Inspection/Activity Plan, 03/01/2006 - 09/30/2007
ML060610518
Person / Time
Site: Farley, 07200042  Southern Nuclear icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML060610506 List:
References
IR-06-001
Download: ML060610518 (2)


Text

Page 1 of 2 Farley 03/02/2006 13:33:57 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 02/27/2006 03/03/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/13/2006 03/15/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK1 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/10/2006 04/14/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/10/2006 04/14/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/10/2006 04/14/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/10/2006 04/14/2006 Baseline Inspections EB3-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 04/17/2006 04/21/2006 Baseline Inspections EB3 SGIS - U1 SG ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/17/2006 04/21/2006 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE WK2 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/17/2006 04/21/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/17/2006 04/21/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/17/2006 04/21/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/17/2006 04/21/2006 Baseline Inspections EB1-CDB - COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP 7111121 Component Design Bases Inspection 06/26/2006 06/30/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/17/2006 07/21/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 08/14/2006 08/18/2006 Baseline Inspections ISFSI-O - 60855.1 - OPERATION OF AN ISFSI 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/03/2006 07/07/2006 Other Routine OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 07/24/2006 07/28/2006 Baseline Inspections PS2-EP - EP EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/11/2006 09/15/2006 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23234 FARLEY/EXAMS AT POWER FACILITIES 10/02/2006 10/06/2006 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23234 FARLEY/EXAMS AT POWER FACILITIES 10/23/2006 10/27/2006 Not Applicable This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Farley 03/02/2006 13:33:57 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP PUBLIC PRE-INSPECTION VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/08/2007 01/10/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSPECTION 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections EB3SGISI - U2 STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 71111 Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity 04/29/2007 05/04/2007 Baseline Inspections PB2-PI&R - BIENNIAL PI&R 5 1, 2 IP 71152B Identification and Resolution of Problems 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/20/2007 08/24/2007 Baseline Inspections PS2-EP - EP INSP 1 1, 2 IP 7111402 Alert and Notification System Testing 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.