ML061020222
ML061020222 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 03/27/2006 |
From: | Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML061020222 (9) | |
Text
IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0 Eltergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Paae 1 of 1
` - E /7i'ergy CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE: 3/27/06 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-1 03, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
AFFECTED DOCUMENT: IP3 ITS/BASESITRM DOC# REV# TITLE I INSTRUCTIONS
- FOLLOW THE ATTACHED INSTRUCTIONS********************** **'**
- PLEASE NOTE EFFECTIVE DATE***********
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE D)ATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).
NAME (PRINT) SIGNATURE DATE CC#
Ycc)j
14-OCT-05 Page: 1 DISTRIBUTION CONTROL LIST 4ument Name: ITS/BASES/TRM CCNAME NAME DEPT LOCATICN 1 OPS PROCEDURE GROUP SUPV. OPS PROCEDURE GROUP IP2 3 PLANT MANAGER'S OFFICE UNIT 3(UNIT 3/IPEC ONLY) I P2 5 CONTROL ROOM (FL) OPS (3PT-DO01/6 (IP3/IPEC) IP3 11 R ES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY) 45-4-A
.19 STEWART ANN LI CENS ING GSB-2D 20 CHEMI STRY SUPERVISOR CHEMISTRY DEPARTMENT 45-4-A 21 I'SC (I P3) EEC BUILDING IP2 22 SHIFT MGR. (LUB-001-GEN) OPS (UNIT 3/IPEC ONLY) IP3 23 LIS LICENSING & INFO SERV OFFS ITE S IMULATOR TRAIN(UNIT 3/IPEC ONLY) 48-2-A
'. 28 RESIDENT INSPECTOR US NRC 88' ELEVATION IP2 32 EOF E-PLAN (ALL EP'S) EOF 47 CHAPMAN N ,A BECHTEL OFFS ITE 1 tit) 50 5 TADBEMY L. 3ILeRf+/- 4 tWPk > WESTINGHOUSE ELECTRIC OFFSITE
/ l
' ~~~
7\ 1t 2_7 T - -
- TECIIIICL tM.. - --.
.W 61 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 48-2-A 69 CONROY PAT LICENSING/ROOM 205 GSB-2D 99 BARANSKI J (ALL) ST. EMERG. MGMT. OFFICE OFFSITE b 106 SIMULATOR INSTRUCT AREA TRG/3PT-D001-D006 ONLY) #48
.164 CONTROL ROOM (FL) OPS (3PT-D001/6 (IP3/IPEC) IP3 207 TROY M PROCUREMENT ENG. GSB-4B 273 FAISON CHARLENE NUCLEAR LICENSING WPO- 12 319 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48
\ 354 L.GRANT(LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 357 L.GRANT(ITS/INFO ONLY) TRAINING - ILO CLASSES 48-2-A 424 GRANT LEAH (9 COPIES) (UNIT 3/IPEC ONLY) #48 II 474 OUELLETTE P ENG., PLAN & MGMT INC OFFSITE MAINTENANCE ENG/ SUPV 45-1-A 4,4 CLOUGHNESSY PAT PLANT SUPPORT TEAM GSB-3B 492 FSS UNIT 3 OPERATIONS K-IP-I210 493 OPERATIONS FIN TEAM 33 TURBIN DECK 45-1-A 494 AEOF/A.GROSJEAN(ALL EP'S) E-PLAN (EOP'S ONLY) WPO-12D 496 L.GRANT (LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 497 L.GRANT (LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 500 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 501 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 512 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 513 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 518 DOCUMENT CONTROL DESK NRC (ALL EP 'S) OFFS ITE 529 FIELDS DEBBIE OUTAGE PLANNING IP3/OSE
Unit 2 Revision 0 Unit 3 Revision X]
Distribution of IP3 Technical Specification Amendment 230 (Approved by NRC March 23, 2006)
Pages are to be inserted into your controlled copy of the Improved Technical Specifications follow ng the instructions listed below. The TAB notation indicates which section the pages are located.
REMOVE PAGES INSERT PAGES TAB - Facility Operating License Page 3, (Amendment 229) Page 3, (Amendment 230)
TAB - List of Effective Pages Pages 1 through 3, Pages 1 through 3, (Amendment 229) (Amendment 230)
TAB - List of Amendments Page 13 Page 13 TAB 3.6 - ECCS Page 3.5.2-3 (Amendment 205) Page 3.5.2-3 (Amendment 230)
Page 1 of I
(4) ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70, Amdt. 203 to receive, possess, and use in amounts as required any 11/27/00 byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) ENO pursuant to the Act and 10 CFR Parts 30 and 70, to Amdt. 203 possess, but not separate, such byproduct and special 11/27/00 nuclear materials as may be produced by the operation of the facility.
C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter l: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximnum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not in excess of 3216 megawatts thermal (100% of rated power).
(2) Technical Specifications
-The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 230 are hereby incorporated in the License. EINO I shall operate the facility in accordance with the Technical Specifications.
(3) (DELETED) Amdt. 205 2-27-01 (4) (DELETED) Amdt. 205 2-27-01 D. (DELETED) Amdt.46 2-16-133 E. (DELETED) Amdt.37 5-14-31 F. This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.
Amendment No. 230
INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 1 of 3 Page l Amend Section 3.0 2 205 8 225 1 229 3 205 9 213 Table of Contents 2 226 Section 3.2.3 10 205
- =227 3 229 1 205 11 225 ii 227 4 212 2 205 12 205 iii 227 5 226 3 205 13 205 iv _ 227 Section 3.1.1 4 205 Section 3.3.3 Section 1.1 1 205 Section 3.2.4 1 226
_ . 211 1 205 Section 3.1.2 1 205 2 2 205 1 205 2 205 3 205 3 224 2 205 3 205 4 228 4 205 Section 3.1.3 4 205 5 228 5 225 1 205 Section 3.3.1 Section 3.3.4 6 205 2 205 1 205 1 226 7 205 Section 3.1.4 2 205 2 205 8 205 1 l 205 3 205 Section 3.3.5 Section 1.2 2 205 4 205 1 l 205 1 205 3 205 5 205 2 J 205 2 205 4 205 6 205 Section 3.3.6 3 205 5 1 205 7 205 1 205 Section 1.3 Section 3.1.5 8 205 2 . 205 1 205 1 l205 9 205 3 205 2 205 2 205 10 205 4 205 3 205 Section 3.1.6 11 205 5 l 205 4 205 1 l 205 12 205 - Section 3.3.7 5 205 2 1205 13 l225 1 205 6 205 3 205 14 205 2 205 7 205 Section 3.1.7 15 225 3 l_205 8 205 1 205 16 205 Section 3.3.8 9 205 2 205 17 205 1 l 215 10 205 3 205 18 205 2 . 205 11 205 4 205 19 225 Section 3.4.1 12 205 Section 3.1.8 20 225 1 1 225 13 205 1 1 205 Section 3.3.2 2 J 225 Section 1.4 2 T 205 1 205 Section 3.4.2 1 205 Section 3.2.1 2 205 1 205 2 205 1 205 3 205 Section 3.4.3 3 205 2 205 4 205 1 205 4 205 3 205 5 205 2 205 Section 2.0 Section 3.2.2 6 205 3 220
_ 1 225 1 l 205 7 205 4 220 The latest amendment reflected in this list is: Amendment 230
m INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 2 of 3
-- 220 Section 3.4.13 4 205 Section 3.7.3
-f;rti Q:C ItjlII I I a A1 1 c 205 5 205 1 207
_ 1 205 2 205 Section 3.6.3 2 207 Section 3.4.5 Section 3.4.14 1 205 3 207 1 205 2 205 Section 3.7.4 2 205 3 205 1 226 3 205 3 205 4 205 2 j 205 Section 3.4.6 4 205 5 205 Section 3.7.5 1 205 5 205 6 205 1 226 2 205 Section 3.4.15 Section 3.6.4 2 205 3 205 1 226 1 l 205 3 205 Section 3.4.7 2 205 Section 3.6.5 4 205 1 205 3 205 1 l 205 Section 3.7.6 2 205 4 205 Section 3.6.6 1 205 3 205 Section 3.4.16 1 1 205 2 ] 205 Section 3.4.8 1 226 2 1205 Section 3.7.7
- 205 2 205 3 1205 1 205 2 205 3 205 4 205 2 218 4 205 Section 3.6.7 Section 3.7.8
. Section 3.4.9 Section 3.5.1 1 1 205 l1 1 205 1
2 225 225 --- -- 222 - .2 J205 12 ] 205 Section 3.4.10 2 .205 Section 3.6.8 Section 3.7.9 1 205 3 205 1 J 228 1 205 2 205 Section 3.5.2 Section 3.6.9 2 T_205 Section 3.4.11 1 205 1 1 205 3 T_205 1 226 2 205 2 ] 205 Section 3.7.10 2 205 3 230 Section 3.6.10 l1 l205 3 205 4 205 1 205 Section 3.7.11 Section 3.4.12 Section 3.5.3 2 205 1 223 1 1205 1 c 226 3 205 2 [ 205 2 -l226 2 205 4 205 Section 3.7.12 3 1205 Section 3.5.4 Section 3.7.1 l1 205 1 205 1 205 Section 3.7.13 4 205 2 i 205 2 205 1 [ 215 5
6 205 205 Section 3.6.1 3 225 2 [ 205 7 205 1 J 205 4 205 Section 3.7.14 8 205 2 J_205 l [l205 9 220 Section 3.6.2 Section 3.7.2 10 220 1 l 205 1 205 Section 3.7.15 11 l220 2 205 2 205 1 l 205 12 1220 3 J 205 3 205 2 [ 205 The latest amendment reflected in this list is: Amendment 230
