV - 14.49KV. 12.42 and 14.49 KV on voltmeter NAN-EI-S01.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6. Turn the Synchronizing Switch for Examinee places synchronizing NAN-S01 Supply Breaker, NAN-SS- switch, NAN-SS-S01A to OFF.

S01A to OFF.

SAT / UNSAT Comments (required for UNSAT):

JS2 Potter 142 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

7. Perform the appropriate section of Examinee determines that the related Appendix D - S/U Xfmr Winding Startup Transformer is not supply Loading Guidance, if a related more than one unit and does not Startup Xfmr winding is supplying perform Appendix D.

more than one unit.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

8.
  • Turn the Synchronizing Switch for Examinee places synchronizing NAN-S02 Supply Breaker, NAN-SS- switch NAN-SS-S02A to ON and S02A to ON and check for proper verifies proper synchronization synchronization. indicated by MAN-EI-002I, MAN-EI-002R and synchronizing scope at the 12 oclock position.

Note: These steps are for procedure section 4.9 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9.
  • Close the NAN-S02 Supply Breaker Examinee closes NAN-S02A using NAN-S02A by turning handswitch NAN-HS-S02A and checks red NAN-HS-S02A to CLOSE. closed light illuminated.

SAT / UNSAT Comments (required for UNSAT):

JS2 Potter 143 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

10.
  • Check that the NAN-S04-NAN-SO2 If requested CUE: Understand Examinee verifies NAN-S04B did Supply Breaker NAN-S04B, that NAN-SO4B did not open. NOT automatically open when automatically opens when NAN-HS-S02A is released by handswitch NAN-HS-S02A is checking that the red closed light is released. still illuminated on NAN-HS-S04B.

Note: Refers to alarm response procedure 41AL-1RK1A, window 1A18B.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

11.
  • In accordance with response for Examinee manually opens NAN-1A18B, 13.8KV PWR SOURCES S04B using NAN-HS-S04B and PARALLELED, trip the running checks green open light is breaker (NAN-S04B). illuminated.

SAT / UNSAT Comments (required for UNSAT):

JS2 Potter 144 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

12. Check that NAN-S02 voltage is Examinee verifies voltage between between 12.42 KV - 14.49 KV. 12.42 and 14.49 KV on voltmeter NAN-EI-S02.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. Turn the Synchronizing Switch for Examinee places synchronizing NAN-S02 Supply Breaker, NAN-SS- switch, NAN-SS-S02A to OFF.

S02A to OFF.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

14. Perform the appropriate section of Examinee determines that the related Appendix D - S/U Xfmr Winding Startup Transformer is not supply Loading Guidance, if a related more than one unit and does not Startup Xfmr winding is supplying perform Appendix D.

more than one unit.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS2 Potter 145 Rev 0 6/7/05

NA002-CR-000 JS2 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

61. Vendor reference document upgrade
62. Plant modification (include number)
63. Procedure upgrade
64. Internal or External Agency Commitment (indicate item number)
65. Technical Specification Change (indicate amendment number)
66. Other (explain in comments)

JS2 Potter 146 Rev 0 6/7/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The Unit's power is being supplied from offsite power (startup transformers).
  • The CRS directs you to transfer Unit loads to the Unit Auxiliary Transformer, MAN-X02, in accordance with 40OP-9NA03.
  • All prerequisites have been performed.

CANDIDATE JS3 Shannon 147 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0150030801 Perform a BDAS Alarm check (Appendix 8) within one hour.

TASK STANDARD: Perform a BDAS Alarm check (Appendix 8) within one hour.

K/A: 3.7.015.A3.03 K/A RATING: RO: 3.9 SRO: 3.9 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 20 minutes

REFERENCES:

40EP-9EO10, Appendix 8, (Rev 35)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Jim Shannon TECH REVIEW:

REVISION DATE: 06/06/05 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS3 Shannon 148 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: Any Power IC (suggest IC 20)

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 41.

42.

43.

44.

C. SPECIAL INSTRUCTIONS:

  • Starting from any power IC, Trip the reactor and allow reactor power to decay to less than 2x10-6%. Ensure the plant is recovering from trip conditions. It takes at least 30 minutes to achieve the target power level.
  • FREEZE the simulator.
  • Go to RUN at start of JPM.

D. REQUIRED CONDITIONS:

  • Reactor power less than 2x10-6%.
2. SPECIAL TOOLS/EQUIPMENT:

JS3 Shannon 149 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The Reactor tripped about 30 minutes ago. The plant is stable.
  • The CRS directs you to perform the Boron Dilution Alarm Check per Appendix 8 of 40EP-9EO10, Standard Appendices.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS3 Shannon 150 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1.
  • Place the Control/Startup Channel 1 Control/Startup Channel 1 switch to switch to the S-U CHAN 1 the S-U CHAN 1 position (At position. panel B04).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2.
  • Place the Control/Startup Channel 2 Control/Startup Channel 2 switch to switch to the S-U CHAN 2 the S-U CHAN 2 position (At position. panel B04).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Press the METER SELECT Goes to NIS cabinet in back panel

3.
  • pushbutton for Startup Channel 1 and area of Control Room, to Startup check BOTH of the following: Channel 1:
  • The green CONTROL light is
  • The green CONTROL extinguished. light is extinguished.
  • The red START UP light is lit.
  • The red START UP light is lit.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 151 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Press the HV PERMIT/HV ON Startup Channel 1 amber light is lit.

4.
  • pushbutton for Startup Channel 1 and check that the amber light is lit.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Record Startup Channel 1 count rate. Records Startup Channel 1 count rate

5.
  • in cps. (Value depends on time after shutdown, typically ~30 - 50cps)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6. IF Startup Channel 1 is the only Inform CUE: Both Startup No action necessary. Continues on in available channel, THEN perform a channels are available. procedure.

qualitative assessment of Channel 1 behavior.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

7.
  • Check that the START UP HV The START UP HV LOW alarm LOW alarm for Startup Channel 1 is for Startup Channel 1 WILL BE lit NOT lit. (This is normal). The operator must perform the contingency action and Contingency: Press the STARTUP press the pushbutton to extinguish HV LOW pushbutton for Startup the light to achieve NOT LIT status.

Channel 1.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 152 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

8. Check that the TROUBLE alarm The TROUBLE alarm for Startup for Startup Channel 1 is NOT lit. Channel 1 is NOT lit.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9. Check that the HIGH CPS alarm The HIGH CPS alarm for Startup for Startup Channel 1 is NOT lit. Channel 1 is NOT lit.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10.
  • Press the METER SELECT Startup Channel 2 :

pushbutton for Startup Channel 2 and check BOTH of the following

  • The green CONTROL light is extinguished.
  • The green CONTROL light is extinguished.
  • The red STARU UP light is lit
  • The red STARU UP light is lit SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

11.
  • Press the HV PERMIT/HV ON Startup Channel 2 amber light is lit.

pushbutton for Startup Channel 2 and check that the amber light is lit.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 153 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

12.
  • Record Startup Channel 2 count rate. Record Startup Channel 2 count rate.

