Constellation Energy, P.O. Box 63

  • Nine Mile Point Nuclear Station Lycoming, NY 13093 May 1, 2006 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

Nine Mile Point Nuclear Station Unit No. 2; Docket No. 50-4 10 Cycle 11 Core Operating Limits Report. Revision 0 Attached is a copy of the Cycle 11 Core Operating Limits Report (COLR), Revision 0, for Nine Mile Point Unit 2 (NMP2). This report is being submitted pursuant to NMP2 Technical Specification 5.6.5.d.

Should you have questions regarding the information in this submittal, please contact M. H. Miller, Licensing Director, at (315) 349-1510.

Very truly yours, Mark A. Schimmel Manager Engineering Services MAS/RF/sac

Attachment:

(1) Nine Mile Point Unit 2 Core Operating Limits Report cc: S. J. Collins, NRC T. G. Colburn, NRC Resident Inspector, NRC j4ocL4

Document Control Desk May 1, 2006 Page 2 bcc: L. S. Larragoite C. W. Fleming, Esquire T. J. O'Connor J. A. Hutton M. H. Miller/T. F. Syrell J. L. Lyon M. Armenta NMP2L 2130 COMMITMENTS IDENTIFIED IN THIS CORRESPONDENCE:

  • NONE Responsible Person/Organization:

Due Date:

SAR1TSB Revision Required? If yes, Type:

Initiation Date:

NCTS No.:

Posting Requirements for Responses -- NOV/Order No

ATTACHMENT (1)

Nine Mile Point Unit 2 Core Operating Limits Report Nine Mile Point Nuclear Station, LLC May 1, 2006

NINE MILE POINT UNIT 2 CORE OPERA TING LIMITS REPORT Document No.: COLR2-11 Revision 0, Cycle 11 Name Title Date Prepared by: 3,A2j3

. I/

C. W.~Lepine Fuel Engineer Reviewed by: 3 /a S Ad;

. L. Winklebleck Fuel Engineer Independently Reviewed by: .. tAIn 3 /-1 f/Z R. C Fuel Engineer Approved by:

M. A. Armenta Principal Engineer, Nuclear Fuels Services Approved by:

J. N. Darweesh Supervisor, Reactor Engineering Approved by: /7o6 P. I. Wengloski Director, Nuclear Fuels Services This Controlled Document provides cycle specific core operating limits for use in conjunction with the Nine Mile Point Unit 2 Technical Specifications. Document pages may only be changed through a reissue of the entire document.

Revision 0 Cycle II NINE MILE POINT UNIT 2 CORE OPERA TING LIMITSREPORT Table of Contents Page 1.0 AVERAGE PLANAR LINEAR.HEAT GENERATION RATE E(APLHGR ... 1 1.1 Limits for Technical Specification 3.2.1 2.0 MINIMUM CRITICAL POWER RATIO (ODYN OPTION, 2.1 Limits for Technical Specification 3.2.2...................

3.0 LINEAR HEAT GENERATION RATE (LHGR) ............. .......... 11 3.1 Limits for Technical Specifications 3.2.3 _

4.0 AVERAGE POWER RANGE MONITOR SETPOINTS... 14 4.1 Limits for Technical Speciication Table 3.3.1.1-1 (OPRM Upscale)-..... 14 5.0 ROD BLOCK MONITOR _

5.1 Allowable Value for Technical Specification Table 3.3.2.1-1 .-.. 15

6.0 REFERENCES

FOR TECHNICAL SPECIFICATIONS ....................................

7.0 REFERENCES

FOR TECHNICAL SPECIFICATION BASES....... ... _7 8.0 SOURCEDOCU S .................... 18 Page i

Revision 0 Cycle 11 NINE MILE POINT UNIT 2 CORE OPERA TING LIMITS REPORT 1.0 AVERAGEPLANAR LINEAR HEAT GENERATION RATE (APLHGRJ 1.1 Limits for Technical Specification 3.2.1 The APLHGR(s) for each type of fuel as a fimction ofAVERAGE PLANAR EXPOSURE shall not exceed the limits shown in Table 1.

The limits of Table I shall be reduced to a value of .78 times the two recirculation loop operntion limit when in single recirculation loop operation.

Page I O 19

NINE MILE POINT UNIT 2 COLR2-11, Revision 0 Table 1 Cycle 11 MAPLHGR VERSUS AVERAGE PLANAR EXPOSURE Average -MAPLHGR Limlts (kwlft)

Planar Bundle Bundle Bundle Bundle Bundle Bundle Bundle Bundle Bundle Bundle ExposuretGEllt.6 GEII9A GEI -13. G.EtllC9C tF14-CIOA 0F14CIOB GF14-CIOC GE14-ClIA GE14-CIB GE14421IG GWd/ST _ I_ _

0.00 13.42 13.42 13.42 13.42 12,82 12.82 12.82 12.82 12.82 12.82 14.51 - - - - 12.82 12.82 1282 12.82 12.82 12.82 19.13 -- -- - - 12.82 12.82 12.82 12.82 12.82 12.82 19.72 13.42 13.42 13.42 13.42 - - - --- - _

27.22 12.29 12.29 12.29 12.29 _ - - -- - - -

57.61 -- -- - 8.00 8.00 8.00 8.00 8.00 8.00 63.50 8.90 8.90 8.90 S.90 5.00 5.00 5.00 5.00 5.00 5.00 Fuel Tvpe ID GE I I-P9CUl375-l2GZ-l20T-146-T6 GEt I-C6 GEII-P9CUB04 12GZ-120T-146-T6-2504 GEl 1-C9A GE1I -P9CUB407-14GZ-120T- 146-T6-2505 GEi 1C913 GE1I I-P9CUB407-14GZ-120T-146-T6-2506 GEI IC9C GEI4-PI OCNAB406-15GZ-1 20T-I50-T6-2687 GE14-CIOA GE14-PI OCNAB404-15GZ-120T-1 50-T6-2688 GE14-CIOB GEI4-PICNA13403-17Z-120T-150-T6-2689 0}E147CIOC GE14-PIOCNAB415^1 7GZ-120T-15Q-T6-2874 GEI4-CIIA GE14-PI OCNAB4l4-I6GZ-12OT- I50-T6-2873 GE14-C1B GE14-PINA 417-1 SGZ-12OT- 150-T6-2872 GEI4-CIIC NOTE: (1) A M-' indicates that there is no entry for this box and the limit tan be determined by linearly interpolating between the previous and next point in each column. MAPLHGRs are interpolated between exposure points for which explicit values are given.

Page 2 of 19

Revision 0 cycle 11 NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT 2.0 MINIMUM CRITICAL POWER RATIO (ODYN OPTION B) 2.1 Limits for Technical Specification 3.2.2 The Minimum Critical Power Ratio (MCPR) shall be equal to or greater than the appropriate MCPR limit from Figures 2a-14 and 2b-14 fbr GE14 and Figures 2a-11 and 2b- I1I for GEI I times the K(f) shown in Figure 2c with tau (or "'t')

defined as follows:

T = (T. - T,) / (tA -

where:

T^, = 0.866 seconds, control rod average scram insertion time limit to notch 39 per Specification 3.1.4.

,=672+ 1.65 * £ N, I Nj * .016 2 n i.1 i-i n = number of surveillance tests performed in cycle Ni= number of active control rods measured in the iP surveillance test r, =:average scram time to notch 39 of all rods measured in the i? surveillance test N, = total number of active rods measured in Specification 3.1.4.1.

NOTES: i. The MCPR Operating Limits in Figures 2a-t 1, 2a-14, 2b-11 and 2b-14:are based on a 1.07 Safety Limit MCPR (SLMCPR) for two recirculation loop operation and a 1.09 Safety Limit MCPR for single loop operation.

