ElA If f(14I?
DOCKETED USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION January 19, 2006 (2:02pm)
OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF In the Matter of FirstEnergy Nuclear Operating Company (Beaver Valley Power Station, Unit Nos. 1 & 2)
(Davis-Besse Nuclear Power Station, Unit No. 1)
(Perry Nuclear Power Plant, Unit No. 1)
)
)
)
)
)
)
)
)
)
)
January 19, 2006 Dkt Nos. 50-334 & 50-412 Dkt No. 50-346 Dkt No. 50-440 FENOC'S OPPOSITION TO REOUEST FOR CLARIFICATION BY AMP-OHIO AND CLEVELAND Acting as agent for and on behalf of FirstEnergy Nuclear Generation Corp.
("FENGenCo"), Ohio Edison Company ("Ohio Edison"), OES Nuclear Incorporated, licensed as "OES Nuclear, Inc." ("OES Nuclear"), The Cleveland Electric Illuminating Company ("Cleveland Electric"), The Toledo Edison Company ("Toledo Edison"), and Pennsylvania Power Company ("Penn Power"), FirstEnergy Nuclear Operating Company
("FENOC") submits this Answer in opposition to the January 9, 2005 Request for Clarification ("Request") by American Municipal Power - Ohio, Inc. ("AMP-Ohio") and The City of Cleveland, Ohio ("Cleveland," and together with AMP-Ohio, "Petitioners").'
l The Petitioner's Certificate of Service claims that the Request was delivered via electronic mail and first class mail. However, FENOC and its counsel only received service via first class mail.
Under 10 CFR 2.306, FENOC is permitted an additional five days to respond, based upon service via first class mail. Accordingly, this pleading is due by January 19, 2005, rather than January 17, 2005. FENOC notes that this is not the first time that its counsel has received a Certificate of Te ip( le= sC sy-3 7 s8 C V-oa Petitioners request that the Nuclear Regulatory Commission (the "Commission" or the "NRC"): (1) "clarify that transferring the operating licenses to a non-integrated utility essentially does, contrary to the Staff's conclusion, amount to a substantive change in the antitrust licensing conditions by rendering some of them moot;"2 and (2) require a commitment from FirstEnergy that it and its subsidiaries and affiliates will continue to comply with the antitrust conditions following the transfer of the operating licenses and nuclear assets to FENGenCo. The Commission should reject the Request because it:
(1) is untimely; (2) is otherwise procedurally deficient; and (3) is an unauthorized supplemental pleading that merely reiterates Petitioners' previous flawed arguments that NRC has the jurisdiction to impose antitrust contentions on former licensees.
Petitioners' Request is untimely and should be rejected on that basis alone. The NRC requires that "[a] motion must be made no later than ten (10) days after the occurrence or circumstance from which the motion arises."2 On November 21, 2005, the NRC issued the Federal Register notice announcing its November 15, 2005 Order approving the Transfer of Licenses and Conforming Amendments.4 Moreover, the cover letter transmitting the Order and Safety Evaluation indicates that copies were sent to no less than five representatives of Petitioners, including their counsel,' and both the Order and NRC's Safety Evaluation were made available on NRC's public website on Service from Petitioners' counsel indicating service by electronic mail, without having received such service.
2 Request for Clarification by AMP - Ohio and Cleveland (January 9, 2005) (the "Request"), p. 2.
2 10 CFR 2.323(a) (2005).
70 Fed. Reg. 70107 (Nov. 21, 2005); Petitioners assert that they were not served with a copy of the Order, however, a Federal Register notice provides adequate notice. "[I]gnorance of the publication of the Federal Register notice does not constitute good cause for this belated request."
Consolidated Edison Co. (Indian Point Station, Unit No. 2), LBP-82-1, 15 NRC 37, 40 (1982).
5 This is indicated in FENOC's copy which is date stamped received on November 18, 2005. A copy of this letter (without attachments) is appended hereto as Attachment 1.
November 22, 2005.6 Accordingly, any motion or request was due no later than December 1, 2005. Petitioners never requested an extension of time for filing a motion pursuant to 1 OCFR 2.1325(c), and they offer no good cause for late filing.' Thus, there does not appear to be any basis upon which to grant relief from the requirement to make timely filing. See, e.g., Entergy Nuclear Vermont Yankee L.L. C., et al. (Vermont Yankee Nuclear Power Station), LBP-05-33, slip op. at 7-9 (Dec. 21, 2005). Both the Order and accompanying Safety Evaluation about which Petitioners seek clarification have been both the subject of formal notice and readily available to Petitioners for several weeks.
The issuance of the December 16, 2005 Order - with license amendments dealing with including the antitrust conditions - does not provide any new or different information, and therefore, this issuance is not a circumstance or occurrence that provides an independent basis for filing Petitioners' Request. However, even assuming arguendo that this triggered another opportunity for Petitioners to file a motion or request, Petitioners are still late, because such motion or request was due no later than January 2, 2006. The December 16 Order was noticed in the Federal Register on December 22, 2005 and made available on NRC's website on December 27, 2005.' Petitioners did not file the Request until January 9, 2006. Accordingly, Petitioner's Request is untimely and should be rejected.
Furthermore, Petitioners' Request is procedurally deficient because it fails to include the mandatory certification that Petitioners have consulted with opposing parties, ADAMS Accession Number ML052790510.
2 Petitioners offer that their counsel received service and learned of the NRC Order only after the Order and Safety Evaluation were submitted to the Federal Energy Regulatory Commission (FERC). Request, footnote 1. However, Petitioners omit reference to the date of this FERC submission, November 16, 2005, which confirms Petitioners' receipt of the Order and Safety Evaluation prior to the notice placed in the Federal Register. A copy of this FERC submission is provided as Attachment 2.
as required by 10 CFR 2.323(a). This is the second time Petitioners have ignored this requirements The Request therefore should be rejected for procedural deficiency. See, e.g., Vermont Yankee, LBP-05-33, slip op. at 7-9.
Finally, the Request is an unauthorized pleading that essentially attempts to supplement the same argument raised in the Petitioner's Petition to Intervene and Motion to Lodge. This is an unauthorized attempt to supplement prior argument, because it is neither an authorized pleading under 10 CFR Part 2, nor did Petitioners seek leave to file it. Moreover, as discussed in FENOC's Answer to Petitions to Intervene dated September 15, 2005 ("Answer"), Petitioner's request to have the antitrust conditions imposed on companies that are no longer NRC licensees is not within the scope of the pending proceeding and is not material to the findings the NRC was required to make in approving or rejecting the proposed license transfers. Neither the NRC Staff's conclusions in the Safety Evaluation, nor the unauthorized supplemental argument of Petitioners, suggest any basis for NRC to exercise jurisdiction over former licensees for purposes of imposing antitrust conditions. NRC is properly constrained by its jurisdiction, and the extension of the antitrust conditions to FENGenCo as the new Section 103 license holder is undoubtedly the outer limit of any reasonable exercise of that jurisdiction.
70 Fed. Reg 76080 (Dec. 22, 2005); NRC Accession Number ML053460182.
2 FENOC Answer Opposing Joint Motion to Lodge (September 22, 2005), p. 2.
FENOC therefore respectfully submits that Petitioners' Request be rejected.
.John ET.B atth'ews, Esq.
Morgan, Lewis & Bockius, LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20005 Phone: (202) 739-5524 E-mail: imatthews(trmorganlewis.com David W. Jenkins, Esq.
FirstEnergy Corp.
76 South Main Street, Mail Stop A-Go-18 Akron, OH 44308 Phone: (330) 304-5037 E-mail: djenkins@FirstEnergyCorp.com Dated January 19, 2006 Counsel for FIRSTENERGY NUCLEAR OPERATING COMPANY On Behalf of FirstEnergy Nuclear Generation Corp.
