|
---|
Category:- No Document Type Applies
MONTHYEARML22207A0222022-07-22022 July 2022 NRC-2022-000105 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML20037B0902020-02-0404 February 2020 FAQ 20-01_NMP1 9-6-17 Unplanned Scram FAQ with Attachment 1-15-20_20200116 ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 ML18018B2672018-01-18018 January 2018 First Interval Inspection Relief Request Summary ML18018A9902018-01-0808 January 2018 System (Psys) Vs. Component (Comp) for Steps Preceeding Loss of Rod Position Indication (387 Lers) ML20170A6382017-09-0606 September 2017 FAQ 20-01: Nine Mile Point Scram Tentatively Approved ML20108E9142017-09-0606 September 2017 FAQ 20-01: Nine Mile Point Scram Proposed NRC Response ML17033B0242017-02-0202 February 2017 Qualifications P. Allister Burt General Superintendent - Nuclear Generation Niagara Mohawk Power Corporation ML17033B4532017-02-0202 February 2017 Professional Qualifications Dennis Rathbun U.S. Atomic Energy Commission ML17033B4372017-02-0202 February 2017 Professional Qualifications of Barton M. Hoglund ML17033B0212017-02-0202 February 2017 Qualifications of Robert Nilsen Senior Power Engineer Nine Mile Point Nuclear Station, Unit 2 Stone and Webster Engineering Corporation ML17033B0182017-02-0202 February 2017 Professional Qualifications Jan A. Norris Directorate of Licensing U.S. Atomic Energy Commission ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML15132A1092015-04-28028 April 2015 4/28/15 - Nine Mile Point Public Meeting Sign-In Sheet ML14260A1972015-03-31031 March 2015 SECY-15-0046: Enclosure 8 - Request Approval Staff Recommendation Authorize Indian Point Nuclear Generating; James A. Fitzpatrick Nuclear Power Plant; Nine Mile Point Nuclear Station; R.E. Ginna Nuclear Power Plant-Use Section 161a Preempti ML14255A3062015-01-16016 January 2015 Consent and Waiver Concerning Pre-emption Confirmatory Order ML14351A4282014-12-11011 December 2014 Updated TIP Comparisons for Current Operating Conditions, GE-PPO- 1GYEF-KG1-742, Enclosure 2 ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13340A0882013-12-0606 December 2013 Regulatory Conference/Public Meeting on 11/1/13 -List of Attendees ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12348A0892012-11-27027 November 2012 Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 5 of 5 ML12348A0882012-11-27027 November 2012 Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 2 of 5 ML12348A0872012-11-27027 November 2012 Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 1 of 5 ML12348A0842012-11-27027 November 2012 Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 4 of 5 ML12348A0832012-11-27027 November 2012 Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 3 of 5 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12045A2422012-01-13013 January 2012 Response to NRC Request for Additional Information Regarding the Proposed Change to the Emergency Action Level Scheme, Attachment 1 RS-11-167, Final Effective Joint Proxy Statement/Prospectus Relating to Application for Approval of Indirect Transfer of Control of Licenses2011-10-11011 October 2011 Final Effective Joint Proxy Statement/Prospectus Relating to Application for Approval of Indirect Transfer of Control of Licenses ML1117301402011-06-15015 June 2011 Attachment to E-mail from Alyse Peterson, Ny State Containing Comments on LAR for Cyber Security Plans for Nine Mile Point, Ginna, FitzPatrick, and Indian Point Plants ML1019504982010-07-0909 July 2010 Attachment 1, CDI Report No. 10-11NP, Stress Assessment of Nine Mile Point Unit 2 Steam Dryer Using the Acoustic Circuit Model Rev. 4.1, Rev. 0, Chapter 6 Through End ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0832304402008-12-12012 December 2008 Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3) ML0911905702008-10-27027 October 2008 NRC License Renewal Entrance Meeting, Entrance Exit Form ML0813006762008-04-23023 April 2008 Annual Assessment Meeting Attendance List ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0611800322006-04-28028 April 2006 NRC 2006, Gen&Sis - Census 2000 Minorities Ej Nine Mile Point