(Count rate varies based on time after shutdown, typically 30 - 50cps)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. IF Startup Channel 2 is the only If Requested CUE: Both Startup No action necessary. Continues on in available channel, THEN perform a channels are available. procedure.

qualitative assessment Channel 2 behavior.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

14.
  • Check that the START UP HV The START UP HV LOW alarm LOW alarm for Startup Channel 2 is for Startup Channel 2 WILL BE lit NOT lit. (This is normal). The operator must perform the contingency action and Contingency: Press the STARTUP press the pushbutton to extinguish HV LOW pushbutton for Startup the light to achieve NOT LIT status.

Channel 1.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

15. Check that the TROUBLE alarm The TROUBLE alarm for Startup for Startup Channel 2 is NOT lit. Channel 2 is NOT lit.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 154 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

16. Check that the HIGH CPS alarm The HIGH CPS alarm for Startup for Startup Channel 2 is NOT lit. Channel 2 is NOT lit.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

17.
  • Perform steps (17 through 21) for the Note: The operator goes to the Boron Dilution Alarm Channel SEN- BDAS Panel in the Control Room IN-005. Press the RESET back panel area.

pushbutton.

Push RESET pushbutton for channel SEN-IN-005.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

18. Ensure the FLUX/SET POINT The FLUX/SET POINT pushbutton is selected to the pushbutton is selected to the FLUX position. FLUX position (backlights on FLUX).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

19. Check that the digital display is NOT The digital display is NOT flashing.

flashing. YES/NO (YES meets the Selects YES.

acceptance criteria).

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 155 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

20. Check that the decimal indicator is The decimal indicator is flashing at flashing at approximately on flash approximately on flash per second.

per second. YES/NO (YES meets the Selects YES.

acceptance criteria).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

21.
  • Record flux reading. Records flux reading in Vdc.

Note: Typical to find readings in the 3.4 Vdc area)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

22. IF Boron Dilution Alarm Channel Inform CUE: Both Boron Dilution No action necessary. Continues in SEN-NI-005 is the only available Alarm Channels are available. procedure.

channel, THEN Perform a qualitative assessment of Boron Dilution Alarm Channel SEN-NI-005 behavior.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 156 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

23.
  • Perform steps (23 through 28) for the Note: The operator goes to the Boron Dilution Alarm Channel SEN- BDAS Panel in the Control Room NI-006: Press the RESET back panel area.

pushbutton.

For Boron Dilution Alarm Channel SEN-NI-006: RESET pushbutton pressed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

24. Ensure the FLUX/SET POINT The FLUX/SET POINT pushbutton is selected to the pushbutton is selected to the FLUX position. FLUX position (backlights in FLUX).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

25. Check that the digital display is NOT The digital display is NOT flashing.

flashing. YES/NO (YES meets the Selects YES.

acceptance criteria).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

26. Check that the decimal indicator is The decimal indicator is flashing at flashing at approximately one flash approximately one flash per second.

per second. YES/NO (YES meets the Selects YES.

acceptance criteria).

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 157 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

27.
  • Record flux reading. Records flux reading in Vdc.

Note: Typical to find readings in the 3.4 Vdc area)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

28. IF Boron Dilution Alarm Channel If Requested CUE: Both Boron No action necessary. Continues in SEN-NI-006 is the only available Dilution Alarm Channels are procedure.

channel, THEN perform a qualitative available.

assessment of Boron Dilution Alarm Channel SEN-NI-006 behavior.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

29.
  • Calculate the voltage for Startup Performs calculation for the voltage Channel 1. for Startup Channel 1 per the procedure.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

30.
  • Calculate the voltage for Startup Performs calculation for the voltage Channel 2. for Startup Channel 2 per the procedure.

SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 158 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

31.
  • Calculate the voltage difference Calculates the voltage difference between the Startup Channels. between the Startup Channels per the procedure. (0.8 Vdc or less meets the acceptance criteria). If done correctly, this criteria should be met.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

32.
  • Calculate the voltage difference Calculates the voltage difference between the Boron Dilution Alarm between the Boron Dilution Alarm Channels. Channels per the procedure. (0.8 Vdc or less meets the acceptance criteria).

If done correctly this criteria should be met.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

33.
  • Check that ALL of the acceptance ALL of the acceptance criteria have criteria have been met. been met. Selects/circles YES.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

34. Select the desired audio range and Selects an audio range and volume volume for the Startup Channels. for the Startup Channels SAT / UNSAT Comments (required for UNSAT):

JS1 Shannon 159 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

35. Check that proper overlap exists Checks for proper overlap between between the LOG Power Channel the LOG Power Channel and the and the Startup Channel. Startup Channel.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

42. IF ALL of the acceptance criteria are If requested CUE: understand the Informs the CRS that the Boron met, THEN inform the CRS that the Boron Dilution Alarms are Dilution Alarms are operable.

Boron Dilution Alarms are operable. operable.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

43. Ensure the required signatures are Inform CUE: The CRS will obtain JPM termination..

obtained. the required signatures.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS1 Shannon 160 Rev 0 6/6/05

JS3 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/6/05 New REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

67. Vendor reference document upgrade
68. Plant modification (include number)
69. Procedure upgrade
70. Internal or External Agency Commitment (indicate item number)
71. Technical Specification Change (indicate amendment number)
72. Other (explain in comments)

JS3 Shannon 161 Rev 0 6/6/05

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The Reactor tripped about 30 minutes ago. The plant is stable.
  • The CRS directs you to perform the Boron Dilution Alarm Check per Appendix 8 of 40EP-9EO10, Standard Appendices.

CANDIDATE JS4 Capehart 162 Rev 0 6/6/05

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0090030401 Operate RCS Gas Vent System (RCGVS)

TASK STANDARD: Vent Reactor Vessel to Containment for void elimination.

K/A: 3.2 002 K4.05 K/A RATING: RO: 3.8 SRO: 4.2 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 5 min

REFERENCES:

40EP-9EO10, Standard Appendix 15, RCS Void Control, Rev 8 SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: J. Dedon TECH REVIEW:

REVISION DATE: 10/9/03 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS4 Capehart 163 Rev 0 6/6/05

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC# Create special IC conditions with voiding in the reactor vessel head.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

1. IOR ZDRCBHS105 CLOSED Use RCS drawing RC3 to activate. Fails RCS Vent valve 105 Do not use expert command. Closed.

2.

3.

4.

C. SPECIAL INSTRUCTIONS:

  • Have someone from the simulator group reset the simulator to the created IC.
  • Go to RUN on Simulator
  • Acknowledge alarms, then FREEZE simulator.
  • Provide INITIATING CUE, and then go to RUN on simulator.

