ML060610661

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan for 03/01/2006 - 09/30/2007
ML060610661
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/02/2006
From:
Division Reactor Projects II
To:
Shared Package
ML060610651 List:
References
IR-06-001
Download: ML060610661 (3)


Text

Page 1 of 3 Oconee 03/02/2006 14:36:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-CDB - COMPONENT DESIGN BASES INSPECTION 6 1, 2, 3 IP 7111121 Component Design Bases Inspection 02/27/2006 03/03/2006 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 03/13/2006 03/17/2006 Baseline Inspections EB3-ISI - U3 INSERVICE INSPECTION 1 3 IP 7111108P Inservice Inspection Activities - PWR 05/08/2006 05/12/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-3) 4 3 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 05/14/2006 05/19/2006 Baseline Inspections EB3SGISI - U3 STEAM GENERATOR ISI 1 3 IP 7111108P Inservice Inspection Activities - PWR 05/15/2006 05/19/2006 Baseline Inspections 1, 2, 3 IP 71152 Identification and Resolution of Problems 05/15/2006 05/19/2006 Baseline Inspections PSB1- RP - RP PRE-INSPECTION AND ISFSI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 05/30/2006 05/31/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23254 OCONEE/JUNE 2006 EXAM AT POWER FACILITIES 05/30/2006 06/02/2006 Not Applicable PSB1-RP - RP PUBLIC BASELINE INSP 4 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 06/19/2006 06/23/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 06/19/2006 06/23/2006 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23254 OCONEE/JUNE 2006 EXAM AT POWER FACILITIES 06/19/2006 06/30/2006 Not Applicable ISFSI-O - 60855.1 - OPERATION OF AN ISFSI 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/03/2006 07/07/2006 Other Routine PI&R - PI&R INSPECTION: 50.59 FOLLOW-UP 1 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/17/2006 07/19/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 07/17/2006 07/21/2006 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/17/2006 07/21/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 07/17/2006 07/21/2006 Baseline Inspections EB3-HS - HEAT SINK 2 1, 2, 3 IP 7111107B Heat Sink Performance 07/24/2006 07/28/2006 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 10/02/2006 10/06/2006 Baseline Inspections 1, 2, 3 IP 7111117B Permanent Plant Modifications 10/02/2006 10/06/2006 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 3 Oconee 03/02/2006 14:36:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-ISI - U1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/16/2006 10/20/2006 Baseline Inspections EB3SGISI - U1 STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/23/2006 10/27/2006 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 11/19/2006 11/24/2006 Baseline Inspections PSB1-RP - RP PRE-INSP VISIT/ISFSI 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/21/2007 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 03/26/2007 03/30/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK1 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 04/16/2007 04/20/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 04/16/2007 04/20/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 04/16/2007 04/20/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/30/2007 05/04/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 05/06/2007 05/11/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WK2 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 05/07/2007 05/11/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 05/07/2007 05/11/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 05/07/2007 05/11/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 05/07/2007 05/11/2007 Baseline Inspections PB1-PI&R - BIENNIAL PI&R INSPECTION 5 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/09/2007 07/13/2007 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 07/23/2007 07/27/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23244 OCONEE/EXAM AT POWER FACILITIES 07/30/2007 08/03/2007 Not Applicable PS2-EP - EP INSP 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/06/2007 08/10/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Oconee 03/02/2006 14:36:55 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP INSP 1 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 08/06/2007 08/10/2007 Baseline Inspections OL EXAM - INITIAL EXAM 3 1 V23244 OCONEE/EXAM AT POWER FACILITIES 08/20/2007 08/31/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.