License Renewal ML0609401172006-04-0303 April 2006 NOAA 2004a, Website Reference Used in Chapter 2 NMP FSEIS ML0609401882006-01-27027 January 2006 NYSDEC Undated, Website Reference Used in Chapter 2 NMP FSEIS ML0609401212005-10-20020 October 2005 NOAA 2004b, Website Reference Used in Chapter 2 NMP FSEIS ML0609401232005-10-18018 October 2005 NOAA 2004c, Website Reference Used in Chapter 2 NMP FSEIS ML0610100532005-03-22022 March 2005 Usdc 2005, Website Reference Used in Chapter 2 NMP FSEIS ML0609402312005-03-22022 March 2005 Uscb 2005c, Website Reference Used in Chapter 2 NMP FSEIS ML0609402222005-03-22022 March 2005 Uscb 2005b, Website Reference Used in Chapter 2 NMP FSEIS ML0609402182005-03-22022 March 2005 Uscb 2005a, Website Reference Used in Chapter 2 NMP FSEIS ML0610100562005-03-21021 March 2005 Usdol 2005, Website Reference Used in Chapter 2 NMP FSEIS ML0511905182005-03-14014 March 2005 Final Precursor Analysis - Nine Mile Point 1 ML0609401552005-02-0909 February 2005 NYSDEC 2003c, Website Reference Used in Chapter 2 NMP FSEIS 2022-07-22
[Table view] |
Text
US Nuclear Plants - Nine Mile Point Home > Nuclear > U.S. Nuclear Reactors > Nine Mile Point Release Date: August 4, 2004 Next Release Date: September 2005 U.S. Nuclear Plants Plants A - L Select a Plant Nine Mile Point Plants M - Z New York Unit 1 Nuclear system supplied by General Electric Company (U.S.)
Select a Plant Capacity Generation Capacity Type On-line License Net MW(e) in 2003 Factor Date Expiration Date Megawatthours Plants in New York 621 4,371,329 80.1% BWR Dec. 26, 1974 August 22, 2009 Fitzpatrick Indian Point Unit 2 Nuclear system supplied by General Electric Company (U.S.)
Nile Mile Point R.E. Ginna Capacity Generation Capacity Type On-line License Net MW(e) in 2003 Factor Date Expiration Date Megawatthours 1,135 8,428,646 83.9 % BWR July 2, 1987 October 31, 2026 BWR= Boiling Water Reactor Note: Unit 1 was previously reported as 619 net MW(e) in capacity and Unit 2 was reported as 1,154 net MW(e).
Description:
Nine Mile Point 1 and 2 are sited near Oswego, New York. The 900-acre site is also occupied by the Fitzpatrick nuclear plant. Nine Mile Point 1 is one of the Nation's two oldest reactors still in service (it is mentioned in the unique reactors feature elsewhere on this site).
Ownership: Nine Mile Point is operated by Constellation Nuclear. Unit 1 is owned entirely by Constellation Energy Group which shares ownership of unit 2 with the Long Island Power Authority (18 percent, LIPA, 82 percent, Contellation).
The Impact of the Nuclear Industry on New York:
News items: U.S.-Canada Power Outage Task Force Washington, D.C.
Highlights Nuclear-provided Electricity Generation Competition in the State Electricity Market Environmental Trends: Emissions levels Various Links to related sites.
Sources: Capacity, for purposes of this report, is the net summer capability as reported in Energy Information Administration (EIA) survey form 860, "Annual Electric Generator Report." Capacity Factor is a calculation in which the maximum possible generation (based on net summer capability) is divided into the actual generation than multiplied by 100 to get a percentage. Generation is the electricity output reported by plant owners on EIA survey form 906. Type of Unit: All U.S. commercial reactors currently in operation are one of two types: BWR (boiling water reactor) or PWR (pressurized light water reactor).
The type is identified in EIA's Nuclear Power Generation and Fuel Cycle Report. Both the On-line Date and the License Expiration Date are reported annually in Information Digest by the U.S. Nuclear Regulatory Commission.
http://www.eia.doe.gov/cneaf/nuclear/page/at_a_glance/reactors/nine_mile.html (1 of 2)04/04/2006 12:53:09 PM
US Nuclear Plants - Nine Mile Point
Contact:
John Moens Email: John.Moens@eia.doe.gov Phone: (202) 287-1976 EIA Home Contact Us Page last modified on Fri Mar 18 10:14:54 EST 2005.
URL: http://www.eia.doe.gov/cneaf/nuclear/page/at_a_glance/reactors/nine_mile.html http://www.eia.doe.gov/cneaf/nuclear/page/at_a_glance/reactors/nine_mile.html (2 of 2)04/04/2006 12:53:09 PM