05000368-06-302 - Arkansas Nuclear One, Unit 2 - Notification of NRC Initial Operator Licensing Examination (Examination Report 05000368/2006302)
ML060550401
Person / Time
Site: Arkansas Nuclear 
Issue date: 02/23/2006
From: Gody A
Operations Branch IV
To: Forbes J
Entergy Operations
References
50-368/06-302, ER-06-302
Download: ML060550401 (4)


See also: IR 05000368/2006302

Text

February 23, 2006

Jeffrey S. Forbes

Vice President Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, AR 72801-0967

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 - NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION (EXAMINATION

REPORT 05000368/2006302)

Dear Mr. Forbes:

In a telephone conversation on February 9, 2006, between Messrs. T. Mayfield, Arkansas Nuclear

One, Unit 2, Operations Training Supervisor, and P. Gage, Chief Examiner, arrangements were

made for the administration of licensing examinations at Arkansas Nuclear One, Unit 2, during

the weeks of July 17 and 24, 2006.

As agreed during the telephone conversation, your staff will prepare the examinations based on the

guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for Power

Reactors. The NRCs regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your support for onsite validation of the

examination is required during the week of June 26, 2006.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by April 10, 2006. The written examinations, operating tests, and supporting reference

materials identified in Attachment 2 to ES-201 and as specified by the chief examiner will be

due by May 19, 2006. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal

Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall

approve the outlines, examinations, and tests before they are submitted to the NRC for review

and approval. All materials shall be complete and ready-to-use. We request that any personal,

proprietary, sensitive unclassified, or safeguards information in your response be contained in a

separate enclosure and appropriately marked. Any delay in receiving the required examination

and reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Entergy Operations, Inc.

-2-

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be

in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments on any aspect of

this collection of information, including suggestions for reducing the burden, to the Information

and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of

Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to,

an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosures will be available electronically for public inspection in the NRCs Public

Document Room or from the Publicly Available Records (PARS) component of the NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the Electronic Reading Room page of the NRCs public Web site at

http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Mayfield has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Gage at (817) 860-8273, or Mr.

Gody at (817) 860-8159.

Sincerely,

/RA/

A.T. Gody, Chief

Operations Branch

Division of Reactor Safety

Entergy Operations, Inc.

-3-

Dockets: 50-368

Licenses: NPF-6

Distribution:

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, MD 20852

County Judge of Pope County

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

Winston & Strawn LLP

1700 K Street, N.W.

Washington, DC 20006-3817

Bernard Bevill

Radiation Control Team Leader

Division of Radiation Control and

Emergency Management

Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

Little Rock, AR 72205-3867

James Mallay

Director, Regulatory Affairs

Framatome ANP

3815 Old Forest Road

Lynchburg, VA 24501

Entergy Operations, Inc.

-4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (RWD)

Branch Chief, DRP/E (DNG)

Senior Project Engineer, DRP/E (VGG)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

SUNSI Review Completed: __Y____ADAMS: #Yes

G No Initials: _PCG_____

  1. Publicly Available G Non-Publicly Available G Sensitive
  1. Non-Sensitive

SOE:OB

C:OB

PCGage / lmb

ATGody

/RA/

/RA/

2/23/2006

2/23/2006

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax