Letter Sequence Approval |
---|
|
|
MONTHYEARML0601801862006-01-27027 January 2006 Request for Additional Information, Revision of Allowable Value for Reactor Trip System - Turbine Trip on Low Trip System Pressure Project stage: RAI ML0608602232006-03-16016 March 2006 Technical Specifications Change 05-04, Response to Request for Additional Information (RAI) Project stage: Response to RAI ML0610102602006-04-0606 April 2006 Technical Specification Pages Re Allowable Value for Reactor Trip System Project stage: Other ML0609005932006-04-0606 April 2006 License Amendments, Issuance of Amendments Revision of Allowable Value for Reactor Trip System -Turbine Trip on Low Trip System Pressure (TAC Nos. MC8246 and MC8247) (TS-05-04) Project stage: Approval 2006-03-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24304A8492024-10-31031 October 2024 December 2024 Requalification Inspection Notification Letter IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 ML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 2024-09-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24311A0332024-11-0707 November 2024 TVA Pre-Submittal Meeting Presentation on License Amendment Request to Revise SR 3.4.14.1 Reactor Coolant System Pressure Isolation Valves Leakage Testing Frequency on November 7, 2024 ML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public ML24057A3792024-03-0808 March 2024 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future License Amendment Request Related to Fuel Handling and Fuel Decay Time ML24065A0262024-03-0101 March 2024 LAR Pre-Application Meeting TS 3.9.8 (Decay Time) and FHA Dose Analysis Meteorological Monitoring and Dispersion Modeling Topics ML24039A0792024-02-12012 February 2024 – Summary of Regulatory Audit Regarding the License Amendment Request for Hydrologic Analysis Changes to the Updated Final Safety Analysis Report (EPID L-2020-LLA-0004) - Public ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML22334A0732023-02-0606 February 2023 Issuance of Amendment Nos. 363 and 357 Regarding Modification of the Approved Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22210A1182022-08-24024 August 2022 Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22108A2822022-04-27027 April 2022 Summary of Regulatory Audit Regarding the License Amendment Request to Revise TS to Adopt TSTF 505, Rev. 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21245A2672021-10-27027 October 2021 NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel ML21298A0312021-10-27027 October 2021 Issuance of Exigent Amendment No. 350 Regarding One-Time Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System, ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20337A0372021-02-0101 February 2021 Issuance of Amendment No. 353 Regarding Steam Generator Tube Inspection Frequency ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20262H0262020-11-12012 November 2020 Issuance of Amendment Nos. 349 and 343 Regarding Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML20108F0492020-04-23023 April 2020 Issuance of Amendment No. 342 Exigent Amendment to Operate One Cycle with One Control Rod Removed ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML19281B5542019-11-18018 November 2019 Issuance of Amendment Nos. 347 and 341 Request to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19179A1352019-09-18018 September 2019 Issuance of Amendment Nos. 346 and 340, Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19196A2212019-07-18018 July 2019 Issuance of Exigent Amendment Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable ML19058A0292019-05-0707 May 2019 Issuance of Amendments Request to Modify Essential Raw Cooling Water Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) ML18159A4612018-08-0606 August 2018 Issuance of Amendments Regarding Request to Change Emergency Plan ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... ML16228A0962016-10-0303 October 2016 Issuance of Amendments to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML16225A2762016-09-29029 September 2016 Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time ML15320A2182015-11-30030 November 2015 Issuance of Amendments to Revise Technical Specification for Containment Leakage Rate Program ML15238B4602015-09-30030 September 2015 Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues ML15100A0492015-09-28028 September 2015 SQN U2 Renewed License v2 ML15100A0462015-09-28028 