MONTHYEARML23324A4332024-01-23023 January 2024 10/16-17/2023 Summary of Routine NRC Site Visit at the Oyster Creek Nuclear Generating Station to Discuss License Termination Plans and Other Technical Topics ML22290A0572022-10-17017 October 2022 Summary of September 27-28, 2022, Routine NRC Site Visit to Discuss License Termination Plans ML20128J2732020-05-0707 May 2020 Summary of April 28, 2020, Teleconference with the National Marine Fisheries Service Regarding Oyster Creek Endangered Species Act Section 7 Consultation ML19295G4922019-10-24024 October 2019 Summary of the October 3, 2019, Public Meeting Near the Oyster Creek Nuclear Generating Station Regarding the Establishment and Operation of Community Advisory Boards ML19170A1182019-06-19019 June 2019 Summary of Teleconference with NMFS Regarding Oyster Creek Endangered Species Act Section 7 Consultation ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18228A5342018-08-31031 August 2018 Summary of 8/15/2018 Pre-Submittal Meeting with Exelon Generation Company, LLC Regarding the License Transfer of Oyster Creek Nuclear Generating Station to Holtec International ML18201A2632018-08-31031 August 2018 Summary of Public Meeting in Forked River, Nj, to Discuss Oyster Creek Nuclear Generating Station Post-Shutdown Decommissioning Activities Report ML18102A1072018-04-18018 April 2018 Annual Assessment Meeting Summary 2018 ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17151A2702017-05-31031 May 2017 Annual Assess Meeting Summary and Attendees ML17075A0172017-03-16016 March 2017 Meeting Summary Memorandum - Regulatory Conference March 9, 2017 ML16307A3162016-11-28028 November 2016 Summary of Public Meeting with Exelon to Discuss Pre-Submittal License Amendment Requests And/Or Exemptions to Part 37 for Decommissioning Plans for Clinton, Quad Cities, and Oyster Creek ML16252A2852016-09-13013 September 2016 Summary of Closed Meeting with the U.S. Nuclear Regulatory Commission & Exelon Generation Company, LLC Regarding Pre-Submittal of Physical Security Licensing Actions Regarding Decommissioning for Oyster Creek Nuclear Generating Station ML16244A0692016-09-0707 September 2016 Summary of August 25, 2016, Closed Meeting with the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding Physical Security Plan, Revision 15 ML16228A0622016-08-15015 August 2016 Summary of July 26, 2016, Public Meeting on Status of Associated Effects Submittals Related to the Reevaluated Flood Hazards at Exelon Generation Company, LLC Sites as Part of the Response to Near-Term Task Force Recommendation 2.1, Floodin ML16195A4482016-07-22022 July 2016 Summary of July 12, 2016, Public Meeting with Exelon to Discuss Decommissioning Transition Plans for Clinton, Quad Cities, and Oyster Creek ML16168A3552016-06-16016 June 2016 Summary of Annual Assessment Public Meeting for Oyster Creek 2016 ML16102A1832016-04-14014 April 2016 Summary of April 6, 2016, Public Meeting with Exelon Generation Company, LLC Regarding Pre-Submittal of Decommissioning Licensing Action Related to Emergency Preparedness for Oyster Creek Nuclear Generating Station (Cac. No. MF7551) ML16040A2182016-02-11011 February 2016 January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers ML16035A1762016-02-11011 February 2016 Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) ML16035A0362016-02-0505 February 2016 February 3, 2016, Summary of Closed Meeting with the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Regarding Security Plan Change for the Oyster Creek Nuclear Generating Station ML15271A1272015-10-23023 October 2015 4 Summary of Meeting with Exelon Generation Company Pre-Submittal of Decommissioning Licensing Actions for Oyster Creek Nuclear Generating Station ML15153A4972015-08-0303 August 2015 Annual Assessment Meeting Summary 2015 ML15125A0262015-05-0505 May 2015 April 27, 2015 