L-06-046, Responses to a Request for Additional Information in Support of License Amendment Request No. 202

From kanterella
(Redirected from ML060970122)
Jump to navigation Jump to search

Responses to a Request for Additional Information in Support of License Amendment Request No. 202
ML060970122
Person / Time
Site: Beaver Valley
Issue date: 03/31/2006
From: Lash J
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-06-046, LAR 202
Download: ML060970122 (27)


Text

FENOC FirstEnergy Nuclear Operating Company James H. Lash 724-682-5234 Site Vice President Fax: 724-643-8069 March 31, 2006 L-06-046 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 Responses to a Request for Additional Information (RAI dated March 2, 2006) in Support of License Amendment Request No. 202 On October 14, 2005, FirstEnergy Nuclear Operating Company (FENOC) submitted License Amendment Request (LAR) No. 202 by letter L-05-157, dated October 14, 2005.

This submittal proposed changes to permit implementation of station battery charger upgrades including installation of new battery chargers for Beaver Valley Power Station (BVPS) Unit No. 2.

By letter dated March 2, 2006, the U.S. Nuclear Regulatory Commission (NRC) issued a request for additional information pertaining to LAR No. 202. The enclosure to this letter contains the FENOC response to the March 2, 2006 request for additional information.

The request for additional information response forwarded with this letter has no impact on either the proposed Technical Specification changes or the no significant hazards consideration forwarded with LAR No. 202 letter L-05-157, dated October 14, 2005.

No new regulatory commitments are contained in this transmittal. If you have questions or require additional information, please contact Mr. Gregory A. Dunn, Manager -

Licensing, at 330-315-7243.

Beaver Valley Power Station, Unit No. 2 Response to NRC RAI Dated March 2, 2006 Station Battery Charger Upgrade L-06-046 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on March 31,2006.

Sincerely, es H. Lash

Enclosure:

Response to Request for Additional Information dated March 2, 2006 c:

Mr. T. G. Colburn, NRR Senior Project Manager Mr. P. C. Cataldo, NRC Senior Resident Inspector Mr. S. J. Collins, NRC Region I Administrator Mr. D. A. Allard, Director BRP/DEP Mr. L. E. Ryan (BRP/DEP)

L-06-046 ENCLOSURE Response to Request for Additional Information Beaver Valley Power Station, Unit No. 2 Station Battery Charger Upgrade By letter dated October 14, 2005 (Agencywide Documents Access and Management System Accession No. ML052920419), FirstEnergy Nuclear Operating Company requested an amendment to the BVPS-2 Technical Specifications (TSs). The proposed changes would revise TSs 3/4.8.2.3 and 3/4.8.2A to permit implementation of station battery charger upgrades, including installation of new battery chargers. The Nuclear Regulatory Commission (NRC) staff has determined that the information contained below is needed for the NRC staff to complete its review.

1. Provide assurance that any spare charger that could be credited by removing '2-7' from TS 3.8.2.3 ACTION b and the note in TS 3.8.2.4 would be equivalent to what is detailed in the BVPS-2 Updated Final Safety Analysis Report (UFSAR).

Response

FirstEnergy Nuclear Operating Company (FENOC) has planned to upgrade the BVPS Unit No. 2 Class IE Uninterruptible Power Supply (UPS) systems by systematic replacement of rectifiers, inverters and battery chargers.

The original SPARE battery charger, identified as 2-7, is a portable unit. When a spare charger is needed for any of the four Class lE 125-VDC busses, the unit is moved to the location, fastened to the floor, electrically connected to the bus via dedicated power outlets and placed into service.

The proposed change will eliminate the existing portable spare battery charger unit in favor of two spare charger units. Each of these units will be permanently mounted in their respective emergency bus rooms, eliminating the need to roll a spare charger between rooms and secure it prior to placing it into service.

The existing portable spare battery charger was fully capable of recharging the connected battery while simultaneously carrying the associated DC bus load on any of the Class IE 125-VDC busses.

Electrical Specifications for the existing portable SPARE battery charger unit are as follows:

Input Voltage 480 VAC (+/- 10%), 60 Hz (+/- 5%)

Nominal Float Voltage 120-138 Nominal Equalize Voltage 135-144 Rated Output Current 100 amps

Beaver Valley Power Station, Unit No. 2 L-06-046 Enclosure Page 2 Electrical Specifications of the replacement spare battery chargers are as follows:

Charger DC output Input Voltage 480 VAC (+ 10% / -15%), 60 Hz (+/- 5%)

Nominal Float Voltage 120-144 Nominal Equalize Voltage 140 (+/- 5%)

Rated Output Current 100 amps The electrical performance specifications of the replacement chargers meet the performance specifications of the existing portable SPARE battery charger 2-7.

Qualification of the replacement units to IEEE STD 323-1974 and IEEE STD 344-1975 will be documented by provision of prototype testing data and Certificate of Conformance by the equipment manufacturer. Electrical, environmental and seismic performance criteria have been provided to the manufacturer via engineering specification. These criteria are equivalent to those specified in the original engineering specification.

