Handouts for Meeting with Nuclear Management Co., to Discuss Removing Trisodium Phosphate from the Containment at Palisades
ML060440063
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/02/2006
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML060440063 (9)


Text

NMC fo,,,.,.,;++^td to AfioCI^^#EXe-n~

UU1111I1IILLWU LU. IVUL#WOCI L.AUC7ICI~IIL Proposed License Amendment Palisades Nuclear Plant February 2, 2006 SM

T

=}

Proposed License Amendment Agenda 0

0 a

Purpose Objectives Proposed Amendment Discussion Summary Conclusion S

k I

1-, 1

/I leX W..,\\

rig I

I I

1t 1 NMIW 1

Proposed License Amendment Purpose

  • Discuss proposed license amendment request to remove TSP to further reduce the risk associated with the uncertainty of GSI-191 chemical effects until final resolution by December 2007 Objective
  • Confirm approach and scope of proposed license amendment I

-1 2

I I

"I

/

,fI-I I

NMC <

&1W4WA)h4

Proposed License Amendment Overview of Discussion

  • Design and Licensing Bases
  • Impact on Radiological Design Basis Analyses
  • Current licensing basis is TID-14844 methodology Technical Specification Chanae IN I3 3

1 I

NMC COO~_ A~W,

Proposed License Amendment Design and Licensing Bases Considerations

  • Post-accident sump pH control
  • Retention of radioiodine in sump water/leakage
  • Corrosion rates
  • Rates in non-neutral pH solutions are increased
  • Equipment Environmental Qualification components
  • On-going evaluations I

4 "I

\\\\

e' I/

NMI CNIVIae

.,OF

Proposed License Amendment Impact on Radiological Analyses

  • Retention of radioiodine in sump water
  • Spray removal and retention would not be credited due to loss of pH control
  • Preliminary analyses indicate
  • 10 CFR 100 limits will be met Predicted dose increases but remain within acceptable limits
  • Predicted dose increases but remain within acceptable limits with KI and use of Tracer Gas test results "I,.

I--

I-NoM C4ftO"to*%

5

Proposed License Amendment Schedule 0 Timeline

  • Amendment submittal planned by March 31, 2006
  • TSP to be removed after approval I

x, NIwq _V~AM 6

'roposed License Amendment Summary k.

IA NMC 7

a

  • 4 I[Proposed License Amendment Conclusion

/t /I NMi C4%"www 8