Summary of Public Webinar Meeting - Oyster Creek Nuclear Generating Station ML14304A7852014-11-14014 November 2014 Closed Meeting with the Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding the Physical Security License Amendment Request for Oyster Creek Nuclear Generating Station ML14220A5122014-09-0303 September 2014 Summary - Site Visit Regarding Physical Security License Amendment Request for Oyster Creek Nuclear Generating Station ML14175A5182014-08-11011 August 2014 Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic ML13142A4312013-05-22022 May 2013 Summary of Annual Assessment Meeting, Oyster Creek ML12173A1322012-06-21021 June 2012 Summary of Public Meeting with Exelon Generation Company, LLC Regarding Items of Public Interest Related to Oyster Creek Nuclear Generating Station ML12110A3112012-05-0303 May 2012 4/10/2012 Summary of Public Meeting with Exelon Generation Company, LLC Regarding Its Future Submittal of Technical Specification Changes of Licensed Operator Eligibility Requirements ML12114A0472012-04-23023 April 2012 Summary of Public Meeting with Exelon Generation Company, on March 28, 2012 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1036305532011-01-0606 January 2011 Summary of Meeting (Teleconference) with Exelon to Discuss RAI Regarding the Implementation of an Emergency Action Level Scheme Based on NEI 99-01, Rev. 5 ML1020700252010-07-27027 July 2010 Summary of Category 1 Meeting with Exelon to Discuss Re-Submittal of Its Cyber Security Plan ML1015401502010-06-0202 June 2010 Summary of Annual Assessment Meeting, for Oyster Creek ML0930804802009-11-19019 November 2009 Meeting Summary of 10/22/2009 Meeting Regarding Its Power Uprate Project Plan ML0930705002009-11-0505 November 2009 Summary of Meeting with Exelon to Discuss Oyster Creek Nuclear Generating Station and Exelon Fleet Lessons-Learned on Buried Piping Issues ML0927400612009-10-22022 October 2009 Summary of Meeting with Exelon to Discuss Proposed License Amendment Regarding Secondary Containment Operability ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes ML0915301992009-06-0202 June 2009 Summary of Annual Assessment Public Meeting, 5/28/09, with Sign-in Sheets ML0920200532008-12-0505 December 2008 Drop-in Visit- December 5, 2008, Rev 2 ML0833100732008-11-26026 November 2008 Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors ML0812007572008-06-0202 June 2008 Summary of Category 1 Meeting with Exelon to Discuss Current and Planned Licensing Activities and Processes ML0814105622008-05-20020 May 2008 Summary of Annual Assessment Meeting with Amergen Energy Company, LLC ML0802503822008-01-23023 January 2008 Summary - Drop-in Visit from Exelon/Amergen, 1/15/08 ML0709303792007-06-11011 June 2007 Summary of Category 1 Meeting with Exelon to Discuss Current and Planned Licensing Activities and Processes to Discuss Topics of Common Interest to the Reactor Licensing Programs for Exelon and the NRC Staff 2024-01-23
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML20128J2732020-05-0707 May 2020 Summary of April 28, 2020, Teleconference with the National Marine Fisheries Service Regarding Oyster Creek Endangered Species Act Section 7 Consultation ML0914903502009-05-28028 May 2009 Conversation Record - NRC Form 699: Response to Request for Information from the May 28, 2009, Oyster Creek Station Annual Assessment Meeting ML0819101342008-06-27027 June 2008 Conversation Records, Response to Request for Information from the May 15, 2008 Oyster Creek Annual Assessment Meeting ML0712400082007-05-0303 May 2007 Drywell Trench Photographs During 4/29/07 Maintenance Outage ML0630502482006-10-25025 October 2006 2006/10/25 - Conversation Record Between Ms. Janet Tauro (Stakeholder) and Mr. Marc Ferdas, SRI, Response to Question from September 13, 2006 Oyster Creek License Renewal Public Meeting