ML060440063

From kanterella
Jump to navigation Jump to search
Handouts for Meeting with Nuclear Management Co., to Discuss Removing Trisodium Phosphate from the Containment at Palisades
ML060440063
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/02/2006
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML060440063 (9)


Text

SM fo,,,.,.,;++^td to NMC AfioCI^^#EXe-n~

UU1111I1IILLWU LU. IVUL#WOCI L.AUC7ICI~IIL Proposed License Amendment Palisades Nuclear Plant February 2, 2006

T =}

Proposed License Amendment Agenda 0 Purpose 0

Objectives Proposed Amendment a

Discussion k

Summary I I , 1t 1 I

S Conclusion I 1-, 1 leX NMIW

/I 1

W..,\

rig

Proposed License Amendment Purpose

  • Discuss proposed license amendment request to remove TSP to further reduce the risk associated with the uncertainty of GSI-191 chemical effects until final resolution by December 2007 Objective
  • Confirm approach and scope of proposed license amendment I -1 I

"I I.

NMC

&1W4WA)h4 2

,fI-I I/

Proposed License Amendment Overview of Discussion

  • Design and Licensing Bases
  • Impact on Radiological Design Basis Analyses
  • Current licensing basis is TID-14844 methodology Technical Specification Chanae IN I -

I3 NMC COO~_ A~W ,

3 1

Proposed License Amendment Design and Licensing Bases Considerations

  • Post-accident sump pH control
  • Retention of radioiodine in sump water/leakage
  • Corrosion rates
  • Rates in non-neutral pH solutions are increased
  • Equipment Environmental Qualification  ;, I components
  • On-going evaluations "I \\

NMI CNIVIae e'

I/

4 OF

Proposed License Amendment Impact on Radiological Analyses

  • Retention of radioiodine in sump water
  • Spray removal and retention would not be credited due to loss of pH control
  • Preliminary analyses indicate
  • 10 CFR 100 limits will be met Predicted dose increases but remain within acceptable limits
  • Predicted dose increases but remain within "I,. I-acceptable limits with KI and use of Tracer Gas I--

test results C4ftO"to*%

NoM 5

Proposed License Amendment Schedule 0 Timeline

  • Amendment submittal planned by March 31, 2006
  • TSP to be removed after approval I x, NIwq _V~AM 6

'roposed License Amendment Summary k.

IA NMC 7

a *4 I[Proposed License Amendment Conclusion

/t

/I NMi C4%"www I

8 /

.- /