|
---|
Category:License-Operator
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] Category:Spreadsheet File
MONTHYEARML14177A7602014-06-19019 June 2014 FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014 ML0612901962005-04-0101 April 2005 04-2005-Operating Exam Comments 2014-06-19
[Table view] |
Text
C:\FileNet\ML061290196.wpd APPENDIX E - REGION IV OPERATING TEST JOB PERFORMANCE MEASURE QUALITY REVIEW MATRIX
- 1. 2. 3. Attributes 4. Job Content 5. 6.
JPM# Dyn LOD Errors U/E/S Explanation (D/S) (1-5) (See below for instructions)
IC Cues Critical Scope Over- Job- Minutia Focus Steps (N/B) lap Link P-1 S 1 U JPM states establish Aux Spray flow under Harsh conditions, no conditions given.
Cue has examiner provide applicant copy of necessary procedure. Should applicant be required to locate/obtain procedure before provided?
Need value for MU-084 to be throttled, This valve controls rate of aux spray flow. Is it sat if applicant fully shuts valve?
JPM consists of 2 valve manipulations.
Not very discriminatory in nature.
P-2 S 3 S Cue has examiner provide applicant copy of necessary procedure. Should applicant be required to locate/obtain procedure before provided?
Need information for examiner if step 4 is not completed so proper indications can be provided.
Steps 7and 12 are not critical, no effect on task if not completed. Breakers are already in the required positions.
Why is Step 13 critical?
P-3 S 3 S Cue has examiner provide applicant copy of necessary procedure. Should applicant be required to locate/obtain procedure before provided?
Are pictures available to show trip plunger since cant open to view?
If the disconnect switch for the governor is open, would the trip rod latch?
What is safety issue with access to HV-4705? Does this a concern for actual operations?
S-1 D 2 S S-2 D 2 S S-3 D 3 S S-4 D 2 S S-5 D 3 S Note after step 4 states steps 4 and 5 may not be performed by examinee if they recognize insufficient S/G pressure to feed S/Gs. Step 4 is feeding S/G with P-141, step 5 is starting P-140, Step 6 is feed S/G with P-140. Should note be Step 5 and 6 may not be done?
Cue after step 9 is redundant to task.
Is there a limit on max temp RCS/core Thermocouple s are allowed to reach for sat performance of JPM?
S-6 D 2 S When should Equipment Hatch closed cue be given (after step 9) Do we wait for applicant to ask/check status?
Why is it critical to ensure supply valves are open but not the exhaust valves?
Why cue step 9, cant simulator indicate failure?
S-7 D 3 S Cue has examiner provide applicant copy of necessary procedure. Should applicant be required to locate/obtain procedure before provided?
Why provide copy of FS-7? Have applicant locate form needed, or at least state form needed before providing it.
What are proper running amps for HPSI P017?
- Page 1 -
JPM# Dyn LOD Errors U/E/S Explanation (D/S) (1-5) (See below for instructions)
IC Cues Critical Scope Over- Job- Minutia Focus Steps (N/B) lap Link S-8 D 2 S Doesnt simulator provide CRIS Train A RESET/TEST light indication?(Step 2 and 5)
Not very discriminatory in nature.
RO A.1.a 1 step, direct read off graph, Low to No discriminatory value.
RO A1.b simple math problem, formulas and data given. Low to No discriminatory value.
RO A-2 What is 9are) specific compensatory action(s) required?
What are the links that need to be opened?
Initial conditions state ME-039 swith is defective, Step 4 disables L-040?
L-040 is not listed in ARI Attachment 2.
SRO A-3 Cue is to provide copy of EAP form and SO23-VII-30. Should applicant be required to locate or request the appropriate forms/procedures?
A-4 Should applicant locate or request appropriate procedure vice be given it?
May not be sufficient information given to determine if GE or SAE, no information on Rad levels, Containment status, condition of fuel, RX vessel wter level, etc.
Applicant is given CRS has diagnosed a LOCA, Tab B3 states it is applicable for LOCA. No evaluation is needed by the applicant to select Tab B3.
Low to No discriminatory value.
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
- 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
- 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
- 3. Check the appropriate box when an attribute weakness is identified:
- The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
- The JPM does not contain sufficient cues that are objective (not leading).
- All critical steps (elements) have not been properly identified.
- Scope of the task is either too narrow (N) or too broad (B).
- Excessive overlap with other part of operating test or written examination.
- 4. Check the appropriate box when a job content error is identified:
- Topics not linked to job content (e.g., disguised task, not required in real job).
- Task is trivial and without safety significance.
- 5. Based on the reviewers judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 6. Provide a brief description of problem in the explanation column. Provide conclusion on whether JPM SET criteria satisfied (i.e., number/distribution of safety functions, A.3 and A.4 integrated with parts B/C, Admin topics per section meet ES).
- Page 2 -