Technical Specification, Amendment Revises TS Limit on Pressurizer Water Level in Mode 3
ML060810483
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/22/2006
From: Boska J
Plant Licensing Branch III-2
To: Kansler M
Entergy Nuclear Operations
References
Download: ML060810483 (2)


Text

Pressurizer 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Pressurizer LCO 3.4.9 The pressurizer shall be OPERABLE with:

a.

Pressurizer water level < 65.1% in MODES 1 and 2, or

< 84% in MODE 3; and

b.

Two groups of pressurizer heaters OPERABLE with the capacity of each group 2 150 kW with each group powered from a different safeguards power train.

I APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Pressurizer water level A.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> not within limit.

AND A.2 Fully insert all rods.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> AND A.3 Place Rod Control System 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in a condition incapable of rod withdrawal.

AND A.4 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B. One required group of B.1 Restore required group of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pressurizer heaters pressurizer heaters to inoperable.

OPERABLE status.

INDIAN POINT 2 3.4.9 - 1 Amendment No. 246

Pressurizer 3.4.9 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not AND met.

C.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1 Verify pressurizer water level is < 65.1% in MODES 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1 and 2, or < 84% in MODE 3.

SR 3.4.9.2 Verify capacity of each required group of pressurizer 24 months heaters is 2 150 kW.

INDIAN POINT 2 3.4.9 - 2 Amendment No. 246