Any spare charger credited for performing the design function of the existing charger 2-7, would be procured in accordance with the replacement charger engineering specification.

The replacement charger engineering specification meets the requirements for the battery chargers as set forth in the BVPS Unit No. 2 Updated Final Safety Analysis Report (UFSAR).

2. The Institute of Electrical and Electronics Engineers (IEEE) Standard - 450 (1987-2002), "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications," states that degradation is indicated when the battery capacity drops more than 10% from its capacity on the previous performance test, or is below 90% of manufacturer's rating.

Provide assurance that the current definition for battery degradation being used at BVPS-2 provides an accurate indication of each battery's condition.

Response

The new battery chargers, installed as described in response to question 1 above, will operate the same as the existing battery chargers, (capable of recharging the connected battery while simultaneously carrying the associated DC bus load on any of the Class 1E 125-VDC busses).

The equalize and float voltage settings will not be changed. Changing out the chargers will have no effect on how battery degradation is measured. BVPS Unit No. 2 Technical Specification Surveillance 4.8.2.3.2.f states: "At least once per 18 months, during shutdown, performance discharge tests of the battery capacity shall be given to any battery that shows signs of degradation or has reached 85% of the service life expected for the application.

Degradation is indicated when the battery capacity drops more than 10% of rated capacity

Beaver Valley Power Station, Unit No. 2 L-06-046 Enclosure Page 3 from its average on previous performance tests, or is below 90% of the manufacturer's rating."

This surveillance meets the intent of IEEE-STD-450.

Note:

Although IEEE 450 recommends that the performance testing be performed on a yearly basis, an 18 month surveillance frequency has previously been discussed and approved by the NRC for BVPS Unit No. 1. Refer to the safety evaluation associated with Unit No. 1 License Amendment No. 54.* In that safety evaluation the NRC staff concluded: "Imposing the new requirement to conduct an annual performance discharge test on a battery that shows signs of degradation would require an unscheduled plant shutdown and unnecessarily restrict plant availability without a significant increase in plant safety." BVPS Unit No. 1 License Amendment No. 54 revised Technical Specification Surveillance 4.8.2.3.2.f to state: "At least once per 18 months, during shutdown, performance discharge tests of the battery capacity shall be given to any battery that shows signs of degradation or has reached 85% of the service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% of rated capacity from its average on previous performance tests, or is below 90% of the manufacturer's rating." The NRC subsequently approved the same wording for BVPS Unit No. 2 Technical Specification Surveillance 4.8.2.3.2.f with the issuance of NUREG 1259 in May of 1987.

Reference letter from Peter Tam, NRC Project Manager to Mr. J. J. Carey, Vice President Duquesne Light Company, dated July 27, 1982, forwarding License Amendment No. 54 to Facility Operating License No. DPR-66 for Beaver Valley Power Station, Unit No. 1.

3. Provide assurance that the BVPS-2 UFSAR will reflect the proposed design change.

Response

The Updated Final Safety Analysis Report (UFSAR) will be updated as required by 10 CFR 50.71(e) to reflect the station battery charger upgrade. As part of the FirstEnergy Nuclear Operating Company (FENOC) Engineering Changes process, a Licensing Document Change Notice has been prepared which details the Beaver Valley Power Station Unit No. 2 UFSAR changes that will be made.

A preliminary copy of UFSAR pages marked to show changes has been provided for information as Attachment 1.

Beaver Valley Power Station, Unit No. 2 L-06-046 Enclosure Page 4

4. Provide an updated electrical one-line diagram that shows the proposed design configuration.

Response: includes Figure 8.3-14, "Class IE 125-VDC Distribution System." This figure provides the requested one-line diagram showing the proposed design configuration. Changes are shown within revision clouds.

5. How will you prevent the rectifier assemblies from providing direct current input to the respective 125 Volt direct current bus?

Response

Refer to the preliminary updated BVPS Unit No. 2 UFSAR Figures 8.3-3 and 8.3-14, provided for information in the attachment to letter L-06-046, and note the location of the "Blocking Diodes."

The existing UPS units for Vital Busses 2-1 (Red) and 2-2 (White) contain a rectifier, an inverter and a blocking diode. This figure revision which adds the blocking diodes to Busses 2-1 and 2-2 does not reflect a physical plant change, or a change associated with License Amendment Request No. 202. The addition of the blocking diodes to busses 2-1 and 2-2 are intended as an editorial change to reflect the existing equipment configuration.

The function of the blocking diode is to prevent the UPS rectifier output from providing direct current input to the respective 125 Volt DC Bus. DC bus voltage is set slightly lower, upstream of the blocking diode, to prevent the DC bus from providing power to the Vital Bus loads during normal system operation. Upon loss of sufficient rectifier output, the DC bus will provide power to the associated Vital Bus loads, via the battery charger output if available or ultimately from the batteries.

As part of the planned upgrade of the Class 1E UPS systems, new replacement UPS units will be installed at the same time as the addition of new battery chargers for DC Busses 2-3 (Blue) and 2-4 (Yellow). Components within these new UPS units will perform the same design function as in the existing UPS units for DC busses 2-1 and 2-2.

In the new system configuration, the UPS rectifier will feed its respective Vital Bus loads via its UPS inverter. The blocking diode within the new UPS unit will prevent the UPS rectifier output from providing direct current input to the respective 125 Volt DC Bus.

ATTACHMENT 1 TO L-06-046 ENCLOSURE Updated Final Safety Analysis Report Changes for Station Battery Charger Upgrade

BVPS-2 UFSAR Rev. 10 7.6 ALL OTHER SYSTEMS REQUIRED FOR SAFETY 7.6.1 Instrumentation and Control Power Supply System 7.6.1.1 Description The following is a description of the instrumentation and control power supply system:

1.

Figure 7.6-1 gives a

single line diagram of the instrumentation and control power supply system.

2. There are four inverters and their associated distribution panels.

Each inverter is connected independently to one or more distribution panels.

3. The inverters provide a source of 118 V 60 Hz power for the operation of the nuclear steam supply system instrumentation.

This power is derived from the 480 V ac, three-phase, 60 Hz distribution system (preferred power supply), or the station batteries, which assure continued operation of instrumentation systems in the event of a station blackout.

4. Each of the four sets of distribution panels may be connected to a backup source of 120 V ac power.

The tie is through a l local electrically-operated manual bypass switch, which is mechanically interlocked with the breaker connecting the inverter to the distribution panel such that the distribution panels cannot be connected to both sources simultaneously.

7.6.1.2 Analysis There are two independent 490 V ac power sources, each serving two inverters.

Loss of either 480 V ac power source affects only two of the four inverters.

There are four independent batteries. ( iw-of the batteries are supplied with independent battery chargers.

The Waffiminifty -be-Since not more than two inverters are connected to the same bus, a loss of a single bus can only affect two of the four inverters.

Each inverter is independently connected to its respective vital bus distribution panels so that loss of an inverter cannot affect more than one of the four sets of vital bus distribution panels.

BVPS-2 UFSAR Rev. 12 pigtails, and terminal cabinets, located inboard of the containment.

Nuclear instrumentation system (NIS) triaxial penetrations are similar to the ones mentioned previously; however, they will have connectors in place of terminal cabinets, with pull boxes inboard and outboard of the containment.

Two NIS triaxial penetrations, 2RCP*21E (white) and 2RCP*06B (blue),

deviate from the spatial separation requirements of item 5C above.

The separation in 4'-0" between the respective train and channel.

This arrangement precludes NIS noise interference

concerns, and is acceptable based on the availability of a

separate safety-related nuclear instrumentation system.

The 5 kV cable penetrations are of the bushing type with suitable connectors.

6.

Fire Stops and Seals Fire stops and seals are detailed in Section 8.3.3.3.

7.

Cable All Class 1E cable is type-tested in accordance with IEEE Standard 383-1974 to ensure its ability to perform its required function for all normal and accident environments.

Power cables are sized in accordance with Power Cable Ampacities, published by the Insulated Power Cable Engineering Association (IPCEA),

or manufacturers data.

Cable sizes for safety-related motors are based on 125 percent of full load, 900C conductor temperature, and 40C ambient temperature for cable installation one layer deep with maintained horizontal spacing (refer to Table 8.3-4).

Cable trays have a depth of 4 in.

Cable tray fill for K cables is limited to 50 percent of the available cross-sectional area of a 3-inch deep cable tray for randomly filled trays (Table 8.3-4) and is derated accordingly.

In actual practice, the cables in randomly filled trays are not as tightly packed as assumed in IPCEA P-54-440, Ampacities in Open-Top Cable Trays, and the calculated cable derating is conservative.

8.3.1.1.17 120 V AC Vital Bus Uninterruptible Power Supply System There are four independent Class lE vital bus Dower supplies constituting the 120 V ac vital bus UPS.

Each bus S J des 120 V ac instrumentation and control power for the ESF prote (.

channels, and is uniquely identified by the assigned colors rgwhite, blue, or yellow corresponding respectively to vital bu

\\\\U*S*VITBS2-1, 2-2,

,_Aand 2-4. _Each vital-bus UPS consists of

'inverter, rectifier

VITAL BAS uPS uers5 V-1 A *Z.Z faotee 2O6VA ourr Krd 6C1.

VITAL god5 UPS vOJrs 42-3 4

  • Z-q fvivDoF #SkM evrA6,r At0 o.6 Foem rw?.

BVPS-2 UPSAR Rev. 0 Ea al bus (*2-1. *2-2, *2-3, *2-4) is capable of providing 120 V ac 2.4 V, single-phase, 60 HZ +/-.03 Hz, 20 kla at 0.U power factor at the output of the inverter unit.

Each bus normally receives power from the rectifier units via an emergency 480 V MCC.

The rectifiers convert 480 V ac to 125 V dc and supply it to the inverter input.

The interconnection with an emergency 480 V MCC provides the vital buses with the capability of an offaite (preferred) power source or an on-site (emergency) power source.

This satisfies NUREG-0737 (USNRC 1980), Item II.G.l, Position 4, with regard to pressurizer level indicators which are supplied from the vital instrument buses.

The inverter shapes the output voltage waveform to 120 V ac, single-phase, 60 hertz by means of internally-triggered silicon control rectifiers.

In the event that the rectifier source is lost, the inverter will receive 125 V dc directly from the 125 V dc battery input.

Each system is designed such that the battery will not supply current to the UPS while ac power (rectifier input) is available and within specified limits.

In the event that both the rectifier and battery sources are unavailable or the inverter malfunctions, the systems load is transferred within 1/4 cycle to the 480-120 V alternate source line voltage regulator by means of the static switch.

The alternate source is regulated at 120 V +/- 3.6 V.

The BVPS-2 operator also has the option, by means of the manual bypass switch, of manually overriding the automatic transfer feature to allow for manual transfer.

The automatic transfer permissives, however, can not be manually defeated.

V ital b es t2 -3 ( lue) and *I 4.(yellow) eaoctd with Class 1 Wbatte es *2-3

  • 2-4, r pectively.

e dc loads o these systems are Limited bgesign Woonly blqadyellow 1ene 125 V dc l circis 6

this pfson, the rJjiirchargi~

in addition to t lng he prmary soyfeo cptrt h

invokrasmle a8 A sprve a ttery c gers for t batteries.

t i

Vita es *2-C red (whiteE r agive their de o from C14s 1E batte es *2-1 au 22, repqlely, via dce tchboards.

S~vral non ftal bus Cls 1 dc loa ~not in thi isem are al o foered fad thes two fources; conse

~ently, batte i 2-1 nd X<

/

re pr o

de w

it 6

srte batte r

c hrgers.

B l

gkn dioev~v been add to

'he Afnput circuit of inverters t-1 and *2-2/ thu prevetn back-iel ling from rectiirs 2-1 and R(,and the wc ifier as wilies fro3m rOviding dc nu to the In ctive ba ery bus.

{Ronon-Class t

c systems aleprovided f rte non-s feS dc loads,

/

iscussed

' Section. 8.3 <)

A spare g

le battery cre is as vilable to Dvd agn current i

he Class 1E K

teis d

rn'hrger maineofi/

There are four Class lE isolating voltage regulating transformers allocated to the four vital bus systems.

They serve to isolate certain designated non-Class IE loads from the Class lE portion of the system (red, blue, yellow, white).

These isolating regulators are identified as follows:

'A

Vital buses *2-1 (red) and *2-2 (white) receive their dc inputs from Class IE batteries *2-1 and

  • 2-2, respectively, via dc switchboards *2-1 (orange) and *2-2 (purple), respectively. The dc switchboards exist on these two busses since there are several Class IE dc loads which are not associated directly with the vital bus system. These non-vital bus loads ae also supplied via the dc switchboards.

Vital busses *2-3 (blue) and *24 (yellow) receive their dc inputs directly from Class IE batteries

  • 2-3 and *24. The dc loads on these buses arc limited by design to only blue and yellow channel 125 V dc circuits therefore, no dc switchboards exist on these buses.

Each of the four vital busses are provided with separate battery chargers. Blocking diodes have been provided at the input circuits of the inverters for each of the four buses. These blocking diodes prevent inverter rectifier output from back-feeding dc input to their respective battery bus.

This ensures that each inverter rectifier output feeds only its intended Class IE vital bus load.

Upon loss of ac input to a rectifier, the diode allows for the battery power to carry the affected vital bus load.

Spare battery chargers are also available to provide to provide charging current to the Class IE batteries during charger maintenance or in the event that a Class IE battery charger fails. These spare chargers and their associated connecting receptacles are qualified for Class IE use.

(mark-up to BV2 UFSAR pages 8.3-S0 and 8.3-50a - LDCN No. 205-021)

-ac

BVPS-2 UFSAR Rev. 14 Periodic testing is performed on a regularly scheduled basis to demonstrate the operability and continuity of all Class lE systems and components.

Testing of the onsite Class 1E emergency diesel generator units, which will be in accordance with Regulatory Guide 1.108, is addressed in Section 8.3.1.1.15.

All periodic testing and inspection will be performed with full integrity and availability of the entire Class 1E power systems in conformance with the bypassed or deliberately inoperable status requirements of Regulatory Guide 1.47.

Periodic testing and maintenance will be performed for all Class 1E protection systems in conformance with the requirements of Regulatory Guide 1.115.

Compliance with Regulatory Guide 1.6 The design of the onsite electrical safety-related (Class lE) power systems is in compliance with Regulatory Guide 1.6.

The Class 1E loads for all BVPS-2 voltage levels, that is, 4,160 V ac, 480 V ac, 120 V ac, and 125 V dc, are separated into redundant and completely independent load groups.

Manual and automatic interconnections between buses and

loads, interconnections between safety-related (Class 1E) and nonsafety-related (non-Class lE)
buses, automatic loading and stripping of buses, and independence of redundant systems are fully described in Sections 8.3.1.1.4, 8.3.1.1.5, 8.3.1.1.8, and 8.3.1.4, respectively.