September 2015 SQN U1 Renewed License v2 ML12249A3942012-09-26026 September 2012 Issuance of Amendments to Revise the Technical Specification to Allow Use of Areva Advanced W17 High Thermal Performance Fuel (TS-SQN-2011-07) ML12234A3812012-09-0606 September 2012 Issuance of Amendment Regarding the Proposed Operating License and Technical Specification Changes for Unit 2 Replacement Steam Generator Project to Conduct Heavy Load Lifts ML1121605932011-06-0303 June 2011 Sequoya Retake Initial Exam 2011-301 Final Administrative Documents ML1029900742010-12-21021 December 2010 License Amendment, Issuance of Amendments to Revised Technical Specifications to Resolve an Oversight Regarding the Operability Requirements for the Intermediate Range Neutron Flux Channels (TS-09-05) ML0933104032010-01-28028 January 2010 Issuance of Amendments Regarding Upgrade of Emergency Core Cooling System Requirements Per NUREG-1431 (TS 07-05) ML0928103332009-10-19019 October 2009 License Amendment, Issuance of Amendment to Allow Use of the W* Alternate Repair Criteria for Steam Generator Tubes (TS-09-02) ML0916107192009-08-14014 August 2009 License Amendment, Issuance of Amendments Regarding Revisions to the Ice Condenser Licensing Basis (TS 08-06) ML0909303302009-06-12012 June 2009 Issuance of Amendment Regarding Removal of Main Steam Isolation Valve Closure Times (TS 08-04) 2024-03-08
[Table view] Category:Safety Evaluation
MONTHYEARML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22334A0732023-02-0606 February 2023 Issuance of Amendment Nos. 363 and 357 Regarding Modification of the Approved Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22304A1862022-12-0101 December 2022 Revised Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage ML22284A0072022-11-0707 November 2022 Authorization of Alternative Request RP-12 for Testing of Centrifugal Charging Pump 1B-B ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22259A2042022-09-29029 September 2022 Correction to Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22263A3752022-09-29029 September 2022 Authorization of Alternative Request RV-02 for Pressure Isolation Valve Seat Leakage ML22210A1182022-08-24024 August 2022 Issuance of Amendment Nos. 358 and 352 Regarding Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22165A1052022-07-12012 July 2022 Issuance of Amendment Nos. 357 and 351 Regarding Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML21298A0312021-10-27027 October 2021 Issuance of Exigent Amendment No. 350 Regarding One-Time Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System, ML21245A2672021-10-27027 October 2021 NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel ML21266A3832021-10-0101 October 2021 Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21131A1632021-05-28028 May 2021 Authorization and Safety Evaluation for Alternative Request No. 21-ISI-1 ML21084A1902021-05-0404 May 2021 Issuance of Amendment Nos. 355 and 348 Regarding Revision to Technical Specification Table 3.3.3-1, Post Accident Monitoring Instrumentation ML21021A3492021-03-0303 March 2021 Issuance of Amendment Nos. 354 and 347 Regarding Revision to Technical Specification 4.2.2, Control Rod Assemblies ML20337A0372021-02-0101 February 2021 Issuance of Amendment No. 353 Regarding Steam Generator Tube Inspection Frequency ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20262H0262020-11-12012 November 2020 Issuance of Amendment Nos. 349 and 343 Regarding Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML20108F0492020-04-23023 April 2020 Issuance of Amendment No. 342 Exigent Amendment to Operate One Cycle with One Control Rod Removed ML19319C8312019-11-21021 November 2019 Issuance of Exigent Amendment No. 348 to Operate One Cycle with One Control Rod Removed ML19281B5542019-11-18018 November 2019 Issuance of Amendment Nos. 347 and 341 Request to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19234A0132019-09-23023 September 2019 Alternative Request 18-ISI-1 Regarding Examination of Dissimilar Metal Welds in Reactor Vessel Head ML19179A1352019-09-18018 September 2019 Issuance of Amendment Nos. 346 and 340, Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19227A1102019-08-26026 August 2019 Alternative Request for the Turbine Driven Auxiliary Feedwater Pumps 10-Year Interval Inservice Testing Program ML19196A2212019-07-18018 July 2019 Issuance of Exigent Amendment Technical Specification Change - Reactor Vessel Level Instrumentation