D. REQUIRED CONDITIONS:

  • At least one set of RVLMS detectors uncovered in the Reactor Vessel Head.
2. SPECIAL TOOLS/EQUIPMENT:
  • NONE 164

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

The Reactor was tripped a short time ago. An event is in progress. A void exists in the Reactor Vessel Head. The CRS directs you to remove the void from the Reactor Vessel Head by using Standard Appendix 15, RCS Void Control, Contingency Actions, at step 3.1 (Step 3 Instructions were not successful).

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

SAFETY CONSIDERATIONS:

  • NONE 165

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain 40EP-9EO10, Standard 40EP-9EO10, Standard Appendix 15 Appendix 15. obtained.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Perform the following to vent the If requested, CUE: Valve RCB- Examinee attempts to open RCB-2.

RCS to the RDT: HV-105 will not open. HV-105, but determines the valve

  • OPEN RCB-HV-105. will not open, and the RDT vent path
  • OPEN RCA-HV-101. is not available (an alternate path If examinee asks for guidance, must be taken).

CLOSE valves when RDT level Inform QUE: Continue with rises. actions in step 3.2 to vent to Containment.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Examinee opens RCA-HS-106.

3.
  • Open RCA-HV-106, If Requested Cue: RCA-HS-106 Pressurizer/Reactor Vessel Head green light off and red light on.

Vent to the Containment Valve.

SAT / UNSAT Comments (required for UNSAT):

166

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Vent Reactor Vessel Head to If Requested Cue: RCB-HS-102 Examinee opens RCB-HS-102.

4.
  • Containment by opening RCB-HV- green light off and red light on.

102, Reactor Vessel Head Vent Note: After about three minutes the Valve. RVLMS shows the vessel head full (all probes covered).

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD When RCS pressure drops close both Examinee may attempt additional Examinee observes RCS pressure

5.
  • the vent valves. venting operations for void and void indications, closes RCA-
  • RCA-HV-106. control. Inform QUE: Another HS-106 and RCB-HV102 when RCS operator will continue to monitor pressure drops.
  • RCB-HV-102. for voids and take action.

If Requested Cue: RCA-HS-106 green light on and red light off.

If Requested Cue: RCB-HS-102 green light on and red light off.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT 167

JS4 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/6/05 New REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

73. Vendor reference document upgrade
74. Plant modification (include number)
75. Procedure upgrade
76. Internal or External Agency Commitment (indicate item number)
77. Technical Specification Change (indicate amendment number)
78. Other (explain in comments) 168

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The Reactor was tripped a short time ago. An event is in progress. A void exists in the Reactor Vessel Head.
  • The CRS directs you to remove the void from the Reactor Vessel Head by using Standard Appendix 15, RCS Void Control, Contingency Actions, at step 3.1 (Step 3 Instructions were not successful).

CANDIDATE JS5 Capehart 169 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0150030801, Perform a Boration of the RCS TASK STANDARD: Boration of 75 gallons performed.

K/A: 3.1.004A4.01 K/A RATING: RO: 3.8 SRO: 3.9 APPLICABLE POSITION(S): RO VALIDATION TIME: 20 minutes

REFERENCES:

40OP-9CH01, CVCS Normal Operations,(Rev 41) 41AL-1RK3A, Panel B03A Alarm Response (Rev 11)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 6/6/2005 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS5 Capehart 170 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: 20 or any at power IC with CVCS makeup in auto.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

45. IMF CP05:CHNP02B Fail the standby feature of the Boric acid pumps. Pump B is the designated standby in this IC.

Use IMF CP05:CHNP02A if pump A is the standby.

46. None STEP COMMAND DESCRIPTION
10. (When boration is started by Trip the running BAMP pump on overload and remove the Fail alarm window 3A4B) to auto start feature of the B pump.

IMF B401:CHNP02 DMF CP05:CHNP02B NOTE: The pump start is off an alternator circuit so stop whichever pump starts.

C. SPECIAL INSTRUCTIONS:

  • Use simulator system diagrams to determine BAMP Pump status.
  • Ensure controller CHN-FIC-210Y is not set for 25 gpm. This requires the candidate to make an adjustment to the controller for 25 gpm during the JPM.
  • Ensure CEDMCS is in Auto Sequential.

D. REQUIRED CONDITIONS:

  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • None JS5 Capehart 171 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The quantity to be added has been determined to be 75 gallons from the RWT at a rate of 25 gpm.
  • Use CHN-FIC-210Y in automatic to the Charging Pump suction.
  • All Prerequisites are complete.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS5 Capehart 172 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain procedure 40OP-9CH01. 40OP-9CH01 obtained and refers to section 6.

NOTE: Examinee may also refer to Appendix M of 40OP-9CH01.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. IF the reactor is critical, THEN Examinee determines the boration determine the gallons of boric acid to needed is 75 gallons from the be added using any of the following: Initiating Cue.
  • STA reactivity worksheet
  • Reactor Engineering game plan
  • Boron Operator Assistance Program (OAP)
  • Core Data Book SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 173 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

3. When diverting CVCS Letdown then Examinee determines that 75 gpm perform one of the following: will not cause an auto diversion.
1. If any of the following conditions exist:
  • RCS activity levels indicate the possibility of failed fuel to the extent that Letdown needs to be degassed.
  • The Shift Manager/CRS directs Gas Stripper Operation.
  • Chemistry directs Gas Stripper Operation.

Then divert CVCS Letdown to either of the following

  • Gas Stripper
  • EDT
2. Bypass Gas Stripper.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

4. If makeup is in manual as directed in Examinee determines that makeup is step 4.3.3.4, and it is desired to not in manual.

perform this makeup in Automatic, Then perform both of the following:

  • Place CHN-HS-210 in Automatic.
  • Place CHN-HS-527 in Open/Auto
  • Place CHN-FIC-210Y in Automatic using Appendix M -

Operation of the Digital Makeup Controllers and Totalizers, Section 1.0.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 174 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

5.
  • Set Boric Acid Makeup flow Examinee adjusts the Boric Acid controller CHN-FIC-210Y (Foxboro) Makeup flow controller CHN-FIC-to 25 gpm. 210Y set point to 25 gpm.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6.
  • Select the Target makeup volume Examinee sets selection arrow at ten (gallons) on the boric acid makeup digit and sets at 7, examinee sets flow totalizer/counter CHN-FQIS- selection arrow at single digit and 210Y (Micro-Motion). selects 5. Examinee may use Appendix M as a reference.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

7. IF the reactor is critical, THEN If the examinee asks the CRS what The examinee ensures CEDMCS is ensure CEDMCS is in the desired mode of operation for CEDMCS: in auto sequential.

mode of operation per CRS direction. The CRS desires CEDMCS in auto sequential.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 175 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

8. If borating directly to the VCT, then From the CUE the examinee open CHN-UV-512, Makeup Inlet to determines that boration is going to VCT. the charging pump suction.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9.
  • Start the boration by: Examinee starts the boration.
  • Placing CHN-HS-210 in the NOTE: If the controller is not at the BORATE position.

reset position, the examinee may

  • Depress the Totalizer have to push the button to get the RESET button. controller to the reset position.
  • Depress the Totalizer START button.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10.
  • Check for BOTH of the following: Examinee verifies that the running boric acid pump has tripped and
  • One boric acid pump started announces the receipt of BAM
  • CHN-FIC-210X indicates TRBL Boric Acid Makeup Pump no RMW flow, (CHN-FV- Overload alarm.