The 12 lass 1E system includes four battery and battery chargetagdekf~es combinations, with redundant dc load groups specifically assigned to each dc bus without automatic connection to any other load group.

Each of the two emergency diesel generator units (Section 8.3.1.1.15) is completely redundant, physically and electrically separated relative to the other, and is connected exclusively to its designated 4,160 V ac Class 1E bus.

This design ensures complete independence for the onsite emergency power sources.

Compliance with Regulatory Guide 1.9 Diesel-generator units used as onsite electric power systems at BVPS-2 have been selected, designed, and qualified following the guidance of this Regulatory Guide with the following clarifications:

The Class lE diesel generators have been procured in compliance with IEEE Standard 367-1977 with the following clarif cations:

1. Section 4.1(8):

The BVPS-2 Class LE die f ire qualified utilizing the mild environment concept a ed by 10 CFR 50.49(c).

2. Section 4.1(12):

The BVPS-2 Class Alp Mels are seismically qualified in accordance with IEEE p9^f d 344-1971.

CipS iIAT85SZ-I iWO UpS,4WSZ652-'

FAx4. IIi"dO 1)WQ ZoWR VA oher Rzainj.

0Ps4Vftf6S2-3 A-47 T65. -Y LL ds ITRI)

TNEa ist (vA vOtTx RorgJA BVPS-2 UFSAR Rev. 12 features of the vital bus inverters and the alternate regulating transformer supply.

Further analysis on the separation provisions for independence of equipment,

cables, and raceways is found in Section B>z 83.14.4 Determination of the capacity requirements of the 125 V dc Class IE battery systems includes a power requirement in the 2-hour duty cycle representing the required supply to the vital bus inverters.

The inverter output requirements for UPS*VITES2-l, UPS*VITBSS 2

  • VITBS2-

,and 1PS*VITBS2-4 have been verified by calculation.ai Furthermore, suffic en ca x

supy a

ure

increase, if required, for each of the vital buses.

The alternate supply transformers are sized accordingly at 20 kVA output.

The other system regulating transformers, serving non-Class lE loads, are specified with capacities of 10.0 kVA.

The total connected non-Class 1E loads do not exceed 5.5 kMA.

Also, cables are sized to correspond to the distribution breaker rating and allowable voltage drop limit.

This assures sufficient voltage at the load.

In general, voltage drop in the cable (from the distribution panel to the load) is confined to 1 percent.

Final routing of cables (from distribution panels to the load) is controlled by a computer program.

Routing includes circuit assignment to cable tray, conduit, junction boxes, etc. and does not allow, by program design, the sharing of a raceway with non-Class IE cables or redundant color coded cables.

Circuit routings have been sampled and verified for conformance with regard to the prescriptive implementation of separation requirements.

Redundant components, cables, and raceways are uniquely identified by a mark number which includes a distinguishing color code.

The color code is visually apparent as well.

Ventilation systems supporting the UPS equipment and circuits (Sections 9.4.1, 9.4.3, and 9.4.10) maintain temperature conditions between 55OF and 104F, a range cited and integrated into the design requirements of relevant equipment performance specifications.

Any single failure in a ventilation system will not preclude the system's function.

It is 100 percent redundant and satisfies independence criteria.

The buildings and structures housing the UPS (service building, control building, cable tunnels, safeguards area, auxiliary building, fuel building, and cable vault) are Seismic Category I designed structures, and provide a controlled environment for the UPS equipment. to which the latter is qualified.

This environment is fully described in Chapter 3.

The vital bus system load assignments and prov I

s for future connected loads are tabulated as part of a cal cua^t to determine the sizing of the vital bus system.

Correct f M oad assignments (proper correspondence between the safety load and its designated vital bus source) have been confi izing this table.

8.2

BVPS-2 UFSAR Rev. 0 Pre-operational and initial system testing will be specified in accordance with Regulatory Guides 1.41 and 1.68, and GDC 1.

In addition, periodic onsite testing programs permit integral testing when the station is in operation, in accordance with Regulatory Guides 1.22 and 1.47.

The test program capabilities satisfy the requirements of GDC 18 and 21.

Any one of the vital bus inverters can be removed for testing without diminishing the system's ability to perform its safety functions.

Also anybatty charger can be removed for maintenance and replaced by h

spare charger.

The alternate source regulating transformers can beB 4olated for testing without limiting the capability of the UPS.

a The following instrumentation and monitoring devices provide system surveillance capability:

an output voltmeter,

ammeter, and a

frequency meter for each inverter (detect inverter trouble),

an elapsed time meter to indicate total operating time of the inverter (facilitate performance of scheduled maintenance); alarms for abnormal conditions including inverter low output voltage, low output current, and loss of cooling air to the inverter (provide system information to main control room operator): undervoltage and overvoltage alarms on each vital bus and voltage transducers on each distribution panel (provide continuous vital bus voltage indication and monitoring to the main control room operation).