INDIAN POINT 3 TECHNICAL SPECIFICATIONS - APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 Section 3.7.16 Section 3.8.7 7 205 1 205 1 205 8 205 2 205 2 205 9 210 3 205 3 205 10 205 Section 3.7.17 Section 3.8.8 11 221
__ 205 I [205 12 205 Section 3.8.1 2 205 13 205 1 226 Section 3.8.9 14 205 2 205 1 205 15 205 3 205 2 205 16 205 4 205 Section 3.8.10 17 205 5 205 1 205 18 205 6 205 2 205 19 205 7 205 Section 3.9.1 20 205 8 205 I l 205 21 224 9 205 Section 3.9.2 22 224 10 205 1 205 23 224 Section 3.8.2 2 205 24 224 1 205 Section 3.9.3 25 224 2 205 1 215 26 205 3 205 21 215 27 205 4 205 3 215 28 205 Section 3.8.3 Section 3.9.4 29 205 1 205 1 205 30 206 2 205 2 205 31 225 3 205 Section 3.9.5 32 227 4 205 1 205 33 227 5 _ 205 2 205 34 225 Section 3.8.4 Section 3.9.6 35 225 1 1 216 1 l 205 36 205 2 1 216 Section 4.0 37 205 I32 3 1 216 1 l205 38 205 Section 3.8.5 2 205 1 205 3 205 fi ar- %
2 1 205 U~LIWI I iJ.u 1 205 Section 3.8.6 2 205 1 205 3 205 2 - 205 4 205 3 1 205 5 205 4 205 6 205 The latest amendment reflected in this list is: Amendment 230
Entergy Nuclear Operations, Inc
.ji -- Indian Point 3 Nuclear Power Plant License Amendments Page 13 AMENDMENT 1 SUBJECT LETTER DATE 217 Use of Best-Estimate Large-Break Loss of 05/06/2003 Coolant Accident analysis methodology (WCAP 12945) 218 Revise City Water surveillance to reflect 08/04/2003 addition of (backflow preventer) valves 219 Revise Ventilation Filter Testing Program 10/30/2003 to adopt ASTM D3803 charcoal filter testing requirements per GL 99-02.
220 Extension of the RCS pressure/temperature 12/03/2003 limits and corresponding OPS limits from 16.17 to 20 EFPY.
221 Extension of RCP flywheel inspection interval 07/02/2004 (from 10 years to 20 years) per TSTF 421.
222 Inoperable accumulator time extended from 08/18/2004 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per TSFT-370.
A./> 223 Extension of the allowed outage time to 01/19/2005 support the placement of the CRVS in an
- alternate configuration for tracer gas testing.
224 Full-scope adoption of alternate source term 03/22/2005 for dose consequence analysis of DBAs.
225 Stretch Power Uprate (4.85%) from 3067.4 MWt 03/24/2005 to 3216 MWt, and adoption of TSTF-339.
226 Adopt TSTF-359; Increased Flexibility in 04/06/2005 Mode Restraints.
227 Remove Monthly Operating Report and 04/14/2005 Occupational Radiation Exposure Report per TSTF-369.
228 Hydrogen Recombiner Elimination and Relaxation 04/14/2005 of Hydrogen Monitor Requirements per TSTF-447.
229 Inoperability of Snubbers per TSTF-372. 02/13/2006 230 Revise Emergency Core Cooling System Throttle 03/23/2006 Valve Surveillance Requirements.
ECCS - Operating 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.2 Verify that each ECCS manual, power operated, 31 days and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
SR 3.5.2.3 Verify each ECCS pump's developed head at the In accordance test flow point is greater than or equal to the with the required developed head. Inservice Testing Program SR 3.5.2.4 Verify each ECCS automatic valve in the flow 24 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.
SR 3.5.2.5 Verify each ECCS pump starts automatically on 24 months an actual or simulated actuation signal.
SR 3.5.2.6 Verify, for each ECCS throttle valve 24 months listed below, each position stop is in the correct position.
Valve Numbers SI-856B SI-856G SI-2165 SI-2170 SI-856C SI-856H SI-2166 SI-2171 SI-856D SI-856J SI-2168 SI-2172 SI-856E SI-856K SI-2169 (continued)
INDIAN POINT 3 3.5.2-3 Amendment 230