2. r = 1.0 prior to performance of the initial scram time measurements for the cycle.
3. The Operating Limit MCR values for Turbine Bypass Out of Service and EOC-RPT Out of Service are higher (more limiting) than for the standard normal operation case, and are therefore specifically identified in Figures 2a-14, 21,4, 2a-1 1J and 2b-1 I.The OLMCPR values for all other analyzed EOOS transient events are bounded by the Normal Operation limits.
4. For operation between 30% and 90% RTP with a backup pressure regulator out of service, additional MCPR limit requirements have been established in Figures 2d and 2e.
5. EOR on Figures 2a-14, 2b-14, 2a-11, and 2b-ll is the End of Rated exposure as defined in the Cycle Management Report Page 3 of 19

Figure 2a-14 Nine Mile Point 2 Cycle 11 GE14 MCPR Operating Limits (Beginning Of Cycle to EOR-1140 MWdIST) 1.54 1.52 Turbine B-ypass Inoper able __

1.5 a-0

1.481 o (0,1.48)/

EOC-RPT Inoperable a 1.46-0 ,4 0 0.2 0.4 0.6 0.8 1 Tau Page 4 of 19

Figure 2b-14 Nine Mile Point 2 Cycle 11 GE14 MCPR Operating Limits (EOR-1140 MWdJST to End Of Cycle) r 0-0 0

E a.

E 0 0.2 0.4 0.6 0.8 1 Tau Page 5 of 19

Figure 2a-1 I Nine Mile Point 2 Cycle II GEII MCPR Operating Limits (Beginning Of Cycle to EOR.1140 MWd/ST) 1.46 1.44 -

1.42 1.4 (1, 1.40)

- Turbine Bypass Inoperable C 1.38 1 U G 0,1.38)

EOC-RPT Inoperable 1.36-1.34 -- (1, 1.34) 1.32 -

1 0.3 .31) 1.3 2 0.4 . 0 0 0.2 0.4 0.6 0.81 Tau Page 6 of 19

Figure 2b-11 Nine Mile Point 2 Cycle 11 GE 1I MCPR Operating Limits (EOR-1 140 M`WdcST to End Of Cycle) 1.48 / I(I, 1A49) 1.48 1.46 -

EOCRPT Inoperable Le E 1.44 2 a! 42 -

14 (1 1.41)

E W I 18 Turbine Bypss Inoperable 1.38 (1 1.38 4Et,_

0 0.2 0.4 0.6 0.8 I Tau Page 7 of 19

NINE MILE POINT UNIT 2 Figure 2te C01R1-I 1, Revision 0 Cycle lI.

Kf vs Core Flow 1.4 1.3 1.2 66.

e 1.1 0

0.9 20 30 40 50 60 70 80 90 100 110 Core Flow, % of rated Page 8 of 19

NINE MILE POINT UNIT 2 COLR2-11, Revision 0 Cycle 11 Figure 2d GE11 MCPR Limits for Operation Without a Backup Pressure Regulator 2.2 For operation >70% but c90% RTP maintain MCPR > normal operation MCPR limit from Figures 2a-1 1 or 2b-11 divided by the fraction of rated thermal power.

For operation >30% and c70% RTP the additional requirements are as shown in this 21 Figure Operating Limi MCPR (P) = OLMCPR(P) = f1.58+00080(70%-P}l There are no additional MCPRlimirs required for operation <30% and >90% RTP with a backup pressure regulator out of service.

2 1.9 ACCEPTABLE :EGI N

0. Operating MCPR shall be > MCPR limit ime 1.7 1.6 RESTR CTED REGION Enter T ch. opec. 3 ____

1.5 1.4

......... ~~~~~~~~~ I _..... ._

30 35 40 45 50 55 60 65 70 Core Thermal Power (P) in units of % Rated Thermal Power (%:RTP)

Page 9 of 19

NINE MILE POINT UNIT 2 COLR2-l, Revision 0 Cycle 11 Figure 2e GE14C MCPR Limits for Operation Without a Backup Pressure Regulator 2.3 For operation >70% but <90% RTP maintain MCPR > normal operation MCPR limit from Figures 2a-14 or 2b114 divided by the fraction of rated thermal power.

