Fire Protection Program - Post-Fire Operational Manual Actions
ML061150055
Person / Time
Site: Browns Ferry  
Issue date: 04/24/2006
From: Crouch W
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML061150055 (6)


Text

April 24, 2006 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2 and 3 - FIRE PROTECTION PROGRAM - POST-FIRE OPERATOR MANUAL ACTIONS TVA and NRC discussed the BFN Fire Protection program at a meeting on April 5, 2006. As a result of that meeting, TVA has initiated the following actions:

Identify the post-fire manual actions outside the control room in 10 CFR 50 Appendix R III.G.2 areas in the site Corrective Action Program (Complete PER 101631);

Use the Fire Protection Significance Determination Process (SDP) (Inspection Manual 0609, Appendix F) to evaluate and determine the risk associated with the 10 CFR 50, Appendix R III.G.2 areas with post-fire manual actions; and Correct or take compensatory actions for items identified as Greater than Green and take compensatory actions for items identified as Green via the SDP.

U.S. Nuclear Regulatory Commission Page 2 April 24, 2006 TVA has previously verified and validated the existing Appendix R post-fire manual actions for Units 2 and 3 via timed walk downs. The Appendix R post-fire manual actions for Units 2 and 3 were reviewed and approved by NRC via Safety Evaluation Reports (SERs), but no NRC approved exemption exists. Following completion of the SDP, the Green manual actions will be the short-term compensatory actions for Units 2 and 3. No compensatory actions are necessary for Unit 1 at this time.

Prior to Unit 1 restart (enter into Mode 2 or 3), TVA will correct the areas shown to be risk significant (greater than green) as a result of the SDP. TVA will use existing Unit 1 License Condition 2.C.(13) to approve the Unit 1, 2 and 3 Fire Protection Report (i.e., supercede the current Unit 2 and 3 Fire Protection Report) prior to restart (enter into Mode 2 or 3). At restart, Unit 1 will utilize the same type of manual operator actions as are currently used in Units 2 and 3. The manual operator actions will be demonstrated to be feasible via timed walkdowns.

A listing of the commitments made in this letter is provided in Enclosure 1. If you have any questions regarding this information, please contact me at (256) 729-2636.

Sincerely, Original signed by:

William D. Crouch Manager of Licensing and Industry Affairs

U.S. Nuclear Regulatory Commission Page 3 April 24, 2006 Enclosure cc (Enclosure):

State Health Officer Alabama Department of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, Alabama 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, Alabama 35611 (Via NRC Electronic Distribution)

Enclosure cc (Enclosure):

U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Malcolm Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 cc: continued page 4

U.S. Nuclear Regulatory Commission Page 4 April 24, 2006 Enclosure cc (Enclosure):

Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 5 April 24, 2006 JEM:BAB Enclosure cc (Enclosure):

B. M. Aukland, POB 2C-BFN M. Bajestani, NAB 1A-C A. S. Bhatnagar, LP 6-C J. C. Fornicola, LP 6A-C R. G. Jones, POB 2C-BFN G. W. Morris, LP 4G-C B. J. OGrady, PAB 1E-BFN K. W. Singer, LP 6A-C E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS, WT CA-K s/Licensing/Lic/Submit/Subs/Fire Protection Program Appendix R.doc

E-1 ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 Commitment Listing

1. For Unit 1, TVA will correct the 10 CFR 50, Appendix R III.G.2 manual operator actions shown to be risk significant (greater than green) as a result of the SDP prior to restart (enter into Mode 2 or 3).
2. For Units 2 and 3, TVA will correct or take compensatory actions for the 10 CFR 50, Appendix R III.G.2 manual operator actions shown to be risk significant (greater than green) as a result of the SDP prior to September 6, 2006.
3. For Units 2 and 3, take compensatory actions for 10 CFR 50, Appendix R III.G.2 manual operator actions identified as Green via the SDP prior to September 6, 2006.
4. For Unit 1, take compensatory actions for 10 CFR 50, Appendix R III.G.2 manual operator actions identified as Green via the SDP prior to restart (enter into Mode 2 or 3).