Inoperable ML19058A0292019-05-0707 May 2019 Issuance of Amendments Request to Modify Essential Raw Cooling Water Control Center Breakers and to Revise the Updated Final Safety Analysis Report (SQN-TS-17-04) ML19010A2742019-03-18018 March 2019 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 ML18159A4612018-08-0606 August 2018 Issuance of Amendments Regarding Request to Change Emergency Plan ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... ML16340A0092017-03-0909 March 2017 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17059B7912017-03-0202 March 2017 Sequoyah Nuclear Plant, Units 1 and 2 - Relief from the Requirements of the American Society of Mechanical Engineer OM Code (CAC Nos. MF9305 and MF9306) ML16228A0962016-10-0303 October 2016 Issuance of Amendments to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 ML16225A2762016-09-29029 September 2016 Issuance of Amendments to Revise Technical Specification for Essential Raw Cooling Water System Allowed Completion Time ML16225A6332016-09-0202 September 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) ML16123A1312016-05-12012 May 2016 Relief Requests RP-01, RP-02, RP-06, RP-08, and RV-01 Related to the Inservice Testing Program, Fourth 10-Year Interval (CAC Nos. MF7099 and MF7100) ML15329A1862015-12-0404 December 2015 Request for Relief PR-07 for Alternative Inservice Pump Testing at Reference Values 2024-03-26
[Table view] |
Text
April 6, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 ISSUANCE OF AMENDMENTS RE: REVISION OF ALLOWABLE VALUE FOR REACTOR TRIP SYSTEM (TAC NOS. MC8246 AND MC8247) (TS-05-04)
Dear Mr. Singer:
The Commission has issued the enclosed Amendment No. 307 to Facility Operating License No. DPR-77 and Amendment No. 296 to Facility Operating License No. DPR-79 for the Sequoyah Nuclear Plant, Units 1 and 2, respectively. These amendments are in response to your application dated September 1, 2005, as supplemented by letters dated March 16 and 30, 2006 (TS-05-04).
The amendments revise the reactor protection system turbine trip allowable value for low trip system pressure from greater than or equal to 43 pounds per square inch gauge (psig) to 39.5 psig. The amendments revise Technical Specification 2.2.1, Functional Unit 17.A allowable value in Table 2.2-1 Reactor Trip System Instrumentation Setpoints. The amendments are limited in duration and will expire at the end of the Cycle 15 Operating Cycle for each unit.
A copy of the Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328 Encls: 1. Amendment No. 307 to License No. DPR-77
- 2. Amendment No. 296 to License No. DPR-79
- 3. Safety Evaluation cc w/encls: See next page
ML060900593 TS: ML062070082 Package No. ML061010258 NRR-058 OFFICE PM:LPL2-2 LA:LPL2-2 BC:EICB BC:ITSB OGC BC:LPL2-2 NAME DPickett RSola AHowe TTjader for RWeisman MMarshall TBoyce DATE 4/06/06 4/06/06 4/03/06 4/04/06 4/05/06 4/06/06 Mr. Karl W. Singer SEQUOYAH NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Glenn W. Morris, Manager Nuclear Operations Corporate Nuclear Licensing Tennessee Valley Authority and Industry Affairs 6A Lookout Place Tennessee Valley Authority 1101 Market Street 4X Blue Ridge Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, Vice President Nuclear Engineering & Technical Services Mr. Paul L. Pace, Manager Tennessee Valley Authority Licensing and Industry Affairs 6A Lookout Place ATTN: Mr. James D. Smith 1101 Market Street Sequoyah Nuclear Plant Chattanooga, TN 37402-2801 Tennessee Valley Authority P.O. Box 2000 Mr. Robert J. Beecken, Vice President Soddy Daisy, TN 37384-2000 Nuclear Support Tennessee Valley Authority Mr. David A. Kulisek, Plant Manager 6A Lookout Place Sequoyah Nuclear Plant 1101 Market Street Tennessee Valley Authority Chattanooga, TN 37402-2801 P.O. Box 2000 Soddy Daisy, TN 37384-2000 Mr. Randy Douet Site Vice President Senior Resident Inspector Sequoyah Nuclear Plant Sequoyah Nuclear Plant Tennessee Valley Authority U.S. Nuclear Regulatory Commission P.O. Box 2000 2600 Igou Ferry Road Soddy Daisy, TN 37384-2000 Soddy Daisy, TN 37379 General Counsel Mr. Lawrence E. Nanney, Director Tennessee Valley Authority Division of Radiological Health ET 11A Dept. of Environment & Conservation 400 West Summit Hill Drive Third Floor, L and C Annex Knoxville, TN 37902 401 Church Street Nashville, TN 37243-1532 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing County Mayor Tennessee Valley Authority Hamilton County Courthouse 6A Lookout Place Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Ms. Ann P. Harris 341 Swing Loop Road Rockwood, Tennessee 37854