2i2 For operation >300% and c70% RTP the additional requirements are as shown in this figure:

2.2 Operating Limit MCPR (P)= OLMCPR(P) = lt.72+0.00825(70%.-P)l There are no additional MCPR limits required for operation <30% and >90% RTP with a backup pressure regulator out of service.

2.1 2

ACCEPTABLE REGION Operating MCPR shall be > MCPR limit line a:

C.

1.7 RESTRICTED REGION En'ter Tech. Spec.s .2.2 1.6 l - _ l_ __ - t 1.5 30 3S5 40 45

-l It 50 55 Uilll 60 65 70 Core Thermal Power (P)In units of % Rated Thermal Power (%YRTP)

Page 10 Of 19

Revision 0 Cycle 11 NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT 3.0 LINEAR HEAT GENERATION RATE (LHGR) 3.1 Limits forTechnical Specification 3.2.3 During power operation, the Linear Heat Generation Rate (LHGR) of any rod in any fuel assembly at any axial location shall not exceed the limiting values shown in RSLD-10, Revision 0, "Nine Mile Point Unit 2 Reload 10, Reload Specific Lattice Data". This document contains the LHGR limits for both U02 rods (which contain no gadolinium) and the most limiting gadolinium-bearing rods.

Other gadolinium-bearing rods have LHGR limits which lie between these two curves. Compliance with these limits will be monitored by the plant's process computer.

NOTE: For operation >30% and <90% RTP with a backup pressure regulator out of service, additional LHGR limit requirements have been established as shown in Figure 3-1 1 and 3-14. There are no additional LHGR limits required for operation

<30% and >90% RTP for operation with a backup pressure regulator out of service.

Page IIof 19

Figure 3-11 LHGR Limit for Operation Between 30% and 90% RTP Without a Backup Pressure Regulator for GE11 U.9 ,V -

F'ES7 I4i rRICTEI ) REGION AA UY 1-t nte 1-ech

_.. U. I r M.",:;v0-0 0.8 _ _ _ _ _ _ __ _

-J U.

0. 75 __ t

_ j _ _ _ _

/

1 i

_ 1 I _

C'.7 I -- .____ I __

ACCEPT1BIE REG1bN Opeatng MFLPD shall be

0.I65 I MFLPD - [0.8-M0.O02Z5W70%-P)J For 70% S P <90%:

MFLPD =FRTP 5 _ _ _ _

30 35 40 45 SO 55 60 65 :70 75 80 85 90 Core Thermal Power (P) In units of % Rated Thermal Power (%RTP)

Page 12 of 19

Figure 3-14 LHGR Limit for Operation Between 30% and 90% RTP Without a Backup Pressure Regulator for GE14C RES RICTED :REGI N 0T _Tech. e. 3,231 85 - _

0 .8_ _ _ _ _ _ _ _ I _ _IA_ _ _ _ _ _

7 a

a.

7 n A _r 4 5 -

7 U.

CCEPTB E :REGION[

Operating MFLPD shall be

  • MFLPD limit MrLPD Limit For 30%A s P < 700%
^ t ,5__ - ___ MFLPD = 0.85-0.0035(70°-P)]

For 70% P< 90%:

MFLPD FRTP 0.t - .

30 35 40 45 50 55 60 65 70 75 80 85 90 Core Thermal Power (P)In units of % Rated Thermal Power (%RTP)

Page 13 of 19

Revision 0 Cycle 11 NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT 4.0 AVERAGE POWER RANGE MONITOR SETFOINTS 4.1 Limits for Technical Specification Table 3.3 1.1-1 (OPRM Upscale)

ALLOWABLE VALUE< 1.13 Page 14 of 19

Revision 0 Cycle I1 NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT 5.0 ROD BLOCK MONITOR LRBM) 5.} Allowable Value for Technical Specification Table 3.3.2.1-1 Function Allowable Value RBM Upscale :50.66 (NV - AW) + 47%

with a maximum of 113%

NOTE: W = Loop Recirculation Flow as a percentage of the loop recirculation flow which produces a rated core Slow of 108.5 MLB/HR. AW is defined as the difference in indicated drive flow (in percent of drive flow which produces rated core flow) between two loop and single loop operation at the same core flow. AW - 0 for two loop operation. AW = 5% for single loop operation.

Page 15 of 19

Revision 0 Cycle 11 NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT

6.0 REFERENCES

FOR TECHNICAL SPECIFICATION Technical Specification 5.6.5.b. 1:

General Electric Standard Application for Reactor Fuel, NEDE 24011 -P-A-15 and NEDE 2401 1-P-A-15-US (September 2005).

Page 16 of 19

Revision 0 Cycle 11 NINE MILE POINTUNIT 2 CORE OPERATING LIMITS REPORT

7.0 REFERENCES

FOR TECHNICAL SPECIFICATION BASES 2.1.1 BASES REFERENCE 3:

General Electric Standard Application for Reactor Fuel, NEDE 2401 1-P-A-15 and NEDE 2401 1-P-A-lS-US (September 2005).

2.1.1 BASES REFERENCE 4:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle 11, 0000-0023-4708-SRLR, Rev. 0, February 2006.

3.1.1 BASES REFERENCE 7:

General Electric Standard Application for Reactor Fuel, NEDE 24011 -P-A-15 and NEDE 2401 I-P-A-15-US (September 2005).

3.1.6 BASES REFERENCE 1:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle 11, 0000-0023-4708-SRLR, Rev. 0, February 2006.

03.2.1 BASES REFERENCE 1:

General Electric Standard Application for Reactor Fuel, NEDE 24011 -P-A-15 and NEDE 2401 1-P-A-I5-US (September 2005).

3.2.2 BASES REFERENCE 2:

General Electric Standard Application for Reactor Fuel, NEDE 2401 1-P-A-15 and NEDE 2401 I-P-A-IS-US (September 2005).

3.2.2 BASES REFERENCE 3:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle 11, 0000-0023-4708-SRLR, Rev. 0, February 2006.

3.2.3 BASES REFERENCE 1:

General Electric Standard Application for Reactor Fuel, NEDE 2401 1-P-A-15 and NEDE 2401 1-P-A-15-US (September 2005).

3.2.3 BASES REFERENCE 2:

Supplemental Reload Licensing Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle 11, 0000-00234708SRLR, Rev. 0, February 2006.

3.2.4 BASES REFERENCE 3:

General Electric Standard Application for ReactorFuel, NEDE 2401 I-P-A-15 and NEDE 24011 -P-A-I5-US (September 2005).

Page 17 of 19

Revision 0 Cycle II NINE MILE POINT UNIT 2 CORE OPERTINGLIMITSREPORT 8.0 SOURCE DOCUMENTS The Core Operating Limits contained in this report were obtained from the following documents:

CORE OPERATING LIMIT REFERENCE Section 1.0 - APLHGR LIMITS "Engineering Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle 11", 0000-0050-1550-ER, Rev 0, March 2006 Section 2.0 - MCPR LIMITS 'Engineering Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle 11" 0000-0050-1550-ER, Rev 0, March 2006 Section 3.0 - LHGR LIMITS "'Engineering Report for Nine Mile Point Nuclear Station Unit 2, Reload 10, Cycle I I", 00000050-1550-ER, Rev 0, March 2006 Page 18 of l9

Revision 0 Cycle I1I NINE MILE POINT UNIT 2 CORE OPERATING LIMITS REPORT 8.0 SOURCE DOCUIMENTS (Cont)

CORE OPERATING LIMIT REFERENCE Section 4.0 - APRM SETPOINTS Limits for Technical Specification "Engineering Report for Nine Mile Point Table 3.3. 1.1-1 (OPRM Upscale3 Nuclear Station Unit 2, Reload 10, Cycle 11"' 0000-0050-1550-ER, Rev 0, March 2006 Section 5.0 - RBM SETPOINTS GE Engineering Report for Nine Mile Point Nuclear Station Unit 2 Reload 2 Cycle 3, NFD92-016 January 1992 Page 19 of 19