ML0625102242006-09-0808 September 2006 Summary of Telephone Conference Calls Held on July 6,& July 7, 2006, Between the NRC & Amergen Energy Company, LLC, Concerning Clarification of Requests for Additional Information Pertaining to the Oyster Creek Nuclear Generating Station LR ML0622706312006-08-11011 August 2006 2006/08/11-Summary of Telephone Conference Call Held on April 12, 2006, Between the USNRC & Amergen Energy Co., LLC Re Response to a Request for Additional Information Pertaining to the Oyster Creek License Renewal Application ML0619302322006-07-0707 July 2006 06/20/2006 Conversation Record of Response to Questions from Oyster Creek 2005 Annual Assessment Public Meeting on April 24, 2006 ML0615000712006-05-24024 May 2006 Phone Conversation Record by Mr. Marc Ferdas, NRC, Oyster Creek, Speaking to a Public Stakeholder, Mr. Donald Warren in Regards to Questions Asked at Annual Assessment Public Meeting ML0605902602006-04-10010 April 2006 2006/04/10-Summary of Telephone Conference Call Held 02/02/2006, Between the U.S. NRC & Amergen Energy Company, LLC, Concerning Draft Request for Additional Information Pertaining to Oyster Creek Nuclear Generating Station, License Renewal ML0606704802006-03-0505 March 2006 2006/03/05- Telecommunication with Amergen Energy Company, LLC, to Discuss Requests for Additional Information Pertaining to NRC Staff'S Review of the Severe Accident Mitigation Alternative (SAMA) Analysis in the Oyster Creek License Renewa ML0605803452006-02-24024 February 2006 Summary of a Telephone Conference Call Held on 01/26/2006, Between the U.S. Nuclear Regulatory Commission & Amergen Energy Company, LLC, Concerning Draft Request for Additional Information, Pertaining to the Oyster Creek Nuclear Generating ML0603102362006-01-30030 January 2006 Summary of a Telephone Conference Call Held on December 20, 2005, Between the U.S. Nuclear Regulatory Commission and Amergen Energy Company ML0608100412005-11-30030 November 2005 2005/11/30-Request for Additional Information Regarding the Environmental License Renewal Review for the Oyster Creek Nuclear Generating Station (Nu) ML0532901412005-11-17017 November 2005 Telecon Record, Donald Warren and Marc Ferdas ML0713401582003-08-15015 August 2003 EDO Call for August 15, 2003; Update on Reintegration of Bargaining Unit Employees at Oyster Creek ML0713401542003-08-0808 August 2003 EDO Call for August 8, 2003; Labor Agreement Reached and Ratified at Oyster Creek ML0713401382003-05-27027 May 2003 Summary of Oyster Creek Issues & Concerns Raised to Bill Levis, Sr. VP, Mid-Atlantic Rog 2020-05-07
[Table view] Category:Verbal Comm
MONTHYEARML20128J2732020-05-0707 May 2020 Summary of April 28, 2020, Teleconference with the National Marine Fisheries Service Regarding Oyster Creek Endangered Species Act Section 7 Consultation ML0914903502009-05-28028 May 2009 Conversation Record - NRC Form 699: Response to Request for Information from the May 28, 2009, Oyster Creek Station Annual Assessment Meeting ML0819101342008-06-27027 June 2008 Conversation Records, Response to Request for Information from the May 15, 2008 Oyster Creek Annual Assessment Meeting ML0712400082007-05-0303 May 2007 Drywell Trench Photographs During 4/29/07 Maintenance Outage ML0630502482006-10-25025 October 2006 2006/10/25 - Conversation Record Between Ms. Janet Tauro (Stakeholder) and Mr. Marc Ferdas, SRI, Response to Question from September 13, 2006 Oyster Creek License Renewal Public Meeting ML0625102242006-09-0808 September 2006 Summary of Telephone Conference Calls Held on July 6,& July 7, 2006, Between the NRC & Amergen Energy Company, LLC, Concerning Clarification of Requests for Additional Information Pertaining to the Oyster Creek Nuclear Generating Station LR ML0622706312006-08-11011 August 2006 2006/08/11-Summary of Telephone Conference Call Held on April 12, 