The UPS equipment and cable are qualified to the most severe credible hostile environment in the equipment's location, including seismic conditions, radiation, thermal excursions, pressure, and temperature conditions, all assumed to occur at the end of the component's design life.

Components are qualified to function for the required duration of the design basis conditions.

The active UPS electrical equipment is located in the service building, a structure which protects the equipment and limits its exposure to moderate accident levels of radiation, temperature, and humidity.

8.3.1.2.3 Class 1E Equipment in a Hostile Environment Class lE equipment in a hostile environment is discussed in Section 3.11.

8.3.1.3 Physical Identification of Safety-Related Equipment The identification scheme for the onsite safety-related (Class 1E) power system equipment, for cable/raceway equipment, and for terminal equipment is designed to ensure.

1. Marking permanence,

BVPS-2 UFSAR Rev. 12 8.3.2 DC Power Systems e.3.2.1 Description B.3.2.1.1 Class lE DC Power System The Class lE dc power system includes 125 V dc power supplies, distribution equipment, and load groups arranged to provide dc power to the safety class dc loads as depicted on Figure 8.3-14.

This system is divided into four independent subsystems and two redundant trains with regard to power sources and corresponding distribution equipment.

These four subsystems are designated with the following principal equipment as follows:

Class *lE battery 2-1 (orange),

battery charger 2-1 (orange),

and distribution switchboard 2-1 (orange); Class lE battery 2-2 (purple), battery charger 2-2 (purple) and distribution ehbod 2-2 (purple); Class IE battery 2-3 (blue), vital busL 43:jhrger 2-3 (blue) and distribution panel 2-c 4assue);

battery 2-4 (yellow),

vital bus 4Z-c charger 2-4 (yellow) and distribution panel 2-20 (yellow).

'A

BVPS-2 UFSAR Rev. 12 Class lE batteries 2-1 and 2-2 are connected to Class 1E 480 V MCCs via their respective battery chargers.

These 480 V feeds maintain the batteries fully charged, and can also carry the redundant and independent 125 V dc load groups, which are supplied from these sources via distribution switchboards 2-1 and 2-2.

Included in these loads groups are the vital bus inverters, namely 2-1 (output red) and 2-2 (output white).

Class 1E batteries 2 invez-are conne-ted bu and 2-4 V MC(oup Yi' their resp e ctive rgers, 1

drive t~~vtl bs ivres 23 (uptbu) and 2-4 (output yellow).

so b yAA' fs f/ZsEZW g

E

D

-'< DCtDX Enfe Dot Cg~> 4f OWO

7ASRc isFZ

^

K g

o l I AgD r i

J/

OK-JI 7a~PA)Z 419 2.)~

h ds ~Jdi

,4AAW 4V BVPS-2 UFSAR Rev. 15 Connection of battery chargers assigned to redundant subsystems to the same safety train does not der eciate subsystem independence.

The battery chargers are specified to isolate the effects of an electrical erturbation due to an abnormality in a subs v

F streGY-Xt MZ-Vf Ya X~tteMVazdcan be connected to a permanent, enclose-safety switch with interlocked receptacle.

One safety switch is provided for each battery to provide a backup method for battery charging and bus supply if the primary charger is out of service.

These features demonstrate that safety grade equipment is utilized in accomplishing the interconnection of the Class lE 125 V dc system and the emergency

buses, satisfying NUREG-0737, (USNRC 1980).

Item II.E.3.1, Position 4, for control power for pressurizer heaters.

Each of the two redundant 125 V dc Class lE buses switchgear 2-1 and switchgear 2-2 supply Class IE loads for the following safety class items:

1.

Reactor protection system,

2.

Engineered safety features actuation system,

3.

Class XE 120 V ac vital bus inverters,

4.

Class lE 4,160 V and 480 V ac switchgear controls,

5.

Emergency diesel generator field flashing.

Each 125 V dc bus voltage level is continuously monitored and displayed in the main control room.

Alarms in the control room give warning in the event of low voltage, charger failure, battery breaker overcurrent trip, and supply breaker trips to 125 V dc uwitchgear and distribution panels.

All electrical equipment connected to the Class LE 125 V dc system is capable of operating over the 125 V dc system voltage range.

The 125 V dc system operates ungrounded.

Each dc bus is provided with a voltmeter which will indicate a grounded condition on either the positive or negative bus.

The grounded dc bus condition is also annunciated in the main control room.

The most probable mode of battery failure, a single cell deterioration, is indicated well in advance by the routine tests regularly performed on the unit batteries.

Batteries 2-1 and 2-2 are connected to their respective buses via circuit breakers.

Distribution breakers feeding bus loads are coordinated for circuit protection.

Circuit breakers are provided for each battery, with only longtime and shorttime trip attl hments.

The independence of the redundant dc systems 4

ES lemented by analyzing the system for all identifiable sourc s\\2'* coupling, and either by physically separating or mechani a

protecting and electrically isolating them from their r NI-ant counterparts, preventing the occurrence of nonrandom failur he system.

BVPS-2 UFSAR Rev. 15 8.3.2.1.2 Non-Class 1E DC Power System The non-Class IE de power system includes 125 V dc power supplies, distribution systems, and load groups arranged to provide dc power to the dc loads as depicted on Figure 8.3-15.

This 125 V dc system comprises two 125 V dc, 120 cell lead-calcium type batteries (battery 2-S and battery 2-6), each connected to its 125 V dc bus (switchgears 2-S and 2-6) and battery charger (battery chargers 2-5 and 2-6).

Battery 2-5 and battery 2-6 are each comprised of two strings of 60 cells in parallel, for a total of 120 cells for each battery set.

Under normal conditions, 480 V MCCs (non-Class IE) will supply power to each 125 V

de battery via a battery charger.

Essential 120 V ac buses 2-S and 2-6 are supplied from the essential bus inverters 2-5 and 2-6.

The inverters are supplied from the non-Class lE dc buses, switchgear 2-5 and 2-6, or from the 480 V ac switchgear 2-5 via rectifiers.

There is no interaction,

sharing, or interface between the non-Class 2E and Class IE dc systems, their equipment,
raceways, loads, and support systems.

9.3.2.1.3 DC Power System Arrangement and Sizing The arrangement of the Class IE dc system equipment provides for four individual rooms for the four Class lE batteries, nly separate areas for the corresponding battery chargers, dF5Zaryc a

r static switches, circuit breakers, dc switchboards, and vital bus inverters.

The latter are arranged in corresponding sets all located on el 730 ft-6 in of the service building (Figure 5.3-13).

Since variations in electrolyte temperature of more than 2.68C between cells may cause the warmer cells to become unequal in output, proper battery location, ventilation, and cell configuration are provided to keep this variation within the preceding limits, thus minimizing deterioration of the positive plates and prolonging battery life.

The battery rooms are ventilated to prevent accumulation of hydrogen.

The battery room ventilation system (Section 9.4.10.2) provides a minimum of 16 air changes per hour, which assures that hydrogen accumulation is limited to less than 2 percent of the total volume of each battery room.

Each dc subsystem has a charging component which is sized to supply all normal continuous loads and to simultaneously recharge the battery, after the design 2-hour duty cycle discharge, to the fully charged condition in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The maximum equalizing voltage setting ensures that equipment connected to the batteries is not subjected to voltages greater than it was qualified for.

The Class IE batteries have the ability to supply normal loads for a minimum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The battery and battery charging system then perform any necessary switching operations without hep\\

aro any other source.

The capacity of each Class IE batte ry.k>b the charger inoperable is large enough to cope with DBA condit fJiZ Each battery system is sized in conformance with the princi p N>bet out in IEEE Standard 308-1974.

The battery capacities fok_9i.eries 2-1 and 2-2 are 1,700 ampere hours (Ah) each.

The capat~

for batteries 2-3 and 2-4 are 1,140 Ah each.

These capacities 4'ufficient to operate all connected dc loads under DBA condition M

minimum of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

8.3-74

BVPS -2 UFSAR Rev. 15 An electrical calculation program is in place to monitor battery load additions and deletions and to periodically update the battery calculations.

A new battery duty cycle shall be calculated for each load addition unless the loads being added are encompassed by the design margin calculation.

This program ensures the capacity of the batteries continues to be adequate to power the prescribed loads.

The Class IE batteries are lead-calcium type, consisting of 60 cells, each with a recommended float voltage of 2.25 V per cell.

Battery cells are of the sealed type, having covers fixed in place with a permanent leakproof seal.

Cell covers have vent and filler openings with vent plugs of the explosion-resistant type.

Cell posts and all connectors have adequate capacities to prevent excessive losses and overheating.

Jumpering cells out of the battery sets may be allowed provided an engineering evaluation or calculation is performed to show that the battery still would have the capacity for the two hour duty cycle and maintain the required minimum voltage at load.

Batteries will be mounted on all-steel battery racks.

These racks are provided with corrosion protection and are seismically designed, with restricting members to prevent cell motion.

Design features include minimizing temperature differential between battery cells and cell accessibility for ease of inspection and maintenance.

Battery chargers a

convert ac power into regulated dc outp andare usid to float and charge the batteries connected to them.

Output voltage is regulated within

+/-1.o percent of set point from no load to full load operation.

Each battery charger has a nominal output of 130 V dc with an input of, V ac three-phase.

The charger includes an input circuit breaker, an input transformer, power rectifier units, a voltage regulator, a

current limiter, filters, and an output circuit breaker.

The output circuit includes component as required to prevent damage to the charger from voltage transients originating in the dc distribution system.

The output circuit breaker provides protection of the battery and the charger against internal charger faults and also serves as a manual disconnecting device.

A circuit breaker in the input circuit provides protection for internal charger faults and can also be used as a manual disconnecting device.

The charger is automatically current limiting.

Its design is such that it can tolerate overloads, including a sustained short circuit at the output terminals, without damage to the components.

The charger is designed to operate without the battery connected.

The battery charger output is filtered to control the amplitude of ripple voltage.

