ML061230382

From kanterella
Jump to navigation Jump to search
Notification of NRC Initial Operator Licensing Examination (Er 05000285/2006-301)
ML061230382
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/02/2006
From: Gody A
Operations Branch IV
To: Venable J
Entergy Operations
References
50-285/06-301 50-285/06-301
Download: ML061230382 (4)


See also: IR 05000285/2006301

Text

May 2, 2006

Joseph E. Venable

Vice President Operations

Waterford 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70066-0751

SUBJECT:

WATERFORD 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION (EXAMINATION REPORT 05000285/2006-301)

In a telephone conversation on May 2, 2006, between Messrs. Jim Hall, Operations Training

Supervisor, and Jim Drake, Chief Examiner, arrangements were made for the administration of

licensing examinations at Waterford 3 during the week of November 13, 2006.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." Your support for onsite validation of the examinations is required during the

week of October 16, 2006.

To meet the above schedule, it will be necessary for your staff to submit the examination

outlines by August 14, 2006. The draft written examinations, operating tests, and the

supporting reference materials identified in Attachment 2 of ES-201 and as specified by the

chief examiner will be due by September 11, 2006. Any delay in receiving the examination and

reference materials, or the submission of inadequate or incomplete materials, may cause the

examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

Entergy Operations, Inc.

-2-

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, [writing the

examinations, ]and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to

the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response will be made available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Hall has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Drake at 817-276-6558, or myself

at 817-860-8159 .

Sincerely,

/RA/ REL for

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-382

License: NPF-38

cc:

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Entergy Operations, Inc.

-3-

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, MS 39205

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70066-0751

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70066-0751

Chairman

Louisiana Public Service Commission

P.O. Box 91154

Baton Rouge, LA 70821-9154

Director, Nuclear Safety &

Regulatory Affairs

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70066-0751

Michael E. Henry, State Liaison Officer

Department of Environmental Quality

Permits Division

P.O. Box 4313

Baton Rouge, LA 70821-4313

Parish President

St. Charles Parish

P.O. Box 302

Hahnville, LA 70057

Winston & Strawn LLP

1700 K Street, N.W.

Washington, DC 20006-3817

Entergy Operations, Inc.

-4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (MCH)

Branch Chief, DRP/E (DNG)

Senior Project Engineer, DRP/E (VGG)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

SUNSI Review Completed: ___Y___ADAMS:  : Yes

G No Initials: ______

Publicly Available G Non-Publicly Available G Sensitive
Non-Sensitive

OE:OB

C:OB

JFDrake/lmb

ATGody

/RA/

/RA/ REL for

5/2/06

5/2/06

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax