ML060960650

From kanterella
Jump to navigation Jump to search
Meeting with Entergy Operations, Inc. to Present the NRC Assessment of Arkansas Nuclear One'S Safety Performance and to Describe Other NRC Focus Areas for the Period of January 1 Through December 31, 2005
ML060960650
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/06/2006
From: Guerra G
NRC Region 4
To:
References
Download: ML060960650 (3)


Text

April 6, 2006

SUBJECT:

MEETING WITH ENTERGY OPERATIONS, INC.

FACILITY: Arkansas Nuclear One DOCKETS: 50-313; 50-368 DATE & TIME: April 20, 2006 6:00 p.m. (CDT)

LOCATION:

PURPOSE: End-of-cycle public meeting to present the NRC assessment of Arkansas Nuclear Ones safety performance and to describe other NRC focus areas for the period January 1 through December 31, 2005 CATEGORY 1: The public is invited to observe this meeting and will have the opportunity to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: NRC A. Vegel, Deputy Director, Division of Reactor Projects (DRP)

D. Graves, Chief, Project Branch E, DRP R. Deese, Senior Resident Inspector, Project Branch E, DRP J. Dixon, Resident Inspector, Project Branch E, DRP E. Crowe, Resident Inspector, Project Branch E, DRP

Entergy Operations, Inc. LICENSEE Timothy Mitchell, Acting Vice President, Operations Joe Kowalewski, Director, Engineering Thomas Marlowe, Director, Nuclear Safety Assurance Dale James, Licensing Manager MEETING CONTACT: Gilbert Guerra, NRC, RIV 817 276-6557 glg@nrc.gov cc: James Mallay Senior Vice President Director, Regulatory Affairs

& Chief Operating Officer Framatome ANP Entergy Operations, Inc. 3815 Old Forest Road P.O. Box 31995 Lynchburg, VA 24501 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 County Judge of Pope County Pope County Courthouse 100 West Main Street Russellville, AR 72801 Winston & Strawn LLP 1700 K Street, N.W.

Washington, DC 20006-3817 Bernard Bevill Radiation Control Team Leader Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, AR 72205-3867

Entergy Operations, Inc. E-Mail To:

( ) NRC Attendees PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE EJB1 E. Benner TEB T. Bloomer, RIV EDO Coordinator DGH1 D. Holland, Project Manager, NRR RWD R. Deese, Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES CJG, JAK RA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB DRS Secretaries CMS, AMT, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM Ann Mattila, Security Advisor SUNSI Review Completed: _DNG ____ ADAMS: / Yes G No Initials: __ DNG____

/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive R:\_ANO\2006\ANO 4-20-06MN-EOC.wpd ML RIV:SPE:DRP/E PAO RSLO C:DRP/E GLGuerra VLDricks WAMaier DNGraves

/RA/ CGordon for /RA/ /RA/

4/5/06 4/5/06 4/5/06 4/6/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax