ML060670362
| ML060670362 | |
| Person / Time | |
|---|---|
| Site: | Harris, Brunswick, Crystal River, Robinson |
| Issue date: | 02/24/2006 |
| From: | Burton C Progress Energy Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PE&RAS-06-010 | |
| Download: ML060670362 (11) | |
Text
Zv n10 CFR 26.71(d)
C Progress Energy PO Box 1551 41 1 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-06-010 February 24, 2006 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:
Pursuant to 10 CFR 26.71(d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).
The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period July 1, 2005 through December 31, 2005.
This document contains no new regulatory commitment.
Please contact me at (919) 546-6901 if you need additional information concerning this report.
Sincerely, Chris Burton Manager - Performance Evaluation & Regulatory Affairs HAS Enclosure c:
W. D. Travers, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 B. L. Mozafari, NRR Project Manager - BSEP, Unit Nos. 1 and 2; CR3 C. P. Patel, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 J. A. Sanford - North Carolina Utilities Commission G. Thigpen - North Carolina Utilities Commission S. Watson - North Carolina Utilities Commission B. Hall - North Carolina Department of Environmental and Natural Resources T
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-010 Page 1 of 10 Fitness For Duty Program (July 1, 2005 -- December 31, 2005)
PERFORMANCE DATA
"AO-United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-01 0 Page 2 of 10
SUMMARY
DATA AND ANALYSIS Description Carolina Power & Light Company l Florida Power Corporation es_______
l_ (Progress Energy Carolinas, Inc.)
l (Progress Energy Florida, Inc.)
Data Analysis Brunswick Harris Robinson Crystal River Number of Random 2,'2 255 257 286 Tests Conducted 2
Average Population 11(38 906 864 1023 Eligible for Testing P1 O 4
m Random Testing Rate 23.3%
28.1%
29.7%
28.0%
to ¢:_
t Number of Random 784 286 C
Tests Conducted
~ ~
Average Population29813 1
.2 Eligible for Testing 2
9 38
_1023 rr4 R Random Testing Rate 26.7%
28.0%
Number of Random 1680 484 Tests Conducted V C.)
Average Population 908 E
Eligible for Testing O, Cn m
Random Testing Rate 55.4%
53.3%
- Data for corporate and other support staff are included with site data, as appropriate.
Analysis of the data indicates no program weakness requiring management action.
SUMMARY
OF MANAGEMENT ACTIONS Unescorted access for the individuals with confirmed positive tests was denied or revoked as applicable.
EVENTS REPORTED BY TELEPHONE UNDER 10 CFR 26.73 During this reporting period, no licensed operator or supervisor tested positive, and no significant FFD event report was made.
2 United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-010 Page 3 of 10 FITNESS FO;R DUTY PROGRAM PERFO1MANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)
December 31, 2005 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
FI Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500
/
Cocaine 300/150 Phencyclidine 25/25
/
Opiates 300/300 Alcohol (% BAC 0.04%
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 833 N/A 335 Unescorted Access CATEGORIES
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access 41 0
N/A N/A 118 0
For Cause:
Post accident 0
0 N/A N/A 0
0 Observed behavior 3
0 N/A N/A 2
0 Random 215 1
N/A N/A 57 0
Follow-Up 3
0 N/A N/A 0
0 Other 0
0 N/A N/A 0
0 Refusal to Participate 0
0 N/A N/A 0
0 Total 262 1
N/A N/A 177 0
United States Nuclear Regulatory Commission V
Enclosurc to Scrial: PE&RAS-06-010 Page 4 of 10 Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK Marijuan Amphet-Phency-Refusal CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4
5 Licensee Employees 0
0 0
0 0
1 0
0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A _
Short-Term Contracts 0
0 0
0 0
0 0
0 A
Total 1 0 1 0 1 0 1
0 0
1 1 1
0 1
0 L L L L 1I10 l
/ 0, ill,"
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-010 Page 5 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)
December 31, 2005 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
[
Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500
/
Cocaine 300/150 Phencyclidine 25/25
/
Opiates 300/300 Alcohol (% BAC) 0.04%
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 633 N/A 273 Unescorted Access 633 CATEGORIES
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access 55 0
N/A N/A 106 0
For Cause:
Post accident 0
0 N/A N/A 2
0 Observed behavior 0
0 N/A N/A 1
0 Random 188 0
N/A N/A 67 0
Follow-Up 4
0 N/A N/A 0
0 Other 0
0 N/A N/A 1
0 Refusal to Participate 0
0 N/A N/A 0
0 Total 247 0
N/A NIA 177 0
United States Nuclear Regulatory Commission Enclosure to Scrial: PE&RAS-06-010 Page 6 of 10 Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana Amphet-Phency-Refusal (NRCIPEC CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4
5 Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A I I Short-Term Contracts 0
A A
A V
nV A
O%
U U
A Total 0
0 0
0 10 I
O I
O I
O I
O I
O L L II
.01-11 P
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-0 10 Page 7 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC)
December 31, 2005 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml)
[ Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500
/
Cocaine 300/150 Phencyclidine 25/25
/
Opiates 300/300 Alcohol (% BAC)l 0.04%
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 502 N/A 362 Unescorted Access CATEGORIES
- Tested
- Positive
- Tested l Positive
- Tested
- Positive Pre-Access 47 0
N/A N/A 528 5
For Cause:
Post accident 0
0 N/A N/A 3
0 Observed behavior 0
0 N/A N/A 3
0 Random 142 0
N/A N/A 115 3
Follow-Up 0
0 N/A N/A 2
0 Other 1
0 N/A N/A 1
1 Refusal to Participate 0
0 N/A N/A 0
0 Total 190 0
N/A N!A 652 9
United States Nuclear Regulatory Commission
'N_
Enclosurc to Serial: PE&RAS-06-0 10 Page 8 of 10 Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana Amphet-Phency-Refusal (NRCIPECAmht PhnyReua CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2
3 4 5
Licensee Employees 0
0 0
0 0
0 0
0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Ter r-rr.
4 14 11 U
0 0
2 0
0 A
Total 5
l 0
l 0
J 0
2 j 0 l
0 I I llI I
One individual tested positive for both drug and alcohol
,./l United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-0 10 Page 9 of 10 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEF)
December 31, 2005 Company 6 Months Ending Crystal River Nuclear Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml) 11 Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500
/
Cocaine 300/150 Phencyclidine 25/25
/
Opiates 300/300 Alcohol (% BAC) 0.04%
/
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 664 N/A 359 Unescorted Access CATEGORIES
- Tested
- Positive
- Tested
- Positive
- Tested
- Positive Pre-Access 303 4
N/A N/A 429 3
For Cause:
Post accident 1
0 N/A N/A 1
0 Observed behavior 2
1 N/A N/A 3
0 Random 209 0
N/A N/A 77 0
Follow-Up 0
0 N/A N/A 7
0 Other 1
0 N/A N/A 0
0 Refusal to Participate 0
1 N/A N/A 0
1 Total 516 6
N/A NIA 517 4
United States Nuclear Regulatory Commission Enclosure to Serial: PE&RAS-06-0 10 Page 10 of 10 Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marjuana Amphet-Phency-Refusal CUTOFF)
Cocaine Opiates amines clidine Alcohol to Test Adulteration 2
3 4
5 Licensee Employees 0/2 2
0 1
0 0
1 0
Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A ShorD.t-TermS*
ConDStracts A IA IllI A
0 0
0 0
i 0
A Total l
1/3 l
3 1
0 1
1 1
0 1
0 1
2 1
0 l
l l
l 7/3 l