R. E. Ginna, Fitness for Duty Program Performance Data Report
ML060540112
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/15/2006
From: Korsnick M
Constellation Energy Group, Constellation Generation Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060540112 (3)


Text

Maria Korsnick R.E. Ginna Nuclear Power Plant, LLC Site Vice President 1503 Lake Road Ontario, New York 14519-9364 585.771.3494 585.771.3943 Fax maria.korsnickicostellation.com Constellation Energye A_ Generation Group February 15, 2006 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Fitness for Duty Program Performance Data Report In accordance with the requirements set forth in 10 CFR 26.71 (d), R.E. Ginna Nuclear Power Plant, LLC has compiled and is submitting the enclosed semi-annual Fitness for Duty (FFD) Program Performance Data Report covering the period July 1, 2005 through December 31, 2005.

Very truly yours, 4

Mary G. K nck Enclosure cc: S. J. Collins, NRC P. D. Milano, NRC Resident Inspector, NRC 4Oc-I-I00

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 CONSTELLATION ENERGY GRFOUP 12/31/2005 Company 6 Months Ending R.E. Ginna Nuclear Power Plant Tammy L. Huffer, Fitness for Duty Administrator (585) 771-5285 Contact Name Phone)

CUTOFFS: Screen/Confirmation (ng/ml) [X] Appendix A to 10 CFR Part 26 Marijuana 50/15 Amphetamines Cocaine Phencyclidine Opiates Alcohol (% BAC)

Annual (Jan-D ec) Random testing rates: Employees & Contractors by 50%.

Long-term Short-term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 440 125 218 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 6 lt9 0 175 5 For Cause Post-accident 1 0 0 0 0 Observed Behavior 2 1 0 0 3 0 Random 118 _ 2 24 0 66 1 Follow-up 7 '2 3 0 6 0 Other* 0 3 0 0 1 0 TOTAL 134 1 36 0 251 6**

1_=

Long Term Contractors: Wackenhut security and fire brigade

  • Refers to a sample that was hydrated (diluted) and therefore had to be recollected.
    • The total number of Positive Short-term Contractor Personnel on this page differs from the breakdown on the next page due to not including one refusal to test.

BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Aiphe- Phency- Alcohol Refusal Total tamines lidinetoes Licensee Employees 0 1 0 0 0 0 0 1 Long-Term Contractors 0 0 0 0 0 0 0 0 Short-Term Contractors 6 0 0 0 0 0 1 7 TOTAL 6 1 0 0 0 0 1 8**

$* The total number of Positive Short-term Contractor Personnel on this page differs from the breakdown on the prior page due to inclusion of one refusal to test.

Situation Descriptions:

1. One (1) employee was confirmed positive for cocaine as a result of a for cause test.
2. Six (6) short term contractors were confirmed positive for marijuana as a result of pre-access tests.
3. One (1) short term contractor left the building prior to his collection being completed resulting in a refusal to test.

Management Actions:

All individuals were denied unescorted access.

A review of safety-related work was performed, where applicable. No remedial actions were required.

NRC Reportable Events (Per 10CFR Part 26.73)

There were no reportable events during this performance data period.