Ohio Edison Company OES Nuclear Incorporated The Cleveland Electric Illuminating Company The Toledo Edison Company Pennsylvania Power Company
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION
)
In the Matter of January 19, 2005 FirstEnergy Nuclear Operating Company (Beaver Valley Power Station, Unit Nos. 1 & 2)
(Davis-Besse Nuclear Power Station, Unit No. 1)
(Perry Nuclear Power Plant, Unit No. 1)
)
Dkt Nos. 50-334 & 50-412
)
Dkt No. 50-346
)
Dkt No. 50-440 CERTIFICATE OF SERVICE I hereby certify that copies of the FENOC Opposition to Request for Clarification by AMP-Ohio and Cleveland, together with this Certificate, were served upon the persons listed below by U.S. mail, first-class, postage prepaid, and by electronic mail (to the email addresses indicated), on this 19th day of January, 2005.
Secretary of the Commission' Attn: Rulemakings and Adjudication Staff U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: hearingdocket~nrc.gov)
Teresa Beasley, Esq.
Director of Law City of Cleveland City Hall, Room 106 601 Lakeside Avenue Cleveland, OH 44114 William T. Zigli, Esq.
Chief Assistant Director of Law City of Cleveland City Hall, Room 106 601 Lakeside Avenue Cleveland, OH 44114 (E-mail: wzigli~city.cleveland.oh.us)
General Counsel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: ogclt(nrc.gov)
Tom Smith Cleveland Public Power 1300 Lakeside Avenue Cleveland, OH 44114 (E-mail: tsmith~cpp.org)
David R. Straus, Esq.
Thompson Coburn LLP 1909 K Street, NW Suite 600 Washington, DC 20006-1167 (E-mail: dstraus(thompsoncoburn.com)
' E-mail, original and two copies
Chris Norton American Municipal Power - Ohio, Inc.
2600 Airport Drive Columbus, OH 43219 (E-mail: cnorton(amp-ohio.org)
John W. Bentine, Esq.
Chester, Willcox & Saxbe LLP 65 East State Street Suite 1000 Columbus, OH 43215 (E-mail: jbentine(cwslaw.com)
Dated January 19, 2005 Counsel for FIRSTENERGY NUCLEAR OPERATING COMPANY On Behalf of FirstEnergy Nuclear Generation Corp.
Ohio Edison Company OES Nuclear Incorporated The Cleveland Electric Illuminating Company The Toledo Edison Company Pennsylvania Power Company I -WA/2446932.1
ATTACHMENT 1
419FF RUNITED STATES NUCLEAR REGULATORY COMMISSION Nov I0 WASHINGTON. D.C. 2055S-0001 November 15, 2005 Da'.
Mr. Gary R. Leidich President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308
SUBJECT:
ORDER APPROVING TRANSFER OF LICENSES AND CONFORMING AMENDMENTS RELATING TO BEAVER VALLEY POWER STATION, UNITS 1 AND 2, DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1, AND PERRY NUCLEAR POWER PLANT, UNIT 1 (TAC NOS. MC7005, MC7006, MC7007, MC7223, MC7224, MC7225 AND MC7226)
Dear Mr. Leidich:
By letters to the Nuclear Regulatory Commission (NRC) dated May 18 and June 1, 2005, as supplemented by letters dated July 15 and October 31, 2005, you submitted applications requesting approval of the direct transfers of the Facility Operating Licenses for Beaver Valley Power Station, Units 1 and 2 (BVPS), Davis-Besse Nuclear Power Station, Unit I (Davis-Besse), and Perry Nuclear Power Station, Unit 1 (Perry), to the extent held by Pennsylvania Power Company, Ohio Edison Company, OES Nuclear, Inc., the Cleveland Electric Illuminating Company, and the Toledo Edison Company, to FirstEnergy Nuclear Generation Corporation, a new nuclear generation subsidiary of FirstEnergy Corporation. The applications also requested approval of the conforming amendment to the licenses pursuant to Sections 50.80 and 50.90 of Title 10 of the Code of Federal Regulations. The NRC staff's proposed no significant hazards consideration determinations, which included the July 15, 2005, supplement, were published in the Federal Register on August 2, 2005 (70 FR 44390-44395). The October 31, 2005, supplement, contained clarifying information and did not change the staff's initial proposed finding of no significant hazards consideration.
The NRC staff has completed its review of the applications. Enclosure 1 is the Order which approves the proposed license transfers, subject to the conditions described therein, and the conforming amendments. Enclosures 2 through 5 provide conforming amendment pages for BVPS, Davis-Besse, and Perry. The conforming amendments will be issued and become effective at the time the transfer is consummated. Enclosures 6 and 7 contain the non-proprietary and proprietary versions, respectively, of the NRC staff's safety evaluation (SE) related to the preceding actions. The non-proprietary version of the SE will be placed in the NRC public document room and added to the Agencywide Documents Access and Management System's Publicly Available Records System Library.
NOTE: THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION. THIS DOCUMENT BECOMES NON-PROPRIETARY UPON REMOVAL OF ENCLOSURE 7.
I
G. Leidich The Order has been forwarded to the Office of Federal Register for publication.
Sincerely, Stepen Sands, Project Manager Plant Licensing Branch F Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 and 50-440
Enclosures:
- 1. Order
- 2. Conforming Amendment to DPR-66
- 3. Conforming Amendment to NPF-73
- 4. Conforming Amendment to NPF-3
- 5. Conforming Amendment to NPF-58
- 6. Safety Evaluation (Non-proprietary)
- 7. Safety Evaluation (Proprietary) cc wlo Enclosure 7: See next page NOTE: THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION. THIS DOCUMENT BECOMES NON-PROPRIETARY UPON REMOVAL OF ENCLOSURE 7.
F
Beaver Valley Power Station, Unit Nos. 1 and 2 cc: w/o Enclosure 7 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Mary O'Reilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 Larry R. Freeland, Manager FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Beaver Valley Power Station P.O. Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN; Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 J. H. Lash, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box4 Shippingport, PA 15077 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)
P.O. Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak P.O. Box 4, BV-A Shippingport, PA 15077 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 F
Davis-Besse Nuclear Power Station, Unit 1 cc: w/o Enclosure 7 Mr. Mark B. Bezilla Vice President-Nuclear, Davis-Besse FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760 Mary E. O'Reilly FirstEnergy Corporation 76 South Main St.
Akron, OH 44308 Manager - Regulatory Affairs FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator U.S. Nuclear Regulatory Commission 801-Warrenville Road Lisle, IL 60523-4351 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Barry Allen, Plant Manager FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State - Route 2 Oak Harbor, OH 43449-9760 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 1 18 Columbus, OH 43266-0118 Carol O'Claire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Office of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 600 Toledo, OH 43604-6506 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760 F
Perry Nuclear Power Plant, Unit 1 cc: wto Enclosure 7 Mr. Richard Anderson Vice President FirstEnergy Nuclear Operating Company P.O. Box 97, A290 10 Center Road Perry, Ohio 44081 David W. Jenkins FirstEnergy Corporation 76 South Main St.
Akron, OH 44308 Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Regional Administrator, Region IlIl U.S. Nuclear Regulatory Commission 2443 Warrenville Road Lisle, IL 60532-4531 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager - Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, A210 10 Center Road Perry, OH 44081 Director, Site Operations FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Carol O'Claire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-7150 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Dennis Clum Radiological Assistance Section Supervisor Bureau of Radiation Protection Ohio Department of Health P.O. Box 118 Columbus, OH 43266-0118 Zack A. Clayton DERR Ohio Environmental Protection Agency ATTN: Mr. Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081 Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 Joseph J. Hagan Senior Vice President, Engineering and Services First Energy Nuclear Operating Company 76 South Main Street Akron, OH 44308 Mr. Lew W. Myers Chief Operating Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron, OH 44308 Director, Regulatory Affairs FirstEnergy Nuclear Operating Company 395 Ghent Road Akron, OH 44333 r
American Municipal Power-Ohio, Inc. Petitioners City of Cleveland, Ohio Petitioners cc w/o Enclosure 7:
Chris Norton American Municipal Power-Ohio, Inc.
2600 Airport Drive Columbus, OH 43219 John W. Bentine, Esq.
Chester, Willcox & Saybe LLP 65 East State Street Suite 1000 Columbus, OH 43215 David R. Straus Thompson Colbum LLP 1909 K Street, NW Suite 600 Washington, DC 20006-1167 Teresa Beasley, Esq.
Director of Law William T. Zigli, Esq.
Chief Assistant Director of Law City of Cleveland City Hall, Room 106 601 Lakeside Avenue Cleveland, Ohio 44114 Tom Smith Cleveland Public Power 1300 Lakeside Avenue Cleveland, OH 44114
ATTACHMENT 2
Thelon Reid & Priest LLP AUomeys At Law 701 Laghth Strwt. NW Ja'bts K
,t~h'~
eWashington.
DC 200013721 202 5)e.4t4:2 DOrect Dial lel 202 508.400 2(2 654.1814 Oro;t Fax OR IG \\INA L Fit 202.508.4321
,w11iJir;ll-ohaWnreWd OtP L4*
cd.W November 16, 2005 Magalie R. Salas Secretary Federal Energy Regulatory Commission
- ,,F 888 First Street, NE c-401in Washington, DC 20426
=i-Re:
FirstEnergy Corp.
=
FERC Docket No. EC0544-000
Dear Ms. Salas:
The Cleveland Electric Illuminating Company, Ohio Edison Company, Pennsylvania Power Company, and The Toledo Edison Company (collectively, 'the FirstEnergy Operating Companies*) each own Interests in Units 1 and 2 of the Beaver Valley Nuclear Generating Station, the Davis-Besse Nuclear Generating Station, and/or the Perry Nuclear Generating Station (the Nuclear Assets"). On September 1, 2005, the Federal Energy Regulatory Commission Issued an order authorizing the FirstEnergy Operating Companies to transfer their respective ownership interests in the Nuclear Assets to FirstEnergy Nuclear Generation Corp. ("Nuclear Genco"), a newly-formed generation company with which they are affiliated. FirstEner-oy Corp., 112 FERC ¶1 61,243 (2005). The transfer of the Nuclear Assets Is subject to receipt of certain other regulatory authorizations, including authorization from the Nuclear Regulatory Commission (the ONRCw) to transfer the licenses for the Nuclear Assets from the FirstEnergy Operating Companies to Nuclear Genco.
One of the issues raised in this proceeding was whether the Commission should condition its authorization for transfer of the Nuclear Assets on a requirement that the FirstEnergy Operating Companies remain subject to certain antitrust licensing conditions (the "Licensing Conditions) that had been incorporated In the licenses for the Nuclear Assets at the time they had been Issued. The Commission rejected the request to adopt such a condition on the basis that the issue "is outside the scope of this proceedings and, in any event, "[blecause the Licensing Conditions were imposed by the NRC, it would be more appropriate to discuss their future applicability In that forum.'
NFW YORK SM FRANCISCO WFW YORK SA rRANCISCOWASH4INGTON1 DC lOS ANGUELS SLCNV~ YFCRIMPR.
SILCON VALI FY F LORIMM PARK. Nj
Magalle R. Salas Thelen Reid a Priest LLP November 16, 2005 Page 2 Enclosed for your information is a copy of an order Issued by the NRC (I) approving the transfer of the licenses for the Nuclear Assets to Nuclear Genco, and (ii) approving amendments to each of the affected licenses for the Nuclear Assets to conform to the ownership changes by deleting references to the various FirstEnergy Operating Companies, as appropriate. This order Is accompanied by a Safety Evaluation of the proposed transaction that was prepared by the NRC Staff. The NRC Staff noted In the Safety Evaluation that "the applications are not proposing any changes to the substantive requirements set forth in the antitrust conditions, notwithstanding that FENGenCo Is not an Integrated utility with transmission and distribution facilities and, therefore, would not appear to be able to perform certain actions specified by the antitrust conditions, such as wheeling, strictly on ts own," and that under the conforming amendments to the licenses, Nuclear Genco "Would become subject to the antitrust conditions and be responsible for any actions of FENOC that contravene such conditions." Based on Its evaluation of the amendments, the NRC Staff concluded that Given that the proposed conforming amendments only seek to reflect that FENGenCo will become the holder of the licenses and that Cleveland Electric, OES Nuclear, Toledo Edison and Penn Power will no longer be NRC licensees, the NRC staff finds the proposed amendments to the existing antitrust license conditions acceptable.
The NRC Staff also noted that the Department of Justice, which had previously participated in development of the Licensing Conditions, was consulted about the proposed license amendments but had no comments. If further information with respect to this matter is desired, please contact either Michael R. Belting, Associate General Counsel, FirstEnergy Service Company, 76 South Main Street, Akron, OH 44308 (330-384-5795) or the undersigned counsel for FirstEnergy Corp.
Sincerely, James K Mitchell
/7 Attorney for FIrstEnergy Corp.
Cc: All parties JKM/
DC #20655 VI
7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
PENNSYLVANIA POWER COMPANY 3
OHIO EDISON COMPANY
)
OES NUCLEAR. INC.
)
THE CLEVELAND ELECTRIC
)
ILLUMINATING COMPANY
)
THE TOLEDO EDISON COMPANY
)
FIRSTENERGY NUCLEAR OPERATING
)
COMPANY
)
(Beaver Valley Power Station, Units I
)
Docket Nos. 50-334 and 50-412 and 2
)
License Nos. DPR-66 and NPF-73 (Davis-Besse Nuclear Power Station. Unit 1))
Docket No. 50-346
)
License No. NPF-3 (Perry Nuclear Power Plant. Unit 1)
)
Docket No. 50-440
)
License No. NPF-58 ORDER APPROVING TRANSFER OF LICENSES AND CONFORMING AMENDMENTS I.
FirstEnergy Nuclear Operating Company (FENOC) and Pennsylvania Power Company (Penn Power), Ohio Edison Company (Ohio Edison), OES Nuclear. Inc. (OES Nuclear), te Cleveland Electric Illuminating Company (Cleveland Electric), and the Toledo Edison Company (Toledo Edison), are holders of Facility Operating Lcense Nos. DPR-66, NPF-73, NPF-3 and NPF-58, which authorize the possession, use, and operation of Beaver Valley Power Station.
Units I (BVPS 1) and 2 (BVPS 2; together with BVPS 1, BVPS), Davis-Besse Nuclear Power Station, Unit I (Davis-Besse), and Perry Nuclear Power Plant, Unit I (Perry), respectively.
FENOC is licensed by the U.S. Nuclear Regulatory Commission (NRC, the Commission) to operate BVPS, Davis-Besse, and Peny (the facilities). The facilities are located at the licensees, sites in Beaver County. Pennsylvania, Ottawa County, Ohio, and Lake County, Ohio, respectively.
'I.
By letter dated May 18, 2005, FENOC submitted an application requesting approval of direct license transfers that would be necessary in connection with the following proposed transfers to FirstEnergy Nuclear Generation Corp. (FENGenCo), a new nuclear generation subsidiary of FirstEnergy. Penn Power's 65-percent undivided ownership Interest in BVPS 1, 13.74-percent undivided ownership Interest In BVPS 2, and 5.25-percent undivided ownership interest in Perry.
By letter dated June 1, 2005, FENOC submitted a second application requesting approval of direct license transfers that would be necessary In connection with the following proposed transfers to FENGenCo: Ohio Edison's 35-percent undivided ownership interest in BVPS I and 20.22-percent undivided ownership interest in BVPS 2; OES Nucdears 17.42-percent undivided ownership Interest In Perry; Cleveland Electric's 24.47-percent undivided ownership Interest in BVPS 2, 44.85-percent undivided ownership interest In Perry, and 51.38-peroent undivided ownership Interest In Davis-Besse; and, Toledo Edison's 1.65-percent undivided ownership interest In BVPS 2, 19.91-percent undivided ownership interest in Perry, and 48.62-percent undivided ownership Interest in Davis-Basse.
Supplemental Information was provided by letters dated July 15 and October31, 2005, (hereinafter, the May 18 and June 1, 2005, applications and supplemental Information will be referred to collectvely as the "applicationsV). FENOC also requested approval of conforming license amendments Fat would reflect the proposed transfer of ownership of Penn Power's Interests in BVPS and Perry to FENGenCo; delete the references to Penn Power in the licenses:
authorize FENGenCo to possess the respective ownership Interests In BVPS and Perry; reflect the proposed transfer of ownership Interests in BVPS, Davis-Besse, and Perry from Ohio Edison. OES Nuclear, Cleveland Electric, and Toledo Edison (Ohio Companies) to FENGenCo; delete the Ohio Companies from the licenses; and, authorize FENGenCo to possess the respective ownership interests In BVPS, Davis-Besse, and Perry being transferred by the Ohio Companies. Ohio Edison's 21.86-percent leased Interest In BVPS 2, Toledo Edison's 18.26-percent leased Interest In BVPS 2, and Ohio Edison's 12.58-percent leased Interest In Perry would not be changed. No physical changes to the facilities or operational changes were proposed In the applications. After completion of the proposed transfers, FENGenCo and, to a limited extent, Ohio Edison and Toledo Edison, would be the sole owners of the facilities; the role of FENOC would be unchanged.
Approval of the transfer of the facility operating licenses and conforming license amendments Is requested by FENOC pursuant to Sections 50.80 and 50.90 of Title 10 of the Code of Federal Regulations (10 CFR). Notices of the requests for approval and opportunity for a hearing were published in the Federal Register on August 2, 2005 (70 FR 44390-44395). No comments were received. Two petitions for leave to intervene pursuant to 10 CFR 2.309 were recelved on August 22, 2005, from the City of Cleveland, ONo, and American Municipal Power-Ohio, Inc. A joInt motion to lodge by the City of Cleveland. Ohio and Municipal Power Ohio, Inc.,
was received on September 12, 2006. The petitions and motion are under consideration by the Commission.
Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly. through transfer of control of the license, unless the Commission shall give its consent in writing. Upon review of the information In the application and other Information before the Commission, and relying upon the representations and agreements contained in the application, the NRC staff has determined that FENGenCo is qualified to hold the ownership interests in the facilities previously held by Penn Power and the Ohio Companies, and that the transfers of undivided ownership interests In the facilities to FENGsnCo described in the applications are otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission, subject to the conditions set forth below. The NRC staff has further found that the applications for the proposed license amendments comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth In 10 CFR Chapter 1. The facilities will operate in conformity with the applications, the provisions of the Act and the rules and regulations of the Commission; there is reasonable assurance that the activities authorized by the proposed license amendments can be conducted without endangering the health and safety of the public and that such activities will be conducted in compliance with the Commission's regulations; the issuance of the proposed license amendments will not be Inimical to the common defense and security or to the health and safety of the public; and the issuance of the proposed amendments will be In accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
The findings set forth above are supported by an NRC safety evaluation dated November
,2005.
111.
Accordingly, pursuant to Sections 161b, 1611, and 184 of the Act, 42 U.S.C. §§ 2201(b).
2201(i), and 2234; and 10 CFR 50.80, IT IS HEREBY ORDERED that the direct transfers of the licenses, as described herein, to FENGenCo am approved, subject to the following conditions:
(1)
On the dosing date(s) of the transfers to FENGenCo of their interests in BVPS 1, BVPS 2, Davis-Besse, and Perry, Penn Power, Cleveland Electric, Ohio Edison, OES Nuclear, and Toledo Edison shall transfer to FENGenCo all of each transferor's respective accumulated decommissioning funds for BVPS 1.
BVPS 2, Davis-Besse, and Perry, except for funds associated with the leased portions of Peny and BVPS 2, and tender to FENGenCo additional amounts equal to remaining funds expected to be coflected In 2005, as represented In the application dated June 1, 2005, but not yet collected by the time of closing. All of the funds shall be deposited In separate external trust funds for each of these four reactors in the same amounts as received with respect to each unit to be segregated from other assets of FENGenCo and outside Its administrative control, as required by NRC regulations, and FENGenCo shall take all necessary steps to ensure that these external trust funds are maintained in accordance with the requirements of the order approving the transfer of the licenses and consistent with the safety evaluation supporting the order and In accordance with the requirements of 10 CFR Section 50.75, "Reporting and recordkeeping for decommissioning planning."
(2)
By the date of closing of the transfer of the ownership Interests in BVPS 1, BVPS 2, and Perry, from Penn Power to FENGenCo, FENGenCo shall obtain a parent company guarantee from FirstEnergy In an initial amount of at least
$80 million (In 2005 dollars) to provide additional decommissioning funding assurance regarding such ownership interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCo shall either obtain appropriate adjustments to the parent company guarantee or otherwise provide G
any additional decommissioning funding assurance necessary for FENGenCo to meet NRC requirements under 10 CFR 50.75.
(3)
The Support Agreements described in the applications dated May 18, 2005 (up to
$80 million), and June 1, 2005 (up to $400 million), shall be effective consistent with the representations contained in the applications. FENGenCo shall take no action to cause FirstEnergy, or its successors and assigns, to void, cancel, or modify the Support Agreements without the prior written consent of the NRC staff, except, however, the $80 million Support Agreement in connection with the transfer of the Penn Power interests may be revoked or rescinded if and when the
$400 million support agreement described in the June 1, 2005 application becomes effective. FENGenCo shall inform the Director of the Office of Nuclear Reactor Regulation, In writing, no later than 10 days after any funds are provided to FENGenCo by FirstEnergy under either Support Agreement.
(4)
Prior to completion of the transfers of the licenses, FENGenCo shall provide the Director of Vie Office of Nuclear Reactor Regulation 5etlsfactory documentary evidence that It has obtained the appropriate amount of insurance required of licensees under 10 CFR Part 140 of the Commission's regulations.
IT IS FURTHER ORDERED that, consistent with 10 CFR 2.1315(b), license amendments that make changes, as Indicated In Enclosures 2 through 5 to the cover letter forwarding this Order, to conform the licenses to reflect the subject direct license transfers are approved. FirstEnergy has Indicated that the Pennsylvania transfers described in the May 18, 2005, application and the Ohio transfers described in the June 1, 2005, application, will take place at the same time. The amendments shall be issued and made effective at the time the proposed direct license transfers are completed.
IT IS FURTHER ORDERED that FENOC shall inform the Director of the Office of Nuclear Reactor Regulation in writing of the date of dosing of the transfer of the Penn Power, Cleveland Electric, Ohio Edison, OES Nuclear, and Toledo Edison Interests in BVPS 1, BVPS 2, Davis-Besse, and Perry no later than 5 business days prior to closing. Should the transfer of the licenses not be completed by December 31, 2006, this Order shall become null and void, provided; however, that upon written application and for good cause shown, such date may be extended by order.
This Order is effective upon Issuance.
For further details with respect to this Order, see the initial applications dated May 18 and June 1, 2005, as supplemented by letters dated July 15 and October 31, 2005. and the non-proprietary safety evalustion dated November
, 2005, which are avilable for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockvilie Pike (first floor). Rockville, Maryland and accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site.
httojhvww.nrc.oovlreadinag-r-mdams.html. Persons who do not have access to ADAMS or who encounter problems In accessing the documents located In ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-3974209, 301-4154737, or by e-mail to 2QrAnrcfovg.
Dated at Rockvlle, Maryland this day of November 2005.
FOR THE NUCLEAR REGULATORY COMMISSION J. E. Dyer, Director Office of Nuclear Reactor Regulabof
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO DIRECT TRANSFER OF FACILITY OPERATING LICENSES TO FIRSTENERGY NUCLEAR GENERATION CORPORATION BEAVER VALLEY POWER STATION. UNITS I AND 2 DAVIS-BESSE NUCLEAR POWER STATION. UNIT 1 PERRY NUCLEAR POWER PLANT. UNIT I DOCKET NOS. 50-334.50-412.50-348. AND 50440 1.0 INTRODUCTIQN FirstEnergy Nuclear Operating Company (FENOC) submitted two applications to the U.S.
Nuclear Regulatory Commission (NRC, the Commission) requesting the direct transfer of the licenses with respect to the proposed transfer of all te ownership interests (all non-leasehold interests) In four nuclear power reactor units held by certain subsidiaries of FirstEnergy Corp.
(FirstEnergy) to FirstEnergy Nuclear Generation Corp. (FENGenCo), a new nuclear generation subsidiary of FirstEnergy. FENOC is the licensed operator for the four reactor units.
In the first application, dated May 18, 2005 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML051450428), as supplemented by letters dated July 15 (ADAMS Accession No. ML052070592) and October 31, 2005 (ADAMS Accession No. ML052640021), FENOC. acting on behalf of FENGenCo and Pennsylvania Power Company (Penn Power), requested that the NRC approve the direct license transfers associated with the transfer of Penn Power's 65-percent undivided ownership interest in Beaver Valley Power Station. Untt I (BVPS 1), 13.74-percent undivided ownership Interest in Beaver Valley Power Station. Unit 2 (BVPS 2: together with BVPS 1, BVPS), and 5.24-percent undivided ownership Interest In Perry Nuclear Power Plant, Unit I (Perry) to FENGenCo.
In the second application, dated June 1. 2005 (ADAMS Accession No. ML05`1570300), also supplemented by the above letters dated July 15 and October 31, 2005, FENOC, acting on behalf of FENGenCo, Ohio Edison Company (Ohio Edison). OES Nuclear, Inc. (OES Nuclear),
the Cleveland Electric Illuminating Company (Cleveland Electric), and the Toledo Edison Company (Toledo Edison) (as a group, Ohio Edison, OES Nuclear, Cleveland Electric, and Toledo Edison are referred to as thw Ohio Companies), requested that the NRC approve the following direct license transfers associated with transfer of the ownership Interests of the Ohio Companies in BVPS 1,
- BVPS 2, Perry, and the Davis-Besse Nuclear Power Station, Unit I (Davis-Besse) to FENGenCo:
Ohio Edison's 35-percent undivided ownership interest in BVPS I and 20.22-percent undivided ownership interest in BVPS 2; OES Nuclear's 17.42-percent undivided ownership Interest in Perry; Cleveland Electric's 24A7-percent undivided ownership interest In BVPS 2.
44.85-percent undivided ownership Interest in Perry, and 51.38-percent undivided ownership Interest In Davis-Besse; and Toledo Edison's 1.65-percent undivided ownership interest in BVPS 2, 19.91ercent undivided ownership Interest in Perry. and 48.62-percent undivided ownership interest in Davis-Besse.
No transfers or other changes are requested with respect to Ohio Edison's license to possess its 21.8-percent leased interest in BVPS 2 and 12.5-percent leased Interest in Perry, nor with respect to Toledo Edison's license to possess Its 18.26-percent leased interest In BVPS 2. Ohio Edison and Toledo Edison will remain responsible for their respective obligations under the licenses for these leased interests.
Both applications requested conforming amendments to the licenses of the four units to reflect the proposed transfers of ownership interests in the four units to FENGenCo. Generally, the amendments would delete references to Penn Power, Ohio Edison, OES Nuclear, Cleveland Electric, and Toledo Edison In the licenses as appropriate, and authorize FENGenCo to possess the respective ownership Interests In the four units being transferred by Penn Power and the Ohio Companies.
The NRC staffs proposed no significant hazards consideration determinations, which included the July 15, 2005, supplement, were published In the Federal Register on August 2, 2005 (70 FR 44390.44395) The October 31, 2005, supplement, contained clarifying Information and did not change the staffs Initial proposed finding of no significant hazards consideration.
2.0 13ACKGROYMD FirstEnergy is a registered utility holding company based In Akron, Ohio. FirstEnergy and its affiliates are engaged In the generation, transmission, and distribution of electricity to wholesale and retail customers In the Eastern Interconnection. FirstEnergy's shares of common stock are widely held and are traded on the New York Stock Exchange. At the end of 2004, FirstEnergy had over $31 billion In assets and over $12 billion In annual revenues. The seven electric utility operating companies owned by FirstEnergy serve 4.4 million customers in Ohio, Pennsylvania, New Jersey, and New York.
The two applications cited herein represent a reorganization by FirstEnergy to consolidate the ownership interests of Davis-Besse, BVPS, and Perry, except for the Interests In BVPS 2 and Perry subject to third party lease obligations. Subsidiaries of FirstEnergy collectively own or lease 100 percent of these reactor units. As noted, the first application requested license transfer approvals associated with a direct transfer of the ownership Interests of Penn Power in the BVPS and Perry units to FENGenCo. The second application states that FENOC expects that the transfer of the ownership interests of Penn Power will occur prior to Fe transfer of the ownership Interests of the FirstEnergy Ohio Companies. The second application also states that NRC approval of either application should be dependent upon approval of tie other and that, in the event that approval of the second application precedes approval of the first one, FENOC will supplement the applications with the appopriate amended conforming Facility Operating Ucense pages. Subsequently, FENOC stated -to the NRC staff that all the transfers would occur at the same time. Should that change, the NRC staff should be Informed by FENOC.
FirstEnergy Is undertaking the proposed transfer In ownership of these four reactors as part of Its corporate restructuring In response to legislation passed at the Federal level and In the States of Pennsylvania and Ohio and to enhance its ability to compete in electric energy markets. In 1992, Congress passed the Energy Policy Act to promote competition In at!
wholesale electric energy market. In 1998, Pennsylvania enacted legislation to restructure the electric utility industry in the state by creating retail access to a competitive market for elecbricity generation.
According to the description of this legislation on the Web site for the State of Pennsylvania, investor-owned utilities could either retain their generation assets in an affiliate company or divest these assets as part of their restructuring plan. In 199, similar legislation enacted In Ohio included the requirement to establish a structural separation between the competitive generation portion of the electric power industry and the regulated wire delivery portion of the Industry.
Both applications initially stated that FENGenCo would be a direct, wholly-owned subsidiary of FlrstEnergy Solutions Corp. (FE Solutions), which is a direct, wholly-owned subsidiary of FirstEnergy. As part of its restructuring, FirstEnergy established FE Solutions as the affiliate responsible for te purchase and sale of electricity In competitive markets. FENGenCo was created to own the nuclear facilities now owned by FirstEnergy subsidiaries Penn Power and the Ohio Companies and to sell the output of these facilities as an exempt wholesale generator (EWG) to FE Solutions. The power supply agreement (PSA). which Is Xt contract for th sale of output of the Interests of FENGenCo to FE Solutions. Is subject to review and approval by the Federal Energy Regulatory Commission (FERC). The applications state that the PSA will be designed to ensure that FENGenCo will recover Its costs to own and fund its operating, maintenance, and decommissioning obligations for the four reactor units from FE Solutions.
However, the July 15, 2005, supplement to the applications states that FENGenCo will not be an EWG and will not be owned by FE Solutions, but Instead will be Oa direct, first-tier subsidiary of FirstEnergy.0 But the supplement states that FENGenCo and FE Solutions will still enter into the PSA described in Fe applications and that no financial qualifications or other types of qualifications (e.g., foreign ownership or control) as specified In the applications will be affected by these organizational structure changes described In the supplement FENOC will remain the licensed operator for the four reactor units. The applications do not request or Involve any change to FENOC's ongoing operation of these units, nor do the applications request approval of any physical changes to the units or any changes to the conduct of their operations. After any approved license transfers to FENGenCo, FENOC will continue to operate and maintain the four units in accordance with their respective licensing bases, and FENGenCo will assume the obligations of Penn Power, Ohio Edison, OES Nuclear, Cleveland Electric, and Toledo Edison under the FENOC operating agreements.
3.0 REGULATORY EVALUATION
The applications requested the approval of the direct transfer of the licenses for the reactor units to FENGenCo, pursuant to TItle 10 of the Code of Federal Regulations (10 CFR) Section 50.80,
'Transfer of licenses.' Section 50.80(a) states: "No license for a production or utilization facility, or any right Thereunder, shall be transferred, assigned, or In any manner disposed of, either voluntarily or involuntarily, directly or Indirectly, through the transfer of control of license to any person, unless the Commission shall give its consent in writin.'
In addition, the requirements of 10 CFR 50.80(b) and (c) apply. Section 50.80(b) states that an applicant for a license transfer shall include as much of the Information described In 10 CFR 50.33, OContents of applications; general Information' and 50.34, "Contents of application; technical infomation' of this part "ith respect to the Identity and technical and financial qualifications of the proposed transferee as would be required by those sections if the application were for an Initial license... Section 50.80(c) states that 'the Commission will approve the application for the transfer of a license, If the Commission determines: (1) that the proposed transferee Is qualified to be the holder of the license; and (2) that transfer of the license Is otherwise consistent with applicable provisions of laws, regulations, and orders issued by the Commission pursuant thereto.'
4.0 QUALIFICATIONS 4.1 Financial Qualifications The regulation at 10 CFR 50.33(f) requires that, except for an electric utility applicant for a license to operate a utilization facility of the type described in 10 CFR 50.21(b) or 10 CFR 50.22, each application shall provide 'Information sufficient to demonstrate to the Commission the financial qualification of the applicant to carry out, In accordance with regulations in this chapter, the activities for which the permit or license is sought.'
The regulation at 10 CFR 502 states that an electric utility is 'any entity that generates or distributes electricity and which recovers the cost of this electricy, either directly or Indirectly.
through rates established by the entity itself or by a separate regulatory authority."
The NRC staff finds that FENGenCo does not qualify as an electric utility' because most or all of its electricity prices will not be set by rates established by a separate regulatory authority or by the entity Itself. Thus, the NRC staff has determined that FENGenCo must meet the financial qualification requirerments for a non-electric utility, pursuant to 10 CFR 50.33(f). FENGenCo is subject to a more detailed financial qualifications review than an electric utility and must provide Information that demonstrates that it possesses or has reasonable assurance of obtaining te funds necessary to cover estimated operating costs for the period of the license. In thIs regard, it must submit estimates for total annual operating costs for each of the first 6 years of facility operation and indicate the sources of funds to cover these costs. Also, the NRC staff concludes that FENGenCo Is a newly-formed entity. As such, under 10 CFR 50.33(fX3), It must provide information showing the legal and financial relationships It has or proposes to have with its stockholders or owners; their financial ability to meet any contractual obligation to FENGenCo which they have incurred or proposed to Incur; and any other Information considered necessary by the Commission to enable it to determine FENGenCo's financial qualifications.
In accordance with 10 CFR 50.33(f). the applications provided a proprietary projected income statement for FENGenCo, with the first application providing the expected revenues, costs, and net Income associated with the Interests of Penn Power proposed to be transferred for the period of 200 through 2010. The-second application provides the equiWlent information for the ownership Interests of fte Ohio Companies proposed to be transferred.
The proprietary financial information Pn Bold Text] In th following three tables first shows the projected Income statement for both applications combined, providing the total revenues, costs, and not income for FENGenCo from 2006 through 2010. The second and third tables show, respectively. the specific portions associated with the Penn Power and the Ohio Companies Interests, thereby allowing the projections for FENGenCo for each application to be considered separately.
FENGENCO
(
SUMMARY
OF) PROJECTED INCOME STATEMENT (COMBINED APPLICATIONS)
(In $ millions)
[PROPRIETARY INFORMATION) gm 207 2008 2QQ9 2010 Total Revenue[
11 1[
i[
I Expenses/
Other Income
[
I I
[
1 I
1[
1 Net Income
[ J I
[
[
1 1
(
SUMMARY
OF) PROJECTED INCOME STATEMENT (PENN POWER PORTION)
(In S minions)
ZQf 2007 2009 2010 TotalRevenue I 1 11 1
1 Expenses/
OtherIncome
[
11
[
[
11 I
Net Income
[
I I I
1 1 ] I 1
(
SUMMARY
OF) PROJECTED INCOME STATEMENT (OHIO COMPANIES PORTION)
(in $ millions) 2008 2007 2008 2009 2010 TotalRevenue[
I[
I 1 1
Il Expenses/
Otherincome
[
I I
I
{
{
Net Income
[
J[
IC J[
I (I
Based on the revenues and costs provided above. FENGenCo expects to produce annual net Income ranging from approximately 1 I during this 5-year period, as shown in the first table. Both portions of FENGenCo's net Income associated with the Penn Power and Ohio Companies Interests are also positive amounts. The primary source of most or all of the revenues is expected to be from the aforementioned PSA, through which FENGenCo will recover its operating, maintenance, and capital costs associated with the transferred assets for at least 5 years. The PSA is to be finalized this year and will be filed for review and approval by FERC.
Furthermore, In addition to revenues received from generation associated with the transferred Interests In the nuclear units, FENGenCo will have access to other funds from its affiliated companies on an as-needed basis. The PSA will include a formula rate provision permitting FENGenCo to recover Increases in its capital expenditures and operating expenses that exceed its base demand and energy charges during the contract term.
In the applications, FirstEnergy has also provided the terms of planned support agreements to be executed by FirstEnergy and FENGenCo that will make additional funds available to FENGenCo to provide assurance that FENGenCo will have funds that will exceed fixed operating and maintenance (O&M) costs In the event of unanticipated shutdowns for extended periods of one or more of the power reactors to be owned by FENGenCo. The first application represented that a support agreement for up to $80 million would be made available by FirstEnergy for FENGonCo s share of ficed O&M costs for any unanticipated extended shutdown periods of BVPS and Perry. The second application essentially provides that up to $400 million will be available under a support agreement to cover costs associated with all Interests proposed to be transferred regarding each of the four reactor units covered by the applications, in lieu of the $80 million limit contained in the first application addressing only the transferred interests of Penn Power. If the Penn Power transfers take place contemporaneously with, as planned, or after the transfers for the Ohio Companies, the $400 million support agreement would be applicable to support the Penn Power transfers (in place of the $80 million agreement) as well as the Ohio Companies' transfers.
The $400 million amount would be basically sufficent to fund FENGenCo's share of the estimated fixed O&M costs for a simultaneous 1-year outage of BVPS I and BVPS 2
($151 Milflon), Perry ($122 million), and Davis-Besse ($128 million), or approximately
$401 million total. These amounts exclude the approximately $38 million in O&M costs of Ohio Edison and Toledo Edison for their respective leased shares of BVPS 2. as well as the approximately $17.5 million in costs of Ohio Edison for its leased share of Perry. The
$400 million amount would cover FENGenCo's share of estimated fixed O&M costs for a 2-year outage at either Peny, Davis-Besse, or BVPS (both units), or 18-month outages of any two units.
In view of the foregoing, the NRC staff concludes that tO applicants have provided s3uficlent information required for newly-forned entities, and have demonstrated reasonable assurance of adequate financial qualifications for FENGenCo as a non-electric utility pursuant to 10 CFR 50.33(f). Specifically, the NRC staff finds that FENGenCo Is financially qualified to hold the Penn Power interests proposed to be transferred, is financially qualified to hold the Ohio Companies' Interests proposed to be transferred, and Is financially qualified to hold the Penn Power and Ohio Companies' Interests simultaneously. However, to ensure that FENGenCo will continue to have an adequate source of funds, the NRC staff believes that the support agreements referenced In the applications should be subject to the following condition of the order approving the proposed license transfers and license conditions, essentially as follows:
The Support Agreements described In the applications dated May 18, 2005 (up to
$80 million), and June 1, 2005 (up to $400 miNion), shall be effective consistent with the representations contained In the applications. FENGenCo shall take no action to cause FIrstEnergy. or Its successors and assigns, to void, cancel, or modify the Support Agreements without the prior written consent of the NRC staff, except, however, the $80 million Support Agreement in connection with the transfer of the Penn Power Interests may be revoked or rescinded i and when the
$400 million support agreement described in the June 1, 2005 application becomes effective. FENGenCo shall Informn th Director of the Office of Nuclear Reactor Regulation, In writing, no later than ten days after any funds are provided to FENGenCo by FirstEnergy under either Support Agreement 42 Decommiss;oninn Fundina Assurance The NRC staff has determined that the requirement to provide reasonable assurance of decommissioning funding Is necessary to ensure te adequate protection of public health and safety. The regulation at 10 CFR 50.33(k), Contents of Applications; General Information,0 requires that an application for an operating license for a production or utilization facility contain information on how reasonable assurance will be provided that funds will be available to decommission the facility.
The May 18, 2005, application states that, at the time of the license transfers, all decommissioning funds In Penn Power's nuclear decommissioning tusts (NDTs) for BVPS and Perry will be transferred to FENGenCo. This application also states that FENGenCo's decommissioning trust funds are to be held In external ruts segregated from FENGenCo's assets and outside its administrative control. The funds are to be governed by a master NDT agreement with Mellon Bank, NA., as trustee, and the agreement terms will comply with the requirements of 10 CFR 50.75(hXl). A form of that agreement is provided in Exhibit J of the application.
The May 18,2005, application also states that, as of December 31, 2004, the NRC minimum formula amount for decommissioning funding assurance required for Penn Power's pro rate shares for BVPS I was $231.9 million; $49.0 million for BVPS 2; and $24.3 million for Perry. It also indicates that t 2004 year-end market value of Penn Power's NDT funds was approximately $108.1 million for BVPS 1; $25.3 million for BVPS 2; and $91.7 million for Perry.
The application also states that taking into account the NRC's allowed real rate of return earnings credit for decommissioning funds of 2 percent being applied to existing funds, the funds to be transferred will be approximately $71 million less than the NRC minimum required amount for BVPS I and BVPS 2 to be considered fully prepaid, and approximately $6 million less than the required amount for Perry. Therefore, FENGenCo will provide additional decommissioning funding assurance by obtaining a parent company guarantee from FirstEnergy in an intial amount of $BO million (in 2005 dollars), as permitted by 10 CFR 50.75(eXlXiu). The Initial $80 million amount will cover the $11 million for Penn Powers share of its funding requirement for BVPS plus the $6 million in additional assurance required for Perry. FENGenCo will recalculate the required funding levels each year, as required by 10 CFR 50.75(bX2), and as necessary. It will either obtain appropriate adjustments to the parent company guarantee or otherwise provide for any required additional funding.
Exhibit L of the application is a worksheet demonstrating compliance ith the NRC financial test for parent guarantees, pursuant to 10 CFR 50.75(eXlXIm1XS) and 10 CFR Part 30. Appendix A.
FENGenCo has selected the test In Section IIA2 of Appendix A to demonstrate compliance, and Exhibit M provides the form of the guarantee.
The June 1, 2005, application states that. at the time of the license transfers, aft decommissioning funds held by the Ohio Companies (excluding funds associated with leased Interests being retained by Ohio Edison and Toledo Edison) will be transferred to FENGenCo and will be held In external trust funds to be governed by a master NDT agreement with Mellon Bank, NA, as trustee, as described for the funds In the first application. Ohio Edison and Toledo Edison will retain the NDT fund portions associated with the leased interests in BVPS 2 and Perry for which they wil remain NRC possession licensees, including the earnings and the contributions related to those portions during 2005.
The June 1, 2005, application states that, as of December 31, 2004, the NRC minimum amount for decommissioning funding assurance required for Davis-Besse was $354.7 million. Taking Into account the 2-percent real rate of return credit. tht Davis-Besse required prepaid amount was $261.5 million. The reported market value of the Davis-Besse NDT was $348.3 million as of December 31, 2004, with an additional $29.0 million to be collected In 2005.
The application states that, as of December 31, 2004, the NRC required minimum decommissioning funding amount for he 82.18-percent share of Peny owned by the Ohio companies (excluding the 12.58-percent leased portion) was S381.3 million. Taking into account the 2-percent real rate of return credit, te required prepald amount for Perry was $235.5 million.
The reported market value of the Pony NDT was $290.6 million as of year-end 2004, with an additional expected 2005 collection of $24.1 million.
The application states that, as of December 31, 2004, the NRC required minimum decommnssionlng funding amount for the Ohio companies' 35-percent owned share of BVPS I was $124.8 million and $165.3 million for their 46.34prcent owned share of BVPS 2. Taking Into account the 2-percent real rate of return credits the required prepaid amount for BVPS I was
$93.8 million. The reported market value of the BVPS 1 NDT was $93.8 million as of year-end 2004, with an additional expected 2005 collection of $6.6 million. Taking into account the 2-percent real rate of return credit, the required prepaid amount for BVPS 2 was $100 million. The reported market value of the BVPS 2 NDT was $98.2 million as of year-end 2004, with an additional expected 2005 collection of $9.7 million.
The NRC staff finds upon analysis and review that the funds to be transferred to FENGenCo for the four reactors and other funding Information as stated above provide reasonable assurance that FENGenCo will be able to pay for the decommissioning costs of these units following the proposed transfers In both applications. This finding Is based In part on (1) the condition that Penn Power and the Ohio Companies will transfer all of their existing NDT funds (excluding those funds related to leased portions) for the four reactors, plus additional stated expected collections for 2005 to FENGenCo to be placed In corresponding external trusts for the four units; and, (2) the representation made In the first application that FENGenCo will obtain a parent company guarantee from FirstEnergy in an Initial amount of $80 million (in 2005 dollars) to provide additional decommissioning funding assurance for Penn Powers ownership interests in Perry and SVPS, with funding levels for the guarantee to be recalculated each year, and as necessary, FENGenCo will either obtain appropriate adjustments to the guarantee or otherwise provide for any required additional funding. Thus, the following should be made conditions of the order approving the direct license transfers to FENGenCo as well as license conditions, in essentially the language set forth below:
On the dosing date(s) of the transfers to FENGenCo of their interests In BVPS 1, BVPS 2, Davis-Besse, and Perry, Penn Power, Cleveland Electric, Ohio Edison, OES Nuclear, and Toledo Edison shall transfer to FENGenCo all of each transferor's respective accumulated decommissioning funds for BVPS 1, BVPS 2. Davis-Besse, and Perry, except for funds associated with the leased portions of Peny and BVPS 2, and tender to FENGenCo additional amounts equal to remaining funds expected to be collected in 2005 as represented In the application dated June 1, 2005. but not yet collected by the time of closing. All of the funds shall be deposited In separate external trust funds for each of these four reactors In the same amounts as received with respect to each unit to be segregated from other assets of FENGenCo and outside Its administrative control. as required by NRC regulations, and FENGenCo shall take all necessary steps to ensure that these external trust funds are mainined In accordance with the requirements of the order approving the transfer of the licenses and consistent with the safety evaluation supporting the order and in accordance with the requirements of 10 CFR Secfion 50.75, *Reportlng and recordkeeping for decommissioning planning."