6.3.2.1.4 DC Power System Distribution Each battery distribution panel includes a low Age dc power circuit breaker connecting the battery to the bus, case circuit breakers or fuses feeding the do

loads, coon ted overcurrent protection, instrumentation for over protection, instrumentation for system monitoring, and groi j ection equipment.

Buses are sized to carry rated full load cut*b continuously with a maximum temperature rise of SOC. The bus e braced to withstand mechanical forces of short circuit curren 1 to or greater than the smallest interrupting current rati circuit breakers.

8 S

BVPS-2 UFSAR Rev.

0 Emergency Power System The emergency power system is an independent, automatic starting power source which supplies power to vital station auxiliaries if a normal power source is not available.

The following is a discussion of the independence between redundant emergency power sources and between their distribution systems.

1. The electrical power loads for emergency safety features are separated into redundant load groups fed from separate buses such that loss of one group will not prevent operation of minimum safety functions.
2.

The redundant power loads are each connected to buses which may have power fed from an offsite power source or an emergency power source (that is, an emer en diesel generator unit).

3.

Two 125 V dc systems, each ete th batteries, chargers, switchgear, and di t4ifution equipment, are provided for ESF equipment. These systems are not tied together.

In addition, kwo channel dedicated batteries are provided to supplj 125 V dc to t ovi al bus inverters.

4. A standby source of power for a

ad cannot be automatically paralleled with the standby source of power for the other redundant load.

5. Each redundant ac ESF load is supplied with power from a separate emergency diesel generator unit.

A color coding system is used to identify channel cables and to ensure that redundant instrument channels associated with the solid state protection systems are isolated from each other.

Channels I, 1I, III, and IV are color-coded red, white, blue, and yellow, respectively.

This channel identity need only be maintained until some channel terminating device is used.

The device may be a qualified isolating transformer or an electromagnetic relay.

Channel codings are generally applied to inputs from primary and secondary process

systems, which are ultimately fed to the solid state protection systems.

Redundant sources of power for primary process and ESF, protective equipment, and associated controls are identified as A and B, with orange and purple color coding, respectively.

Where circuits may be supplied from either the A or B souS, they are designated by C and color-coded green.

Ft AC Emergency Power System The ac emergency system includes power sup a distribution system, and load groups arranged to prov ower to Class lE loads.

9.5A-15

ELM D

E T;

F I-zk 4-

NUCLEAR SAFE FFNX AA 3

4 1 --------

6 7

UPS-VMTBS2-3 IINVERTER/

IREClinER I

I I

I I

I I

REGULATOR I

I 480V, lPH I I

120Vl PHI I

I I

I I

I

'ANO FENOC Beaver Valey Power Station INTERIM DRAWING CHANGE NOTICE Sheet 1 of 1 IDCN Rev. 0 OS Affected Drawig RE-IAW Unit 2 Re,. 19 Engineerig Change: ECP 02-0376 B. PWI R. C. Lubert C. V. Mancuso hiPlementataion Document No.: 03 Prpe

.DC No

__EOOA 37-3MngrDt Preparr (Print name and sign and date)

MCNNo. 2-RE OO0lAW-E02-0376-03

UPS-VITBS2-4 INVERTER/

IRECTIFIER I

I 0-If B1

) DC-INPUT B401

) AC-INPUT

) B402 REGULATOR I

I 480V, 1PH -

120V, 1PH I

I I

I V

1 1

I I

I I

I I

I I

I I

I I

I I

STATIC SWITCH MANUAL BY-PASS FENOC Beaver Valley Power Station INTERIM DRAWING CHANGE NOTICE Sheet l of I I DCN Rev. 1 Affected Drawing: RB-lAW IUnit 2 l Rev. 19 Engincering Change: ECP 02-0376 linplementation Docmnent No.: 04 IDCN No. 2-RE-OOO1AW-E02-0376-04

ram O

>1-6GePM X 0"O I-N IL u 14 IL I-ILi WUS z

C o

t I

Vai oer Station M DRAWING CHANGE NOTICE S

.DCN Rev.O Vectd Drawingg: RE-lAW Unit 2 Rev. 19 Engineering Cthangc: ECP 05-0059

[mplemcnatsion Document No.: 03 IDCN No. 2-RE-OOO1AW-E05-0059-03 R. C. Lubert M. A. Manoleras

rt -

ve VFENOC Valley Power Station RIM DRAWING CHANGE NOTICE Sh of I

[1DCN Rev.O

'AknctedDramwing: R-LAAW Unit 2 Rev. 19 Engineering Change: ECP 05-0059 mnplementation Docment No.: 04 2-RE-0001AW-E05-0059-04 (fv R. C. Lubeft

DRAFT, LEGENID (0) CLASS IE ORANGE TRAIN (P) CLASS IE PURPLE TRAIN (N) NON CLASS IE RECTIFIER CHARGER INVERTE 2

SPARE CHARGER CONNECTION

  1. REGULATING TRANSFORMER ACC (P)

GURE 8.3-14 CLASS 1E 125 VDC DISTRIBUTION SYSTEM BEAVER VALLEY POWER STATION - UNIT 2 FNAL SAFETY ANALYSIS REPORT T