2006, Between the USNRC & Amergen Energy Co., LLC Re Response to a Request for Additional Information Pertaining to the Oyster Creek License Renewal Application ML0619302322006-07-0707 July 2006 06/20/2006 Conversation Record of Response to Questions from Oyster Creek 2005 Annual Assessment Public Meeting on April 24, 2006 ML0615000712006-05-24024 May 2006 Phone Conversation Record by Mr. Marc Ferdas, NRC, Oyster Creek, Speaking to a Public Stakeholder, Mr. Donald Warren in Regards to Questions Asked at Annual Assessment Public Meeting ML0605902602006-04-10010 April 2006 2006/04/10-Summary of Telephone Conference Call Held 02/02/2006, Between the U.S. NRC & Amergen Energy Company, LLC, Concerning Draft Request for Additional Information Pertaining to Oyster Creek Nuclear Generating Station, License Renewal ML0606704802006-03-0505 March 2006 2006/03/05- Telecommunication with Amergen Energy Company, LLC, to Discuss Requests for Additional Information Pertaining to NRC Staff'S Review of the Severe Accident Mitigation Alternative (SAMA) Analysis in the Oyster Creek License Renewa ML0605803452006-02-24024 February 2006 Summary of a Telephone Conference Call Held on 01/26/2006, Between the U.S. Nuclear Regulatory Commission & Amergen Energy Company, LLC, Concerning Draft Request for Additional Information, Pertaining to the Oyster Creek Nuclear Generating ML0603102362006-01-30030 January 2006 Summary of a Telephone Conference Call Held on December 20, 2005, Between the U.S. Nuclear Regulatory Commission and Amergen Energy Company ML0608100412005-11-30030 November 2005 2005/11/30-Request for Additional Information Regarding the Environmental License Renewal Review for the Oyster Creek Nuclear Generating Station (Nu) ML0532901412005-11-17017 November 2005 Telecon Record, Donald Warren and Marc Ferdas ML0713401582003-08-15015 August 2003 EDO Call for August 15, 2003; Update on Reintegration of Bargaining Unit Employees at Oyster Creek ML0713401542003-08-0808 August 2003 EDO Call for August 8, 2003; Labor Agreement Reached and Ratified at Oyster Creek ML0713401382003-05-27027 May 2003 Summary of Oyster Creek Issues & Concerns Raised to Bill Levis, Sr. VP, Mid-Atlantic Rog 2020-05-07
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24284A2032024-10-16016 October 2024 Enclosure 2 Revised Pending Request for Additional Information ML24284A1962024-10-16016 October 2024 Enclosure 1 Revised Request for Supplemental Information ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24269A0492024-10-0404 October 2024 Enclosure 1, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Request for Supplemental Information ML21099A0442021-04-0808 April 2021 Enclosure - Request for Additional Information Related to Request for Approval of Oyster Creek Nuclear Generating Station Independent Spent Fuel Storage Installation Only Emergency Plan Holtec Decommissioning International, LLC ML20335A3102020-11-30030 November 2020 RAI November 2020 Part 73 FOF Exemption Request ML20297A2382020-10-22022 October 2020 Fleet DQAP RAIs - Enclosure ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20134H8732020-05-12012 May 2020 E-mail - Request for Additional Information: Oyster Creek Request for Temporary Exemption from Part 73, Appendix B Requirements ML19263D2142019-09-20020 September 2019 Hdi PSDAR Environmental RAI Enclosure (002) ML19158A2772019-05-28028 May 2019 NRR E-mail Capture - Oyster Creek ESA Consultation: Information Requests from NMFS ML19025A1172019-01-24024 January 2019 NRR E-mail Capture - for Your Action - RAI for Oyster Creek EP Exemption (Change to Adiabatic Heat-Up Calculation) ML18256A0022018-09-12012 September 2018 NRR E-mail Capture - for Your Action: RAIs for Oyster Creek Post Shutdown Decommissioning Activities Report (PSDAR) ML18135A0732018-05-15015 May 2018 NRR E-mail Capture - RAIs - Oyster Creek - Request Approval of the Decommissioning Quality Assurance Program ML18068A6582018-03-0909 March 2018 NRR E-mail Capture - RAIs - Oyster Creek Defueled TS LAR ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML18024B0642018-01-24024 January 2018 NRR E-mail Capture - for Your Action - RAI for Oyster Creek Permanently Defueled EP and EAL Scheme LAR (CAC No. MG0160; EPID: L-2017-LLA-0307) ML18012A0782018-01-12012 January 2018 NRR E-mail Capture - for Your Review - Draft RAI for Oyster Creek Permanently Defueled EP and EAL Scheme LAR (CAC No. MG0160; EPID: L-2017-LLA-0307) ML18003A4122018-01-0303 January 2018 NRR E-mail Capture - for Your Action - RAI - Oyster Creek BWRVIP LAR (CAC No. MG0180; EPID No. L-LLA-2017-0304) ML17320A6372017-11-16016 November 2017 NRR E-mail Capture - Oyster Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request for Emergency Plan Exemption (CAC No. MG0153; EPID L-2017-LLE-0020) ML17319A9422017-11-15015 November 2017 NRR E-mail Capture - Oyster Creek Nuclear Generating Station - Request for Additional Information Regarding License Amendment Request for Emergency Plan Exemption (CAC No. MG0153; EPID L-2017-LLE-0020) ML17208A7472017-09-14014 September 2017 Request for Additional Information, License Amendment Request to Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition ML17136A3852017-05-12012 May 2017 NRR E-mail Capture - (External_Sender) Oyster Creek Response to NRC Flood MSA Audit Review Questions ML17038A5152017-02-0303 February 2017 NRR E-mail Capture - (External_Sender) Oyster Creek Nuclear Generating Station Response to Environmental Questions Regarding the Mitigating Strategies Final Integrated Plan and SPF Instrumentation Compliance Letter ML16244A3112016-10-0707 October 2016 Request for Additional Information Regarding License Amendment Request for Technical Specifications Section 6.0, Administrative Controls for Permanently Defueled Condition ML16125A2452016-05-16016 May 2016 Request for Additional Information Regarding Request for Approval of a Certified Fuel Handler Training and Retraining Program ML16060A1722016-03-0707 March 2016 Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Spent Fuel Management Program ML16056A0012016-02-24024 February 2016 NRR E-mail Capture - Request for Additional Information - Oyster Creek Security Plan - Revision 14 ML17144A3702015-05-0606 May 2015 NRC Email J. Hughey( NRC) to Dave Distel (Exelon)- Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109, Dated May 6, 2015 ML15005A0692015-01-0606 January 2015 Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML14252A7032014-09-17017 September 2014 Request for Additional Information Regarding Preliminary Decommissioning Cost Estimate and Annual Decommissioning Funding Status Reports ML14246A5182014-09-17017 September 2014 Request for Additional Information Regarding the Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML14247A5862014-09-16016 September 2014 Request for Additional Information Regarding License Amendment Request to Revise Snubber Surveillance Requirements (Tac No. MF4124) ML14114A5632014-09-10010 September 2014 Request for Additional Information Regarding License Amendment Request Related to Reactor Building Vital Area Access Control ML14220A0272014-08-27027 August 2014 Request for Additional Information Regarding Request for Extension to Comply with NRC Order EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML14083A1602014-03-31031 March 2014 Request for Additional Information Regarding Bulletin 2012-01, Design Vulnerability in Electric Power System ML13351A3142013-12-20020 December 2013 Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. ML13268A0312013-11-0808 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13227A3042013-08-28028 August 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML12229A4332012-09-0606 September 