MONTHYEARML0608304652006-03-24024 March 2006 Gerald P. Van Noordennen Ltr Acknowledgment of Request for Relief for the Haddam Neck Plant(Tac No. L60600) Project stage: Other ML0608304162006-03-30030 March 2006 Wayne Norton Ltr Haddam Neck Plant - Request for Relief from 10 CFR Part 50.70(b)(1) (TAC No. L60600) Project stage: Other 2006-03-24
[Table View] |
|
---|
Category:Letter
MONTHYEARCY-24-010, Independent Spent Fuel Storage Installation - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2024-12-10010 December 2024 Independent Spent Fuel Storage Installation - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000213/20240012024-08-27027 August 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation NRC Inspection Report Nos. 07200039/2024001 and 05000213/2024001 ML24094A0742024-05-30030 May 2024 Issuance of Exemption for Connecticut Yankee Atomic Power Company Regarding Haddam Neck Plant Independent Spent Fuel Storage Installation CY-24-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2024-03-11011 March 2024 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23342A0972024-01-0909 January 2024 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-23-010, Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2)2023-04-24024 April 2023 Independent Spent Fuel Storage Installation, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) CY-23-008, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20222023-04-20020 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2022 CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4922023-02-24024 February 2023 Closeout Letter to Connecticut Yankee Regarding 2018 and 2021 Updated DFPs for Haddam Neck Plant ISFSI CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments IR 07200039/20224012022-10-0505 October 2022 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Security Inspection Report No. 07200039/2022401 CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 And Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22011A1352022-01-31031 January 2022 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22075A2382021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant Updated Final Safety Analysis Report CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration IR 05000213/20210012021-10-26026 October 2021 Connecticut Yankee Atomic Power Company - NRC Independent Spent Fuel Storage Installation Inspection Report Nos. 07200039/2021001 and 05000213/2021001 ML21144A2512021-04-13013 April 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2020 CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage ML21012A3192021-01-13013 January 2021 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan IR 07200039/20204012020-11-20020 November 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Report 07200039/2020401, Without Enclosure (Public - Cover Letter Only) ML20150A3352020-06-19019 June 2020 COVID-19 Exemption for Haddam Neck CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement CY-20-009, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20192020-04-16016 April 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2019 CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2020-01-22022 January 2020 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 ML20015A5262020-01-15015 January 2020 Connecticut Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML19269C4642019-10-11011 October 2019 Letter to B. Mitchell Exemption from 10 CFR 72.212 and 72.214 for Dry Spent Fuel Storage Activities - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Managers Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Managers Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report CY-19-013, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20182019-04-23023 April 2019 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2018 2024-08-27
[Table view] |
Text
March 24, 2006 Gerald P. van Noordennen Director of Nuclear Safety & Regulatory Affairs Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, CT 06424-3099
SUBJECT:
ACKNOWLEDGMENT OF REQUEST FOR RELIEF FOR THE HADDAM NECK PLANT(TAC NO. L60600)
Dear van Noordennen:
The U.S. Nuclear Regulatory Commission (NRC) staff has received your application for relief from 10 CFR 50.70(b)(1) dated March 10, 2006, for the Haddam Neck Plant. Section 50.70(b) requires office space be provided for the use of NRC inspection staff. We have completed the initial processing, which is an administrative review, and have accepted your application for a more detailed technical review. The more detailed technical review may identify omissions in the submitted information or technical issues that require additional information. These will be forwarded to you under separate cover in the future. The staff expects to complete its review by April 10, 2006.
If you have any questions on these matters, please contact me at (301) 415-6721.
Sincerely,
/RA/
Theodore B. Smith, Project Manager Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No.: 50-213 License No.: DPR-61 cc: Connecticut Yankee Service List
March 24, 2006 Gerald P. van Noordennen Director of Nuclear Safety & Regulatory Affairs Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, CT 06424-3099
SUBJECT:
ACKNOWLEDGMENT OF REQUEST FOR RELIEF FOR THE HADDAM NECK PLANT(TAC NO. L60600)
Dear van Noordennen:
The U.S. Nuclear Regulatory Commission (NRC) staff has received your application for relief from 10 CFR 50.70(b)(1) dated March 10, 2006, for the Haddam Neck Plant. Section 50.70(b) requires office space be provided for the use of NRC inspection staff. We have completed the initial processing, which is an administrative review, and have accepted your application for a more detailed technical review. The more detailed technical review may identify omissions in the submitted information or technical issues that require additional information. These will be forwarded to you under separate cover in the future. The staff expects to complete its review by April 10, 2006.
If you have any questions on these matters, please contact me at (301) 415-6721.
Sincerely,
/RA/
Theodore B. Smith, Project Manager Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No.: 50-213 License No.: DPR-61 cc: Connecticut Yankee Service List DISTRIBUTION:
DCD r/f DGillen RidsRgn1MailCenter RidsOgcMailCenter DOrlando ML060830465 OFC DCD:PM DCD:LA DCD:SC NAME TSmith SMichonski for CBurkhalter CCraig DATE 3/24/2006 3/24/2006 3/24/2006 OFFICIAL RECORD COPY
Connecticut Yankee Atomic Power Company Service List Mr. Allan Johanson, Assistant Director Mr. Randall L. Speck Office of Policy and Management Kaye, Scholer, Fierman, Hayes & Handler, Policy Development and Planning Division LLP 450 Capitol Avenue- MS# 52 ERN The McPherson Building P.O. Box Bo 341441 901 Fifteenth Street, NW Suite 1100 Hartford, CT 06134-1441 Washington, DC 20005-2327 Dr. E. L. Wilds, Jr. Director Ms. Kelly Smith Monitoring and Radiation Division Communications Manager Connecticut Department of Environmental Connecticut Yankee Atomic Power Protection Company 79 Elm Street Haddam Neck Plant Hartford, CT 06106-5127 362 Injun Hollow Road East Hampton, CT 06424-3099 Board of Selectmen Town Office Building Mr. Bruce D. Kenyon Haddam, CT 06438 Chief Executive Officer Connecticut Yankee Atomic Power Mr. Wayne Norton Company President Haddam Neck Plant Connecticut Yankee Atomic Power 16 Sandpiper Point Road Company Old Lyme, CT 06371 Haddam Neck Plant 362 Injun Hollow Road Mr. Kenneth Heider East Hampton, CT 06424-3099 Vice President Connecticut Yankee Atomic Power Mr. Gerald Garfield Company General Counsel Haddam Neck Plant Day, Berry, and Howard 362 Injun Hollow Road City Place 1 East Hampton, CT 06424-3099 Hartford, CT 06103-3499 Mr. Michael Thomas Mr. Gerry P. van Noordennen Vice President & Chief Financial Officer Director of Nuclear Safety/ Connecticut Yankee Atomic Power Regulatory Affairs Company Connecticut Yankee Atomic Power Haddam Neck Plant Company 362 Injun Hollow Road Haddam Neck Plant East Hampton, CT 06424-3099 362 Injun Hollow Road East Hampton, CT 06424-3099 Ms. Rosemary Bassilakis Citizens Awareness Network 54 Old Turnpike Road Haddam, CT 06438