210X closed)

NOTE: Driver action is required to trip the running boric acid pump. The STBY Pump fails to auto start (In setup).

The standby pump normally will auto start after a 15 sec time delay.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 176 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Candidate responds to BAM TRBL

11.
  • Examinee responds IAW 40AL-alarm with alarm response 40AL-9RK3A, window 3A06A, Group G, 9RK3A, window 3A06A, Group G.

and manually starts the other boric acid makeup pump.

Start CHN-P02A or CHN-P02B, the After starting the other boric acid other boric acid makeup pump, from makeup pump, INFORM: Another B03 if it fails to start automatically.

operator will investigate the loss of the running boric acid pump.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

12. Transition back to procedure 40OP- Examinee verifies that there is now a 9CH01. Check for BOTH of the running boric acid pump and CHN-following: FIC-210X indicates no RMW flow (CHN-FV-210X is closed).
  • CHN-FIC-210X indicates no RMW flow, (CHN-FV-210X closed)

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. If borating directly to the suction of Examinee ensures CHN-UV-527 the charging pumps, then ensure indicates open.

CHN-UV-527, Makeup to CHRG PMPS (VCT Bypass) is open.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 177 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

14. On CHN-FIC-210Y (Foxboro) check Examinee verifies process flow that Process Flow increases increasing toward auto setpoint.

(middle bar graph) towards the Auto setpoint, overshoots the Auto setpoint and then stabilizes at the Auto setpoint.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

15. Check proper flow indicated on Examinee verifies proper flow CHN-FIC-210Y. indicated on CHN-FIC-210Y.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

16. IF the reactor is critical, THEN Examinee monitors the effects of the monitor the effects of boration on boration.

CEA motion, RCS temperature and Reactor Power.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 178 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

17.
  • When the desired volume has been Examinee ensures borate flow has added to the RCS, then perform the stopped, places CHN-HS-210 in following: AUTO, and sets the setpoint at the desired setpoint.
  • Ensure the borate flow has stopped.
  • Ensure CHN-HS-210 is in When requested CUE: The CRS Auto. desires the auto setpoint to be
  • Ensure the Auto Setpoint placed at 17 gpm.

is at the desired setpoint for auto makeup.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

18. Isolate Makeup by ensuring CHN- Examinee ensures CHN-UV-527 UV-527 auto closes. closes.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

19. Ensure boric acid pump stops. Examinee ensures BAMP Pump stops.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 179 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

20. If additional boron will be added to The CRS has determined that Examinee asks CRS if additional the RCS, then repeat step 6.3.1 additional borations will NOT borations will be performed.

through step 6.3.15 as directed by the occur. Another operator will CRS. perform a flush of the lines.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

21. Evaluate the need to notify chemistry Examinee determines the reactor is to sample the RCS to check that the critical and NAs this step.

calculated change occurred.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

22. Boronometer alarms may be set. The CRS does not wish to reset the Examinee addresses adjusting boronometer alarms. boronometer alarms.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

23.
  • Line up the makeup system for If requested: The CRS wants the The examinee returns the system to automatic or manual operation per makeup system lined up for automatic.

SM/CRS direction. automatic operation.

SAT / UNSAT Comments (required for UNSAT):

JS5 Capehart 180 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

24. If the change in boron is greater than Examinee recognizes that born 50 ppm, then initiate pressurizer change is less than 50 ppm and boron spray flow for boron equalization. equalization is not needed.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS5 Capehart 181 Rev 0 6/6/05

JS-5 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/6/05 New REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

79. Vendor reference document upgrade
80. Plant modification (include number)
81. Procedure upgrade
82. Internal or External Agency Commitment (indicate item number)
83. Technical Specification Change (indicate amendment number)
84. Other (explain in comments)

JS5 Capehart 182 Rev 0 6/6/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The quantity to be added has been determined to be 75 gallons from the RWT at a rate of 25 gpm.
  • Use CHN-FIC-210Y in automatic to the Charging Pump suction.
  • All Prerequisites are complete.

CANDIDATE JS6 Shannon 183 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 1140010401, lineup the steam bypass control system for normal operation The not in operate lights are extinguished; SBCS abnormal alarm and SBCS TASK STANDARD: condenser interlock alarms are reset.

K/A: 3.4-041-A4.08 K/A RATING: RO: 3.0 SRO: 3.1 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 10 minutes

REFERENCES:

40OP-9SF05, Operation of Steam Bypass Control System (Rev 18)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: John M. Dedon TECH REVIEW:

REVISION DATE: 11/18/03 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS6 Shannon 184 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: 20 preferred (Any IC >75% power)

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION 47.

48.

49.

50.

C. SPECIAL INSTRUCTIONS:

  • Place Simulator in RUN.
  • On the SBCS test panel:

o Press the Emergency Off pushbutton.

o Place the "System Mode Selection" switch to the "TEST" position.

o Place the SBCS Master Controller in MANUAL NOTE: The following RED LEDs will be lit: "Emergency OFF", both "Condenser Interlock" lights, both "Not in Operate" lights, and AMI.

  • Silence/Acknowledge Alarms.
  • FREEZE the Simulator.
  • Bring Examinee in and provide CUE.
  • Place Simulator in RUN.
  • None D. REQUIRED CONDITIONS:
  • None
2. SPECIAL TOOLS/EQUIPMENT:
  • None JS6 Shannon 185 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

The Steam Bypass Control System has been disconnected at the SBCS Test Panel. The CRS directs you to perform 40OP-9SF05, Operation of Steam Bypass Control System, Appendix C to:

  • Reconnect and

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS6 Shannon 186 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain procedure 40OP-9SF05. 40OP-9SF05 obtained. Examinee goes to Appendix C SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Checks at least 1 Not In Operate Verifies both RED lights are lit.

light are lit on the SBCS test panel.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3.
  • Depress and release the "EMERGENCY OFF" pushbutton

`"EMERGENCY OFF" pushbutton depressed (no change in status of on the SBCS test panel. SBCS Test Panel).

SAT / UNSAT Comments (required for UNSAT):

JS6 Shannon 187 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

4. Ensure BOTH of the following: The examinee ensures the EMERG OFF backlight is illuminated.
  • Check the EMERG OFF backlight is illuminated.
  • Check that the power supply Inform CUE: The power supply NOTE: The power supply lights are lights (-15,+15) in SFN-C03Y, lights in SFN-CO3Y, nest 4, 5, 7 not modeled in the simulator so it is nests 4, 5 and 7 are not are not lit. necessary to give the cue.

illuminated.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

5.
  • Places the `System Mode Selection' System Mode Select switch in switch in "DISCONNECT". "DISCONNECT".