2012 Request for Additional Information Regarding Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 12 (TAC No. D91660) ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12032A1872012-02-21021 February 2012 Request for Additional Information Related to the Response to License Renewal Commitment No. 10 Regarding Thermal Aging Irradiation Embrittlement of Cast Austenitic Stainless Steel ML12025A2542012-01-23023 January 2012 Request for Additional Information - License Renewal Commitment Regarding Thermal Aging and Neutron Irradiation Embrittlement of CASS Materials ML1200603242012-01-19019 January 2012 Fleet, RAI, Proposed Alternative to Use American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-789 (N-789) 2024-10-04
[Table view] |
Text
April 10, 2006LICENSEE:AmerGen Energy Company, LLC FACILITY:Oyster Creek Nuclear Generating Station
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 2, 2006, BETWEEN THE U.S. NUCLEAR REGULATORYCOMMISSION AND AMERGEN ENERGY COMPANY, LLC, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE OYSTER CREEK NUCLEAR GENERATING STATION, LICENSE RENEWALAPPLICATIONThe U.S. Nuclear Regulatory Commission staff (NRC or the staff), and representatives ofAmerGen Energy Company, LLC (AmerGen), held a telephone conference call on February 2, 2006, to discuss and clarify the staff's draft request for additional information (D-RAI) concerning the Oyster Creek Nuclear Generating Station license renewal application (LRA). The conference call was useful in clarifying the intent of the staff's D-RAI.Enclosure 1 provides a listing of the conference call participants. Enclosure 2 contains a listingof the D-RAI discussed with the applicant, including a brief description on the status of the items.The applicant had an opportunity to comment on this summary./RA/Donnie J. Ashley, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-219
Enclosures:
As statedcc w/encls: See next page
DOCUMENT NAME: E:\Filenet\ML060590260.wpdOFFICEPM:RLRALA:DLRBC:RLRANAMEDAshleyYEdmonds LLund DATE04/10/0602/27/0602/2706 Oyster Creek Nuclear Generating Station cc:Site Vice President - Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC
P.O. Box 388 Forked River, NJ 08731Senior Vice President of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348Kathryn M. Sutton, EsquireMorgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004Kent Tosch, ChiefNew Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Mayor of Lacey Township818 West Lacey Road Forked River, NJ 08731Senior Resident InspectorU.S. Nuclear Regulatory Commission
P.O. Box 445 Forked River, NJ 08731Director - Licensing and Regulatory AffairsAmerGen Energy Company, LLC Correspondence Control
P.O. Box 160 Kennett Square, PA 19348Manager Licensing - Oyster CreekExelon Generation Company, LLC Correspondence Control
P.O. Box 160 Kennett Square, PA 19348Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC
P.O. Box 388 Forked River, NJ 08731Assistant General CounselAmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348Ron Bellamy, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Correspondence Control DeskAmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348Oyster Creek Nuclear Generating StationPlant Manager AmerGen Energy Company, LLC
P.O. Box 388 Forked River, NJ 08731License Renewal ManagerExelon Generation Company, LLC 200 Exelon Way, Suite 230 Kennett Square, PA 19348 Oyster Creek Nuclear Generating Station cc:Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Mr. Michael P. GallagherVice President License Renewal Exelon Generation Company, LLC 200 Exelon Way, Suite 230 Kennett Square, PA 19348Mr. Christopher M. CranePresident and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Note to: AmerGen Energy Company, LLC, Facility: Oyster Creek Nuclear Generating Stationfrom Donnie Ashley dated April 10, 2006.
