ML061230382
| ML061230382 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/02/2006 |
| From: | Gody A Operations Branch IV |
| To: | Venable J Entergy Operations |
| References | |
| 50-285/06-301 50-285/06-301 | |
| Download: ML061230382 (4) | |
See also: IR 05000285/2006301
Text
May 2, 2006
Joseph E. Venable
Vice President Operations
Waterford 3
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
SUBJECT:
WATERFORD 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION (EXAMINATION REPORT 05000285/2006-301)
In a telephone conversation on May 2, 2006, between Messrs. Jim Hall, Operations Training
Supervisor, and Jim Drake, Chief Examiner, arrangements were made for the administration of
licensing examinations at Waterford 3 during the week of November 13, 2006.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors." Your support for onsite validation of the examinations is required during the
week of October 16, 2006.
To meet the above schedule, it will be necessary for your staff to submit the examination
outlines by August 14, 2006. The draft written examinations, operating tests, and the
supporting reference materials identified in Attachment 2 of ES-201 and as specified by the
chief examiner will be due by September 11, 2006. Any delay in receiving the examination and
reference materials, or the submission of inadequate or incomplete materials, may cause the
examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
Entergy Operations, Inc.
-2-
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, [writing the
examinations, ]and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to
the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosure(s), and your response will be made available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Hall has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Drake at 817-276-6558, or myself
at 817-860-8159 .
Sincerely,
/RA/ REL for
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-382
License: NPF-38
cc:
Senior Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Entergy Operations, Inc.
-3-
Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, MS 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, MS 39205
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
Chairman
Louisiana Public Service Commission
P.O. Box 91154
Baton Rouge, LA 70821-9154
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA 70066-0751
Michael E. Henry, State Liaison Officer
Department of Environmental Quality
Permits Division
P.O. Box 4313
Baton Rouge, LA 70821-4313
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, LA 70057
Winston & Strawn LLP
1700 K Street, N.W.
Washington, DC 20006-3817
Entergy Operations, Inc.
-4-
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (MCH)
Branch Chief, DRP/E (DNG)
Senior Project Engineer, DRP/E (VGG)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
SUNSI Review Completed: ___Y___ADAMS: : Yes
G No Initials: ______
- Publicly Available G Non-Publicly Available G Sensitive
- Non-Sensitive
OE:OB
C:OB
JFDrake/lmb
ATGody
/RA/
/RA/ REL for
5/2/06
5/2/06
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax