ML060390541

From kanterella
Jump to navigation Jump to search
TRM 1 - Technical Manual Unit 1, Rev. 2
ML060390541
Person / Time
Site: Susquehanna  
Issue date: 01/30/2006
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060390541 (10)


Text

Jan. 30, 2006 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-4768 USE INFORMATIO

+

Name:G H*SE M Address: NU Phone#:

4-319 T

ITTAL INFORMATION:

EMPL#:028401 CA#:0363 TO:

01/30/2006 LOCATION:

FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no N)C will be issued with the updated material.

TRM1 -

TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/18/2006 ADD MANUAL TABLE OF CONTENTS DATE: 01/27/2006 CATEGORY: DOCUMENTS TYPE: TRM1 ID:

TEXT 3.3.6 REPLACE:

REV:2 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

n' at

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.

APPLICABILITY:

As specified in Table 3.3.6-1 ACTIONS

_----- - NOTESE--

1.

Penetration flow paths isolated to comply with Action C may be unisolated intermittently I under administrative controls.

2.

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 1.a and 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 1.a and 2.a B. One or more Functions with B.1 Restore isolation capability.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C. Required Action and C.l Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time compensatory measures for of Condition A or B not met.

the degraded condition.

SUSQUEHANNA - UNIT 1 TIRM / 3.3-13 EFFECTIVE DATE 09/13/2005

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 TECHNICAL REQUIREMENT SURVEILIANCE NOTES --

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY-TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME: TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 1 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 TABLE 3.3.6-1 (Page 1 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS VALUE

1. Main Steam Line Isolation
a. Reactor Building 1,2,3 2

TRS 3.3.6.2 s 1080F Main Steam Tunnel TRS 3.3.6.3 A Temperature - High TRS 3.3.6.5

b. Turbine Building 1,2,3 2

TRS 3.3.6.2

TRS 3.3.6.5 High

2.

Primary Containment Isolation

a. Main Steam Line 1,2,3 2

TRS 3.3.6.1 s 21 x full power Radiation - High, High -

-TRS 3.3.6.2 background without l TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)

3.

High Pressure Coolant Injection (HPCI) System Isolation

a.

HPCI Pipe Routing 1,2,3 1

TRS 3.3.6.2 S 98'F Area A Temperature -

TRS 3.3.6.3 High TRS 3.3.6.5

b.

HPCI Equipment Room 1,2,3 1

TRS 3.3.6.2 s 980F A Temperature - High TRS 3.3.6.3 TRS 3.3.6.5 (continued)

(a) Radiation detectors are exempt from response time testing.

SUSQUEHANNA - UNIT 1 TRM / 3.3-15 EFFECTIVE DATE 10/22/2003

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 TABLE 3.3.6-1 (Page 2 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE FUNCTION

4.

Reactor Core Isolation Cooling (RCIC) System Isolation

a. RCIC Pipe Routing Area A Temperature -

High

b. RCIC Equipment Room A Temperature - High 1,2,3 1,2,3 I

I TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5

  • 980F
  • 980F
5.

Reactor Water Cleanup (RWCU) System Isolation

a.

RWCU Penetration Area A Temperature -

High

b. RWCU Pump Area A Temperature - High
c.

RWCU Heat Exchanger Area A Temperature -

High

6.

Shutdown Cooling System

-Isolation (a) 1,2,3 1,2,3 1,2,3 I

1 I

TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 TRS 3.3.6.2 TRS 3.3.6.3 TRS 3.3.6.5 s 720F

  • 720 F s 720F I
a.

RHR Flow - High 3,4,5 I

TRS 3.3.6.1 TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5

< 26,000 gpm (a)

Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.

SUSQUEHANNA - UNIT 1 TRM!, 3.3-16 EFFECTIVE DATE 06/27/2001

Jan. 30, 2006 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2006-4862 USER INFORMATION:

Name:GERLACH*ROSE M EMPL#:028401 CA#:0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 01/30/2006 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YfOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD :3E UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no nC will be issued with the updated material.

....r,.

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/13/2006 ADD MANUAL TABLE OF CONTENTS DATE: 01/27/2006 CATEGORY:

ID:

TEXT REPLACE:

DOCUMENTS TYPE:

TRM2 3.3.6 REV:2 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS C X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.

APPLICABILITY:

As specified in Table 3.3.6-1 ACTIONS A______-----------N OTES

1.

Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.

2.

Separate Condition entry is allowed for each channel.

_ ~~ ~ ~ ~ ~ ~~~~~ ~

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 1.a and 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions l.a and 2.a B. One or more Functions with B.1 Restore isolation capability.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C.

Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion compensatory measures for Time of Condition A or B the degraded condition.

not met.

SUSQUEHANNA - UNIT 2 TRM / 3.3-13 EFFECTIVE DATE 09/13/2005

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 TECHNICAL REQUIREMENT SURVEILLANCE

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 2 TR.M /3.3-14 EFFECTIVE DATE 12/1411998

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 TABL.E 3.3.6-1 (Page 1 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE

1. Main Steam Line Isolation
a. Reactor Building 1,2,3 2

TRS 3.3.6.2

TRS 3.3.6.5 High

b. Turbine Building 1,2,3 2

TRS 3.3.6.2

- High

2.

Primary Containment Isolation

a. Main Steam Line 1,2,3 2

TRS 3.3.6.1 s 21 x full power Radiation - High TRS 3.3.6.2 background without High TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)

3. High Pressure Coolant Injection (HPCI) System Isolation
a. HPCI Pipe Routing 1,2,3 1

TRS 3.3.6.2 s 980F Area A Temperature TRS 3.3.6.3

- High TRS 3.3.6.5

b. HPCI Equipment 1,2,3 1

TRS 3.3.6.2

  • 980F Room TRS 3.3.6.3 A Temperature -

TRS 3.3.6.5 High (continued)

I (a) Radiation detectors are exempt from response time testing.

SUSQUEHANNA - UNIT 2 TRM / 3.3-15 EFFECTIVE DATE 10/22/2003

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 2 TABLE 3.3.6-1 (Page 2 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE

4.

Reactor Core Isolation Cooling (RCIC) System Isolation

a.

RCIC Pipe 1,2,3 1

TRS 3.3.6.2

  • 980F Routing Area TRS 3.3.6.3 A Temperature -

TRS 3.3.6.5 High

b.

RCIC Equipment 1,2,3 1

TRS 3.3.6.2

  • 98°F Room TRS 3.3.6.3 A Temperature -

TRS 3.3.6.5 High

5.

Reactor Water Cleanup (RWCU) System Isolation

a.

RWCU

-1,2,3 1

TRS.3.3.6.2

TRS 3.3.6.5 High

b.

RWCU Pump Area 1,2,3 1

TRS 3.3.6.2

  • 720F A Temperature -

TRS 3.3.6.3 High TRS 3.3.6.5

c.

RWCU Heat 1,2,3 1

TRS 3.3.6.2

  • 720F Exchanger Area TRS 3.3.6.3 A Temperature -

TRS 3.3.6.5 High

6.

Shutdown Cooling System Isolation (a)

a.

RHR Flow - High 3,4,5 1

TRS 3.3.6.1

  • 26,000 gpm TRS 3.3.6.4 TRS 3.3.6.5 (a)

Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.

SUSQUEHANNA - UNIT 2 TRIMl / 3.3-16 EFFECTIVE DATE 6/27/2001