March 22, 2006 LICENSEE:
Exelon Generation Company, LLC FACILITY:
Quad Cities Nuclear Power Station (QCNPS)
SUBJECT:
SUMMARY
OF MARCH 16, 2006, PUBLIC MEETING TO DISCUSS ELECTROMATIC RELIEF VALVE INSPECTION SCOPE FOR THE QUAD CITIES UNIT 2 REFUELING OUTAGE On March 16, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting with the Exelon Generation Company at the NRCs Region III office in Lisle, Illinois. The purpose of the meeting was to discuss the planned inspection scope for the electromatic relief valves (ERVs) during the Quad Cities Nuclear Power Station Unit 2 refueling outage as a result of the ERV actuator degradation identified during December 2005 and January 2006 forced outages.
This meeting also provided an opportunity for Exelon and the Quad Cities staff to describe the results of the root cause investigation for the ERV degradation and to summarize the modifications and other corrective actions planned to reduce Main Steam Line (MSL) vibration and improve the ERV actuator performance.
Geoffrey Grant, Deputy Regional Administrator, Region III, and Mark Satorius, Division Director, Division of Reactor Projects, Region III, opened the meeting. Tim Tulon, Site Vice President, Quad Cities, introduced Exelons presentation. Exelon presented an overview of the preliminary root cause evaluation, conclusions, and related corrective actions. Additionally, Exelon presented the results of the extent-of-condition review, planned outage inspection scope, a summary of planned modifications, and a summary of the startup test plan. Planned actions for Quad Cities Unit 1 were also discussed. Specific technical issues related to the presentation were discussed during the meeting and key future interactions between Quad Cities and the NRC were reviewed to ensure timely communications are maintained as the outage, modifications, and test plan move forward.
In closing remarks, James Caldwell, Regional Administrator, Region III, reinforced the need for clear communications between Exelon and the NRC. He also reinforced the importance of ensuring the root cause determination and corrective actions were thorough and that the vibration related issues were resolved in a timely manner.
The meeting notice can be found in ADAMS as ML060590691. A list of meeting participants and the Exelon presentation can be found in the attached Enclosures.
Before adjourning the meeting, the NRC provided the opportunity for members of the audience to ask questions. There were none.
Exelon Generation Company, LLC In accordance with 10 CFR 2.390 of the NRCs Rule of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosures:
- 1. List of Attendees
- 2. Exelon Presentation Slides cc w/encls:
Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company
Exelon Generation Company, LLC In accordance with 10 CFR 2.390 of the NRCs Rule of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Enclosures:
- 1. List of Attendees
- 2. Exelon Presentation Slides cc w/encls:
Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company DOCUMENT NAME:E:\\Filenet\\ML060820112.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E
NAME MRing:dtp DATE 03/22/06 OFFICIAL RECORD COPY
Exelon Generation Company, LLC ADAMS Distribution:
GYS MXB RidsNrrDirsIrib GEG KGO KKB DRPIII DRSIII PLB1 JRK1 PUBLIC MEETING ATTENDEES March 16, 2006 Exelon Tim Tulon Site Vice President-QCNPS Amir Shahkarami Senior Vice President-Nuclear Engineering Randy Gideon Plant Manager QCNPS Keith Jury Director - Licensing Roman Gesior Director - Corporate Programs Bruce Rash Director - Design Engineering Karl Moser Director - Engineering Pat Simpson Manager - Licensing Wally Beck Manager - Regulatory Assurance Pedro Salas Manager - Regulatory Assurance (Dresden Station)
Dan Moore Manager - Nuclear Oversite William Porter Manager - Design Engineering Steve Boline Deputy Manager - Engineering Thomas Roddy Licensing Engineer Richard Hall Engineering Brian Strub Engineering Dennis Cook Engineering William Stoermer Communications David Tubbs Mid-American Energy Brian Renwick Sargent & Lundy NRC James Caldwell Regional Administrator, Region III Geoffrey Grant Deputy Regional Administrator, Region III Ed Hackett Deputy Director, Division of Operating Reactor Licensing, NRR Mark Satorius Director, Division of Reactor Projects, Region III Anne Boland Deputy Director, Division of Reactor Safety, Region III Mark Ring Chief, Branch 1, Division of Reactor Projects, Region III David Hills Chief, Branch 1, Division of Reactor Safety, Region III Gary Hammer Mechanical Engineer, Division of Engineering, NRR Karla Stoedter Senior Resident Inspector, QCNPS, Region III Mike Kurth Resident Inspector, QCNPS, Region III John Honcharik Project Manager, QCNPS, NRR Maitri Banerjee Project Manager, Dresden/QCNPS, NRR Cheng-ih Wu Mechanical Engineer, Division of Engineering, NRR Allan Barker Project Engineer, Region III John Jacobson Senior Reactor Engineer, Region III Daneira Melendez-Colon Reactor Engineer, Region III Liliana Ramadan Reactor Engineer, Region III James McGhee Reactor Engineer, Region III IEMA Cecil Settles Division Chief, IDNS Robert Ganser Resident, QCNPS, IDNS