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 2, 2006, BETWEEN THE U.S. NUCLEAR REGULATORYCOMMISSION AND AMERGEN ENERGY COMPANY, LLC, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE OYSTER CREEK NUCLEAR GENERATING STATION, LICENSE RENEWALAPPLICATIONAdams accession no.: ML060590260DISTRIBUTION
- HARD COPYDLR R/FE-MAIL:JFairRWeisman AMurphy RPettis GGalletti CLi GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff
RLaufer GMiller RBellamy, RI RCureton, RI JLilliendahl, RIMModes, RI MSykes, RI AHodgdon RidsOpaMail LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALLTO DISCUSS THE OYSTER CREEK NUCLEAR GENERATING STATIONLICENSE RENEWAL APPLICATIONFebruary 2, 2006Participants AffiliationsDonnie AshleyU.S. Nuclear Regulatory Commission (NRC)Vijay GoelNRC Don WarfelAmerGen Energy Company, LLC (AmerGen)
George BeckAmerGen Deb SpamerAmerGen DRAFT REQUESTS FOR ADDITIONAL INFORMATION (D-RAI)OYSTER CREEK NUCLEAR GENERATING STATIONLICENSE RENEWAL APPLICATIONFebruary 2, 2006The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of AmerGenEnergy Company, LLC (AmerGen), held a telephone conference call on February 2, 2006, to discuss and clarify the staff's draft request for additional information (D-RAI) concerning the Oyster Creek Nuclear Generating Station, license renewal application (LRA). The following D-RAIs were discussed during the telephone conference call.D-RAI 2.5.2-1In Section 2.5.2.2 of the LRA, the applicant identified Phase Bus and Switchyard Bus aselectrical component commodity groups which meet the criteria of 10 CFR 54.21(a)(1)(I) and are subject to an aging management review (AMR). However, in Section 2.5.2.3 of the LRA, the Phase Bus and Switchyard Bus commodity groups were eliminated from AMR based on the assertion that none perform a license renewal function. Resolve the conflicting positions in Section 2.5.2.2 and in Section 2.5.2.3 of the LRA, and provide an explanation ofwhy the Phase Bus or Switchyard Bus is not considered to perform any of the license renewal functions listed in 10 CFR 54.4(a), and is not subject to AMR. If a section of the Phase Bus or Switchyard Bus performs any of the license renewal functions listed in 10 CFR 54.4(a), it must be subject to an AMR per the criteria of 10 CFR 54.21(a)(1)(I) (i.e., performs an intended function without moving parts).Discussion: Following discussions, this question was withdrawn/D-RAI 2.5.2-2In Section 2.5.2.5 of the LRA, the electrical commodity groups subject to AMR are described.Confirm that, in addition to power circuits in the electrical systems, the associated controlcircuits are also considered in the scoping and screening review, and are included in the electrical commodity groups subject to AMR.
Discussion: The applicant indicated that the question is clear. This D-RAI will be renumberedand sent as a formal RAI. D-RAI 2.5.2.3-1In Section 2.5.2.3, the first bullet states: "phase bus exists only in the Main Generator andAuxiliaries System. That system has no electrical intended functions and is in scope for 10 CFR 54.4(a)(2) systems interaction only.
Because the phas e bus contains no fluid, it has nolicense renewal intended functions." Regarding the above first bullet, provide additional information for the following:a. Provide cross-reference to the phase bus that exists in the SBO path.b.Confirm whether the Phase Bus (in the Main Generator and Auxiliaries System)provides interactions for 10 CFR 54.4(a)(2) systems? If yes, list the 10 CFR 54.4(a)(2) systems. If 10 CFR 54.4(a)(2) is applicable to this Phase Bus,explain why this Phase Bus is not included as an Electrical Commodity Group subject to AMR.c.Explain the purpose of the statement: "Because the phase bus contains no fluid, ithas no license renewal intended functions".Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as aformal RAI. D-RAI 2.5.2.3-2In Section 2.5.2.3, the second bullet states: "Switchyard Bus was eliminated because noneperform a license renewal intended function. Rather, transmission conductors, high voltage insulators and insulated cables and connectors which perform the functions of providing offsite power to cope with and recover from regulated events."Regarding the above bullet, list (providing reference to license renewal Drawing No. LR-BR-3000) the circuits that may contain transmission conductors, high voltage insulators, and insulated cables and connectors which perform the functions of providing offsite power to cope with and recover from regulated events. List the regulated events.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as aformal RAI. D-RAI 2.5.2.5-1In Section 2.5.2.5.3, it is stated that the high voltage insulators are provided on the circuits usedto supply power from the switchyard to plant buses during recovery from a station blackout or fire protection event. Describe the circuit path (which may contain the high voltage insulators) which is relied upon tosupply power from the switchyard to plant buses in case of the fire protection event.
Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as aformal RAI. D-RAI 2.5.2.5-2In Section 2.5.2.5.4, it is stated that the transmission conductors provide a portion of the circuitsused to supply power from the switchyard to plant buses during recovery from a station blackout or fire protection event.
Describe the circuit path (which may contain transmission conductors) which is relied upon to supply power from the switchyard to plant buses in case of the fire protection event. Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as aformal RAI.