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-327 SEQUOYAH NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 307 License No. DPR-77
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated September 1, 2005, as supplemented by letters dated March 16 and 30, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 Code of Federal Regulations (10 CFR) Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-77 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 307, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance, to be implemented no later than 45 days after issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Michael L. Marshall, Jr., Branch Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 6, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 307 FACILITY OPERATING LICENSE NO. DPR-77 DOCKET NO. 50-327 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 2-6a 2-6a
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-328 SEQUOYAH NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 296 License No. DPR-79
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated September 1, 2005, as supplemented by letter dated March 16 and 30, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-79 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 296, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance, to be implemented no later than 45 days after issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Michael L. Marshall, Jr., Branch Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 6, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 296 FACILITY OPERATING LICENSE NO. DPR-79 DOCKET NO. 50-328 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by amendment number and contains a marginal line indicating the area of change.
REMOVE INSERT 2-7 2-7
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 307 TO FACILITY OPERATING LICENSE NO. DPR-77 AND AMENDMENT NO. 296 TO FACILITY OPERATING LICENSE NO. DPR-79 TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328
1.0 INTRODUCTION
By application dated September 1, 2005, as supplemented by letters dated March 16 and March 30, 2006, the Tennessee Valley Authority (TVA, the licensee) proposed amendments to the Technical Specifications (TSs) for Sequoyah Nuclear Plant (SQN) Units 1 and 2. The supplemental letters provided clarifying information that expand the scope of the amendment and did not change the initial proposed no significant hazards consideration determination.
The requested changes would temporarily revise the allowable value for the low trip system pressure input to the reactor trip system that indicates a turbine trip condition. This function has a setpoint value of greater than or equal to ($) 45 pounds per square inch (psig) and the current allowable value is $ 43 psig. The licensee proposes to revise the allowable value to
$ 39.5 psig. The amendments would be limited in duration and would expire at the end of the Cycle 15 Operating Cycle for each unit.
The proposed change would revise the allowable value of TS Table 2.2.1 Reactor Trip System Instrumentation Trip Setpoints, Functional Unit 17.A Low Trip System Pressure. This function monitors the main turbine auto oil stop pressure and generates an anticipatory trip of the reactor in the event that the pressure drops below a predetermined value. The autostop oil pressure signal dumps the autostop emergency trip fluid, closing all of the turbine steam stop valves.
The trip setpoint will remain at the current value of $ 45.0 psig. This change will not affect other portions of the TS.
The reactor trip on turbine trip is actuated by either (1) a two out of three logic from low autostop oil pressure signals or (2) an all-closed signal from the turbine steam stop valves. A turbine trip causes a direct reactor trip above the P-9 setpoint, which is set at approximately 50 percent power level.
The reactor trip on turbine trip is an anticipatory trip input signal to the reactor trip system. The involved switch trip function is an anticipatory trip to enhance the overall reliability of the reactor trip system. The reactor trip is not credited in any of the Chapter 15 accident analysis of the SQN Updated Final Safety Analysis Report. The licensee does not attribute any safety limit for the switch function.