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6.
  • Depresses and release the `Light and LIGHT AND TIMER TEST Timer' test button on the SBCS test pushbutton depressed and released.

panel SAT / UNSAT Comments (required for UNSAT):

JS6 Shannon 188 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD The NOT IN OPERATE lights 1 and

7. Check that the Not In Operate 1 2 will extinguish then come back and 2 lights extinguish and then ON in 30 seconds.

come back on in approximately 30 seconds. .

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

8.
  • Place the `System Mode Selection' System Mode Selection Switch in switch in the `Operate' position on "OPERATE".

the SBCS Test Panel NOTE: The AMI light extinguishes.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9. Ensures that the Not In Operate 1 The NOT IN OPERATE lights will and 2 lights extinguish in extinguish in 30 seconds.

approximately 30 seconds.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10. Ensures that the SBCS Master SBCS Master Controller in Controller is in the `Manual' mode. "MANUAL" mode with backlight illuminated.

SAT / UNSAT Comments (required for UNSAT):

JS6 Shannon 189 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

11. Ensures that the output of the SBCS Ensures zero output on SBCS Master Controller is zero. controller SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

12.
  • Takes SGN-HS-1010 to Reset the Switch SGN-HS-1010 to "RESET" SBCS Emergency Off (spring return to neutral).

NOTE: Annunciators "SBCS ABNORMAL" and "SBCS COND INTLK" clear.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. Ensure the `SBCS Abnormal' alarm Verify "SBCS ABNORMAL" alarm is (Window 6A16A) is clear. clear.

SAT / UNSAT Comments (required for UNSAT):

JS6 Shannon 190 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

14. Ensure the `SBCS COND INTLK' Inform CUE: No adjustment of the Verify "SBCS COND INTLK" alarm alarm (Window 6A16B) is clear. SBCS master controller is desired. clear.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS6 Shannon 191 Rev 1 6/3/05

SF006-CR-000 JS6 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/3/05 NRC REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

85. Vendor reference document upgrade
86. Plant modification (include number)
87. Procedure upgrade
88. Internal or External Agency Commitment (indicate item number)
89. Technical Specification Change (indicate amendment number)
90. Other (explain in comments)

JS6 Shannon 192 Rev 1 6/3/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

The Steam Bypass Control System has been disconnected at the SBCS Test Panel. The CRS directs you to perform 40OP-9SF05, Operation of Steam Bypass Control System, Appendix C to:

  • reconnect and

CANDIDATE JS7 Capehart 193 Rev 0, 6/6/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0150030801, Respond to Containment Sump Trouble Excessive Runtime Alarm 40AL-9RK7B TASK STANDARD: Restore Containment Sump level to normal by using Standby pump.

K/A: 3.5.103A4.01 K/A RATING: RO: 3.2 SRO: 3.3 APPLICABLE POSITION(S): RO VALIDATION TIME: 5 minutes

REFERENCES:

40AL-9RK7B, Panel B07B Alarm Response, CNTMT SUMPS EXCESS LEAKAGE, (Rev 1)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: Phil Capehart TECH REVIEW:

REVISION DATE: 6/6/2005 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS7 Capehart 194 Rev 0, 6/6/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: NA.

B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

51. IMF CP05:RDNP02 Containment Radwaste East Sump Pump Fails to AUTO START
52. IMF TH07 66 Insert small LOCA at 66% until sump pumps receive a high level AUTO START signal and has ran long enough to receive the excess run time alarm, then cutback on leak size to 15%.

C. SPECIAL INSTRUCTIONS:

  • Close RDB-HS-24 to allow the sumps to fill up to the AUTO START signal and allow the West Sump Pump to run long enough to pick up the excess run time alarm.
  • Once these conditions have been established snap to a vacant IC if possible to maintain the required starting conditions.

D. REQUIRED CONDITIONS:

  • West Sump pump running with Excess Run Time alarm in. East Sump pump NOT running with valve RDB-HS-24 closed.
2. SPECIAL TOOLS/EQUIPMENT:
  • None JS7 Capehart 195 Rev 0, 6/6/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The plant is responding to a small LOCA.
  • The CRS directs you to respond to the board 7 alarm window 7B03A and take appropriate action.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors. Security requirements must be observed.
  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS7 Capehart 196 Rev 0, 6/6/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain procedure 40AL-9RK7B. Candidate identifies Pt. ID RDYS2 in alarm window and obtains 40AL-9RK7B and refers to CNTMT SUMPS TRBL and proceeds to GROUP C for Excess Runtime.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Check levels on B07. Reactor cavity

2. Examinee determines that a high sump level indicator RDN-LI-10; level exists in both radwaste sumps and containment radwaste sump level and that only the West Sump pump is indicator RDN-LI-410 (left\right).

running.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD Check RDA-HS-23 and RDB-HS-24

3.
  • Procedure says to check the valves Examinee checks RDA-HS-23 and in open position, to insure flow open. If candidate requests CUE: RDB-HS-24 are in the open position.

through containment from Ensure the valves are open.

containment radwaste sumps.

The Examinee determines that RDA-HS-24 is closed and opens the valve.

SAT / UNSAT Comments (required for UNSAT):

JS7 Capehart 197 Rev 0, 6/6/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD Start related standby sump pump

4.
  • Examinee starts on hand switch with RDN-HS-11 or RDN-HS-12 for RDN-HS-22 for the containment reactor cavity sump and for radwaste sump east pump and containment radwaste sump west and verifies level is decreasing.

east RDN-HS-21 or RDN-22, then stop first pump. Verify level decrease, on LI-10 or LI-410 (left\right), and pump auto stops.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD If pump does not decrease level start

5. Examinee ensures both pumps are both pumps.

running.

Note: It is likely that the candidate At the end of this step, Inform will start the additional pump since CUE: another operator will the level change cannot be seen at continue to observe sump levels first due to the high sump level and and pump operation. leak rate.

SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS7 Capehart 198 Rev 0, 6/6/05

JS-7 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS 0 6/6/05 New REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

91. Vendor reference document upgrade
92. Plant modification (include number)
93. Procedure upgrade
94. Internal or External Agency Commitment (indicate item number)
95. Technical Specification Change (indicate amendment number)
96. Other (explain in comments)

JS7 Capehart 199 Rev 0, 6/6/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The plant is responding to a small LOCA.
  • The CRS directs you to respond to the board 7 alarm window 7B03A and take appropriate action.

CANDIDATE JS8 Shannon 200 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM BASIS INFORMATION TASK: 0500010401 Initiate a containment vent.

TASK STANDARD: Containment purge system in operation in the VENT mode.

K/A: 029 A2.03 K/A RATING: RO: 2.7 SRO: 3.1 K/A: K/A RATING: RO: SRO:

APPLICABLE POSITION(S): RO VALIDATION TIME: 10 min

REFERENCES:

40OP-9CP01, Containment Purge System (Rev 15)

SUGGESTED TESTING ENVIRONMENT: SIMULATOR X PLANT JPM TYPE YES NO Time Critical X Alternative Path X APPROVAL DEVELOPER: John M. Dedon TECH REVIEW:

REVISION DATE: 04/07/04 APPROVAL:

TESTING METHOD ACTUAL TESTING ENVIRONMENT: SIMULATOR PLANT TESTING METHOD: SIMULATE PERFORM EVALUATION EXAMINEE NAME:

(print)

EVALUATOR NAME:

(print)

Date GRADE (Check One) SAT UNSAT JS8 Shannon 201 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM

1. SIMULATOR SETUP:

A. IC#: 20 B. MALFUNCTIONS, OVERRIDES & REMOTE FUNCTIONS:

EVENT COMMAND DESCRIPTION

53. MRF CH04 OPEN Opens IA-BV45, air supply to CPB-UV-5B
54. MRF IP38 1.3 (or verify Sets containment pressure to 1.3 psig.

containment pressure is at 1.3 psig) 55.

56.

C. SPECIAL INSTRUCTIONS:

  • Go to run on simulator.

D. REQUIRED CONDITIONS:

  • Containment pressure is at 1.3 psig.
2. SPECIAL TOOLS/EQUIPMENT:
  • None JS8 202 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM TASK CONDITIONS INFORMATION PRESENTED TO EXAMINEE:

SPECIAL CONSIDERATIONS:

IN PLANT JPM's ONLY

  • Operation of in-plant equipment is to be SIMULATED ONLY, DO NOT OPERATE any equipment.
  • Inform the control room staff of any discovered deficiencies.
  • Comply with the REP, if it is not possible to enter an area it may be permissible to discuss the equipment to be operated. Do not enter contaminated, airborne, or high radiation areas.

ALL JPMs

  • You may use any source of information normally available.

INITIATING CUE:

  • The CRS has directed you to initiate a normal containment vent in accordance with 40OP-9CP01, Containment Purge System.
  • An area operator is standing by in the RCA to assist you.
  • RU-34 is available.
  • Venting of Containment is for pressure reduction
  • All prerequisites are complete.

INFORMATION FOR EVALUATOR'S USE:

  • Denotes Critical Step
  • At the discretion of the Examiner/Evaluator, this JPM may be terminated when the Task Standard is met or adequate time has been allowed to complete the JPM. It shall be terminated when the Examinee has verbalized completion of the JPM.
  • Any step marked UNSAT requires comments.
  • If this is the first JPM of the set then ensure the examinee has been briefed.
  • Step sequence is not critical unless noted or will prevent achieving the task standard.
  • Notify unit Shift Manager of in-plant JPM performance.
  • Performance of this JPM will require entry into areas with alarmed doors.

Security requirements must be observed.

  • Locked valves will be involved. No attempt will be made to actually operate any valves.

JS8 203 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM JPM START TIME:

STEP CUE STANDARD

1. Obtain procedure 40OP-9CP01, Examinee obtains procedure.

Containment Purge System SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

2. Verify closed IA-VB47, IA supply to Area Operator has verified IA- Examinee directs AO to verify IA-CP-UV4A. VB47 closed. VB47 is closed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

3.
  • Unlock and open IA-VB45, air Area Operator has unlocked and Examinee directs AO to unlock and supply to CPB-UV-5B and CP-PV- opened IA-VB45. open IA-VB45.

43.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

4. Open/check open CP-V024 ISOL to Area Operator has opened CP- Examinee directs AO to open/check RU-34. V024. open CP-V024.

SAT / UNSAT Comments (required for UNSAT):

JS8 204 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

5.
  • Close/check closed CP-V023 ISOL Area Operator has closed CP- Examinee directs AO to close/check to RU-34. V023. closed CP-V023 ISOL to RU-34.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

6. Direct the RMS/Effluents technician Effluent Tech reports Shiftly ST has been verified current to ensure the Shiftly ST are required Surveillance for RU-37 and RU-38 by SR3.3.8.1 is current on RU37 are current.

and/or RU-38 SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

7.
  • Start venting containment by placing Examinee places CPN-HS-1 in the Containment Purge Mode VENT position.

Selector Switch CPN-HS-1 on B07 to VENT. Ensure damper CPN-M06 Verifies CPN-M06 opens opens.

NOTE: Handswitch will have dual indication SAT / UNSAT Comments (required for UNSAT):

JS8 205 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

8.
  • Open the Containment Power Access Examinee opens CP-UV-4B.

Purge Upstream isolation valve CP-UV-4B by placing CPA-HS-4 to NOTE: Handswitch will have dual OPEN.

indication due to CP-UV-4A remaining closed.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

9.
  • Open the Containment Power Access Examinee opens CP-UV-5B.

Purge Downstream isolation valve CP-UV-5B by placing CPB-HS-5 to NOTE: Handswitch will have dual OPEN.

indication due to CP-UV5A remaining closed.

Containment is now venting thru the orifice around CPN-PV-43.

SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

10. Log time the 8 inch valves were The Release Permit will be filled Time/pressure logged on permit.

opened on the release permit and out by another operator.

initial containment pressure SAT / UNSAT Comments (required for UNSAT):

JS8 206 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM STEP CUE STANDARD

11. Notify RMS/Effluent Section and RMS has been notified. RMS/Effluent Section notified Radiation Protection of start time of release and the pressure SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

12. Notify RP/Security of the start time Security has been notified. RP/Security notified of the release SAT / UNSAT Comments (required for UNSAT):

STEP CUE STANDARD

13. When pressure decreases to less than Containment venting will not Note: pressure reduction takes hours.

0.5 psig then ensure CPN-PV-43 is continue beyond this shift When lineup is completed and open. Containment vent is in progress Another Operator will continue provide CUEs.

with pressure reduction SAT / UNSAT Comments (required for UNSAT):

JPM STOP TIME:

NORMAL TERMINATION POINT JS8 207 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM RECORD OF REVISIONS REVISION REVISION REASON NUMBER DATE REVISED COMMENTS REASON REVISED Enter the numbers corresponding to the reason revised in the Reason Revised column and brief description of changes in Comments Column. Comments are to be numbered consecutively in each revision.

97. Vendor reference document upgrade
98. Plant modification (include number)
99. Procedure upgrade 100. Internal or External Agency Commitment (indicate item number) 101. Technical Specification Change (indicate amendment number) 102. Other (explain in comments)

JS8 208 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM INITIAL CONDITIONS INITIATING CUE:

  • The CRS has directed you to initiate a normal containment vent in accordance with 40OP-9CP01, Containment Purge System.
  • An area operator is standing by in the RCA to assist you.
  • RU-34 is available.
  • Venting of Containment is for pressure reduction
  • All prerequisites are complete.

CANDIDATE JS8 209 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Facility: PVNGS Scenario No.: 1 Op-Test No: 2005 Examiners: Operators:

Initial Conditions: IC #16, 50% power, MOC.

Turnover: Unit 1 has been at ~50% power for the past 3 days. The Unit had previously operated at near 100% power for 8 months. Power was reduced to perform repairs on A MFP. The repairs have been completed and the Unit is now waiting on a chemistry hold to increase power back to 100%. AF A is tagged out for maintenance. LCO 3.7.5. Condition b has been entered. Expected to be returned in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. HPSI A tagged out for bearing replacement. LCO 3.5.3 condition b was entered 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. Expected to be returned in approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />. Train B is protected equipment. Normal Shiftly Surveillances are complete. EOOS action level is Orange.

Event Malf. No. Event Type* Event Description No.

1 ED15A C-SRO After turnover is complete, Battery Charger A trips requiring an evaluation of operability of DC circuits, Tech Spec 3.8.4. Battery cell voltages must be verified within 1 hr. and a battery charger returned to service within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The crew should place the AC charger in service on M41.

2 TCNP01A C-CO After the crew places Battery Charger AC in service, TCW pump A bearing seizes. This causes the A TCW Pump to trip on overcurrent. The Standby pump does not auto start.

The crew should implement 41AL-1RK7A & 40AO-9ZZ03, Loss of Cooling Water, Section 5.0 and manually start the Standby TCW Pump.

3 TR04:RCNTT1 I-RO/SRO After the crew addresses the loss of cooling water, the Reactor Regulating System Hot Leg 11X temperature transmitter 111X input fails low affecting the PZR Level Control Setpoint.

The crew should implement 40AO-9ZZ16, RRS Malfunctions, Section 3.0, and select the unaffected instrument for input.

4 AV02:CHEPV C-RO/SRO While the crew is implementing 40AO-9ZZ16, the in-service letdown back-pressure 201P control valve fails closed. The crew should implement 40AO-9ZZ05, Loss of Letdown, Section 3.0.

5 TH01A .03 C -RO/SRO After the crew places the alternate letdown back-pressure control valve in service, an RCS 5:00 leak in excess of Tech Spec limits occurs. The crew should implement 40AO-9ZZ02, CV06A Excessive RCS Leakrate, and evaluate T.S. 3.4.14. The normally running charging pump trips requiring the RO to start the standby Charging Pump.

6 RD03I C-RO/CO/SRO After the crew addresses the RCS leak, two CEAs drop partially into the core. A reactor RD03J M- All trip is automatically initiated. Two stuck CEAs require the RO to initiate boration. The RD02A main turbine will fail to trip requiring the CO to manually trip it. The crew should RD02C implement 40EP-9EO01, Standard Post Trip Actions.

TC18 (Critical Task to establish reactivity control)

JS8 210 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Facility: PVNGS Scenario No.: 1 (continued) Op-Test No: 2005 7 noMSIS I-CO/RO After boration is initiated and the crew has transitioned to 40EP-9EO03, Loss of Coolant MMF TH01A 1 M-All Accident. The leak degrades into a Large Break LOCA. MSIS fails to automatically actuate, requiring manual actuation. B HPSI fails to auto start on the SIAS condition and requires a manual start.

End Crew takes action to establish a cooldown.

point (Critical Task is to ensure adequate Safety Injection Actuation flow to meet Safety Function requirements within 30 minutes of entry into the LOCA procedure and after the Safety Injection Actuation setpoints are exceeded.)

(Critical Task is to stop the RCPs on loss of subcooling.)

JS8 211 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Supplemental Turnover Plant conditions:

Unit 1 has been at ~50% power for the past 3 days. The Unit had previously operated at 100% power for 8 months. Power was reduced to perform repairs on A MFP. The repairs have been completed and the Unit is now waiting on a chemistry hold to increase power back to 100%.

40OP-9ZZ05, Power Operations, Section 5.0 (Steady State Power Operation) is in progress.

Equipment out of service:

AFA-P01 is tagged out for maintenance. LCO 3.7.5. Condition b has been entered.

Expected to be returned in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SIA-P02 (HPSI A) is tagged out for bearing replacement. LCO 3.5.3 condition b was entered 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. Expected to be returned in approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />.

Train B is protected equipment.

EOOS action level is Orange.

Planned shift activities:

Normal, shiftly surveillances are complete.

No other activities are planned.

Note:

The crew will walk down the control boards and assume the shift and then perform a reactivity brief prior to the commencement of the evaluation.

JS8 212 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Facility: PVNGS Scenario No.: 2 Op-Test No: 2005 Examiners: Operators:

Initial Conditions: IC #20, 100% power, MOC.

Turnover: Unit 1 has been at 100% power for the last 8 months. AF A is tagged out for maintenance. LCO 3.7.5.

Condition b has been entered. Expected to be returned in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. HPSI A tagged out for bearing replacement.

LCO 3.5.3 condition b was entered 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. Expected to return in approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />. Normal Shiftly Surveillances are complete. Train B is protected equipment. EOOS action level is Orange.

Event Malf. No. Event Event Description No. Type*

1 I-SRO After the crew assumes the shift, the crew receives a High Log Power Trip on Channel 'A' along with the High Log Power Permissive alarm. The crew should recognize that the log power channel has not failed, but the permissive IO is no longer bypassed. The CRS should address Tech Specs. LCO 3.3.1 R condition 'c' applies due to the bypass removal being inoperable and bypass Z or trip the channel within 1 hr.

D S

B A

C 01 H

L O

G O

F F

2 BK05:NANS02G R-RO After the crew takes the LCO action, a loss of NAN-S02G will occur causing N-CO/SRO a loss of one tower of cooling tower fans. (Plant Event) The CRS should enter 40AO-9ZZ12, Degraded Electrical and 40AO-9ZZ07, Degraded Vacuum. The crew initiates a downpower to stabilize vacuum.

3 TR01:RCNPT100 I-RO After recovering from the loss of vacuum, a high failure of pressurizer X 2500 pressure instrument RCN-PT-100X occurs. This will require the crew to address the alarm response procedure and select Channel Y on RCN-HS-100, PZR Pressure Control Selector, to ensure closer of the PZR spray valve.

4 IMF CC01A C-CO/SRO After completing the actions for the PZR instrument failure, NCW Pump A IOR ZDNHS for 1B will trip due to a ground fault. The Standby NCW pump will not start CP05:NCNP01B automatically or manually. This will require the operators to crosstie EW to NC IAW 40AO-9ZZ03, Loss of Cooling Water, Section 4.0. The CRS should address Tech Spec 3.7.7. (Cascading T.S.)

C-RO/SRO The RO should respond to the loss of letdown and refer to 40AO-9ZZ05.