2.0 BACKGROUND
TVA has evaluated historical calibration data for the autostop oil pressure sensors at the SQN facility. This data indicates an unacceptable number of occurrences where the as-found instrument values were outside the allowable value limits. TVA has utilized the Corrective Action Program to investigate these occurrences and determine a resolution to minimize these events. The licensee concluded that the allowable value for this function was too limiting for the accuracy and repeatability of the switches and, therefore, not adequate based on the design capabilities of the instrumentation.
3.0 REGULATORY EVALUATION
The following regulatory bases and guidance documents pertain to the proposed TS change:
General Design Criterion (GDC) 13 "Instrumentation and Control," of Appendix A "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50 "Domestic Licensing of Production and Utilization Facilities," requires, among other things, that instrumentation be provided to monitor variables and systems and that controls be provided to maintain these variables and systems within prescribed operating ranges.
GDC 20 "Protection System Functions," of Appendix A to 10 CFR Part 50 requires, among other things, that the protection system be designed to initiate operation of appropriate systems to ensure that specified acceptable fuel design limits are not exceeded.
Regulatory Guide 1.105 Setpoints for Safety-Related Instrumentation, describes a method acceptable to the Nuclear Regulatory Commission (NRC) staff for complying with the NRC's regulations for ensuring that setpoints for safety-related instrumentation are initially within and remain within the technical specification limits.
4.0 TECHNICAL EVALUATION
The turbine autostop oil system is designed to operate at approximately 90 psig. As previously discussed, the autostop oil pressure signal dumps the autostop emergency trip fluid, closing all of the turbine steam stop valves. When the autostop emergency trip fluid is dumped, oil pressure immediately drops from its normal operating pressure of approximately 90 psig to 0 psig. The system trip setpoint (45 psig) and allowable value (43 psig) were supplied by the nuclear steam system supplier (Westinghouse). These values were system generic values and not specifically designed for application at the SQN facility. As discussed in Section 2.0 of this safety evaluation, the licensee has concluded that the allowable value for this function is too limiting for the accuracy and repeatability of the switches and, therefore, not adequate based on the design capabilities of the instrumentation.
The licensee has prepared a calculation to define a plant-specific allowable value for the switch setpoint of 45 psig. The allowance between the allowable value and the trip setpoint accounts for instrument drift, calibration uncertainties for the channel tested, and instrument uncertainties during normal operation that are measured during testing.
The allowable value as calculated by the licensee is simply the normal setpoint (45 psig) minus a term referred to as the Normal Measurable Accuracy. The Normal Measurable Accuracy is the square root of the summation of squares of the unknowns. The unknowns include their own tolerances (i.e., instrument drift, temperature effects, switch repeatability, as-left calibration tolerance, input calibration test equipment accuracy, and reading error allowance).
The licensees calculation identifies the Normal Measurable Accuracy as 5.5 psig. This results in a plant-specific allowable value of 39.5 psig (i.e., 45 psig - 5.5 psig).
The staff has reviewed the licensees setpoint methodology and calculation and concludes that the methodology demonstrates that the proposed allowable value is reasonable. This proposed change will allow the instrumentation that performs this trip function to be tested and verified to be operable within the capabilities of the pressure switches. In addition, the licensees setpoint calibration procedures will maintain the trip setpoint within the established setting tolerance to ensure that the instrument will be capable of performing its specified safety function. Based on its review of the licensees calculation and justification, the staff finds the proposed TS change acceptable until the end of Cycle 15 Operating Cycle for each unit. A footnote in the revised TS pages documents this limit.
5.0 STATE CONSULTATION
In accordance with the Commissions regulations, the staff made a good faith effort to notify the Tennessee state official of the proposed issuance of the amendments. However, the staff was unable to contact the state official prior to issuance of the amendments. The staff will inform the state official of this action.
6.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (70 FR 61662). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: S. Rhow C. Schulten Date: April 6, 2006