The CRS should take action to keep PZR level below the Tech. Spec. limit of JS8 213 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM 56%.

JS8 214 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Facility: PVNGS Scenario No.: 2 (continued) Op-Test No: 2005 5 IMF FW15B 10 M-All After the CRS has addressed Tech Specs, FWPT B alarms are received and C-RO/CO the operator locally confirms high vibrations on the pump. The CO takes ATWS action to trip the B MFW pump. Reactor Power Cutback automatically initiates but two of the CEA's fail to insert. The reactor fails to trip automatically or by manual pushbuttons. The crew will open L-03 & L-10 breakers to initiate the Rx Trip. All rods go in on the Reactor Trip. The crew should implement SPTAs.

(Critical Task to trip the Reactor)

The CRS should transition to the Rx Trip EOP.

6 IMF ED02 C-CO During implementation of Rx Trip, a loss of offsite power occurs. The CRS M-All should transition to the LOOP/LOFC EOP. Once the crew enters the IMF LOOP/LOFC procedure a loss of PBB-S04 will occur because the B Spray CP06:SPBP01 Pond trips requiring the operator to secure the B DG. The CO will need to swap the S/G feed source from AF B to AFN-P01.

MRF EG21 Stop 7 IMF CP06:AFNP01 After the CO transitions to the N AF Pump, AFN-P01 will trip on an 86 Lockout. This will result in a loss of all feedwater.

8 C- The CRS should transition to the FRP procedure and restore power to SRO/RO/CO PBB-S04 using the A DG. The crew can then feed the SG's with AF M-All B.

(PRA Significant)

(Critical Task to ensure the required 4KV bus is energized to meet Safety Function requirements prior to the completion of the Maintenance of Vital Auxiliaries success path)

(Critical Task to establish feedwater to the unaffected SG)

End Crew stabilizes plant with AF B feeding at least one SG.

point JS8 215 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Turnover Plant conditions:

Unit 1 has been at 100% power for the past 8 months. MOC, 250 EFPD.

Equipment out of service:

AF A is tagged out for maintenance. LCO 3.7.5. Condition b has been entered. Expected to be returned in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

HPSI A tagged out for bearing replacement. LCO 3.5.3 condition b was entered 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. Expected to be returned in approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />.

Train B is protected equipment.

EOOS action level is Orange.

Planned shift activities:

Normal, shiftly surveillances are complete.

No other activities are planned.

Note:

The crew will walk down the control boards and assume the shift and then perform a reactivity brief prior to the commencement of the evaluation.

JS8 216 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Facility: PVNGS Scenario No.: 3 Op-Test No: 2005 Examiners: Operators:

Initial Conditions: IC #20, 100% power, MOC.

Turnover: Unit 1 has been at 100% power for the last 8 months. AF A is tagged out for maintenance. LCO 3.7.5.

Condition b has been entered. Expected to be returned in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. HPSI A tagged out for bearing replacement.

LCO 3.5.3 condition b was entered 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. Expected to return in approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />. Normal Shiftly Surveillances are complete. Train B is protected equipment. EOOS action level is Orange.

Event Malf. No. Event Event Description No. Type*

1 I-SRO After the crew assumes the shift, the crew receives a high failure of C Channel Narrow Range Pressurizer Pressure Instrument. The crew should recognize the failure and respond with 41AL-1RK5A and T.S. 3.3.1.A. The RC crew takes action to bypass the affected parameters.

CPT 101 C

2 TH06A C-SRO After the crew takes the LCO action, a 16 gpd tube leak will start on #1 S/G.

The crew should respond with 40AO-9ZZ02, Excessive RCS Leakrate, and notify chemistry. This Leakrate requires continued monitoring.

3 ED12B C- After the crew completes the applicable portions of 40AO-9ZZ02, PNB-D26 RO/CO/SRO will be lost. The CRS should implement 40AO-9ZZ13, Loss of Class Instrument or Control Power, and select the appropriate control instrument for PZR level control, stop one charging pump, and goes to 40AO-9ZZ05, Loss of Letdown. CO starts 40ST-9EC03 within one hour and set CEAC INOP flag in all operable CPCs. CRS refers to T.S. 3.8.9 and 3.4.9.

4 NI02C 0 I- After carrying out the actions for the loss of PNB-D26, Control Channel #2 RO/CO/SRO will fail low. The crew should address the alarm response for the AMI NI02D 0 received and respond IAW 40AO-9ZZ16, RRS Malfunction. The RO should take CEDMCS out of Auto Sequential and the CO should select the unaffected channel on RRS panel and place CEDMCS back to Auto Sequential. The CO will then take Control Channel #2 FWCS input to maintenance and remove the ATUN lockout.

5 TH06A N- After completing the actions for the loss of Control Channel #2, the S/G tube RO/CO/CRS leak will degrade to 200 gpd. This will require the CRS to commence a plant Shutdown IAW 40OP-9ZZ05. T.S. 3.4.14.

6 TR01:RCNTT111Y I- CO During the shutdown the leak rate will degrade requiring a Unit Trip. The 650 M-All crew should enter the SPTAs, 40EP-9EO01. Upon entering the SPTAs, the Tave input to the FWCS will fail high causing the ruptured SG to be overfed.

The CO will need to take action to minimize feed to the SG.

7 RP07B C-RO/SRO Train B BOP ESFAS Sequencer failure will occur on the trip. The RO should respond by manually starting B Train Safety Injection and Support Equipment.

JS8 217 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM (Critical Task is to start B HPSI pump.)

M-All After completing the SPTAs, the CRS should transition to the SGTR EOP, 40EP-9EO04 and proceeds to cooldown and isolate the ruptured S/G.

(Critical Task is to ensure the crew prevents a release of steam to atmosphere from the ruptured S/G during the RCS cooldown.)

(Critical Task is to ensure the crew isolates the most affected S/G within 30 minutes of entry into the SGTR procedure.)

End Crew isolates the affected SG.

point (Critical Task is to ensure the crew takes action to prevent the Main Steam Safety Valves on the most affected S/G from opening after the most affected S/G has been isolated.)

JS8 218 Rev 1 6/3/05

CP001-CR-000 JS8 PVNGS JOB PERFORMANCE MEASURE 2005 NRC EXAM Turnover Plant conditions:

Unit 1 has been at 100% power for the past 8 months. MOC, 250 EFPD.

Equipment out of service:

AF A is tagged out for maintenance. LCO 3.7.5. Condition b has been entered. Expected to be returned in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

HPSI A tagged out for bearing replacement. LCO 3.5.3 condition b was entered 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago. Expected to be returned in approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />.

Train B is protected equipment.

EOOS action level is Orange.

Planned shift activities:

Normal, shiftly surveillances are complete.

No other activities are planned.

Note:

The crew will walk down the control boards and assume the shift and then perform a reactivity brief prior to the commencement of the evaluation.

JS8 219 Rev 1 6/3/05