By the date of dosing of the transfer of the ownership interests In BVPS 1, BVPS 2, and Perry, from Penn Power to FENGenCo, FENGenCo shall obtain a parent company guarantee from FirstEnergy in an Initial amount of at least $80 million (in 2005 dollars) to provide additional decommissioning funding assurance regarding such ownership Interests. Required funding levels shall be recalculated annually and, as necessary, FENGenCo shall either obtain appropriate adjustments to the parent company guarantee or otherwise provide any additional decommIssioning funding assurance necessary for FENGsnCo to meet NRC requirements under 10 CFR 50.75.
4.3 Antitrust Review and Existing Antitrust Conditions The Atomic Energy Act of 1954, as amended (the Act), does not require or authorize antitrust reviews of post-operating license transfer applications. Kansas Gas and Electrc Co., et at.
(Wolf Creek Generating Station, Unit 1). CLI-919, 49 NRC 441 (1999). The applications submitted by the licensee postdate the issuance of the operating licenses for the four reactor units, and therefore no antitrust review is required or authorized. The Department of Justice was contacted with respect to the proposed conforming license amendment changes to the existing antitrust conditions and bad no comments.
The Peny and Davis-Besse licenses contain antitrust conditions that date back to an Atomic Safety and Lcensing Appeal Board decision in 1979 (ALAB-560, 10 NRC 265). The applications proposed conforming license amendments such that, among other things, FENGenCo, In place of the current licensees (except for Ohio Edison, which will continue to be a licensee maintaining Its leased interest in Perry), would become subject to the antitrust conditions and be responsible for any actions of FENOC that contravene such conditions, while Cleveland Electric and Toledo Edison would be removed from (and thus no longer be subject to) the Davis-Besse antitrust conditions, and Cleveland Electric, OES Nuclear, Toledo Edison, and Penn Power would be removed from (and thus no longer be subject to) the Perry antitrust conditions. The applications are not proposing any changes to the substantive requirements set forth In the antitrust conditions, notwithstanding that FENGenCo Is not an integrated utility with transmission and distribution facilities and, therefore, would not appear to be able to perform certain actions specified by the antitrust conditions, such as wheeling, strictly on its own. Given that the proposed conforming amendments only seek to reflect that FENGenCo will become the holder of the licenses and that Cleveland Electric, OES Nuclear, Toledo Edison. and Penn Power will no longer be NRC licensees, the NRC staff finds the proposed amendments to the existing antitrust license conditions acceptable.
4.4 Foreign OwnershiD. Control. or Dominaton The Act prohibits the NRC from issuing a license for a nuclear power plant to "any corporation or other entity If the Commission knows or has reason to believe it Is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government.! The NRCs regulation at 10 CFR 50.38, Olneligibili'q of certain applicants," contains language to Implement this prohibition.
The applications initially stated that FENGenCo will be a wholly-owned subsidiary of FE Solutions, which In turn Is a wholly-owned subsidiary of FirstEnergy, both owners being U.S.
entities. All of the directors and principal officers of FE Solutions and FirstEnergy are U.S.
citizens, and the directors and principal officers of FENGenCo will be U.S. citizens. However, the July 15. 2005. supplement stated that FENGenCo will not be owned by FE Solutions as initially proposed, but Instead will be owned directly by FirstEnergy.
Section 13 of the Securities Exchange Act of 1934, as amended, 15 United States Code 78m(d),
requires that a person or entity that owns or controls more than 5 percent of the registered stock of a company must file certain schedules with the U.S. Securities and Exchange Commission (SEC). The applications state that FENOC, based on Its review of the relevant filings with the SEC, Is not aware of any alien, foreign corporation, or foreign government that holds more than 5 percent of the common stock of FirstEnergy, which is the parent company of FENGenCo, FE Solutions, and FENOC.
FENOC has Identified Capital Research and Management Company, State Street Corporation, and Barclays Global Investors, NA (Barclays) as having ownership or beneficial ownership of more than 5 percent, but less than 10 percent. of the common stock of FirstEnergy. These three companies are U.S. entities, but Barclays is a subsidiary of Barclays PLC, a United Kingdom ent.
According to the applications, Barclays does not-have a controlling interest In FirstEnergy and does not exercise domination or control over FirstEnergy. The NRC staff notes that the schedules filed by each of the foregoing entities are 13G schedules, which indicate that the relevant stock Is not being held for the purpose of changing or Influencing control of the issuer.
After reviewing the information provided in the applications, the NRC staff does not know or have reason to believe that FENGenCo will be owned, controlled, or dominated by a foreign Interest.
4.5 Nuclear Insurance and Indemnity The provisions of the Price-Anderson Act (Section 170 of the Act) and the Commission's regulations at 10 CFR Part 140, Flnancial Protection Requirements and Indemnity Agreements,- require that the current indemnity agreement be modified to reflect FENGenCo as the new owner of the current ownership Interests (excluding leasehold interests) of Penn Power, Cleveland Electric, Ohio Edison, OES Nuclear, and Toledo Edison in BVPS 1, BVPS 2. Davis-Besse, and Perry.
In accordance with the Price-Anderson Act, FENGenCo will be required to provide primary insurance and participate in the secondary retrospective insurance pool. It will also be required to maintain property Insurance as specified In 10 CFR 50.54(w). Information provided in the applications concerning financial qualifications demonstrates that FENGenCo will be able to satisfy applicable Insurance requirements of the NRC and the Price-Anderson Act.
Pursuant to 10 CFR Part 140, the NRC staff will require FENGenCo to provide satisfactory documentary evidence that It has obtained the appropriate amount of insurance required of licensees, prior to the issuance of the amended licenses reflecting the new licensee. Because the issuance of the amended licenses is directly fed to completion of the license transfers, the order approving the transfers will be conditioned as follows:
Prior to completion of the transfes of the licenses, FENGenCo shall provilde the Director of the Office of Nuclear Reactor Regulation satisfactory documentary evidence that it has obtained the appropriate amount of insurance required of licensees under 10 CFR Part 140 of the Commission's regulations.
4.6 Techncal Qualifications According to the applications, the proposed transfers of th ownership interests of Penn Power and the Ohio Companies will not result in any change to FENOC's role as the ricensed operator of BVPS, Davis-Besse, and Peny, and win not result In any changes to Its technical qualifications. There will be no change In FENOC's senior management team. Thus, the NRC staff has concluded that It need not make any findings with respect to technical qualifications other than that there will no effect on FENOC's technical qualifications since there Is no proposed change In operating authority or change in the current operators qualifications to operate STP.
5.0 CONFORMING AMENDMENTS 5.1 Introduction As stated previously, FENOC requested approval of proposed conforming amendments to Facility Operating License Nos. DPR-6B, NPF-73, NPF-3, NPF-58, for BVPS 1, BVPS 2.
Davis-Besse, and Peny, respectively. No physical or operating changes to the facilities are requested.
5.2 Discussion The changes to be made to the licenses are indicated in te conforming amendments in Enclosures 2, 3, 4, and 5 to the cover letter forwarding the NRC stffs order regarding the subject transfer. The changes do no more than accurately reflect Fe approved transfer action.
The amendments Involve no safety questions and are administrative in nature. Accordingly, the proposed amendments are acceptable.
5.3 State Consultation In accordance with the Commission's regulations, the Ohio and Pennsylvania State officials were notified of the proposed issuance of the amendments. The State officials had no comments.
5.4 Conclusion With Respect to the Conforming Amendments The Commission has concluded, based on the consIderations discussed above, that: (1) there is reasonable assurance that the healt and safety of the public will not be endangered by operation h the proposed manner, (2) such activities win be conducted In compliance with the Commission's regulations, and (3) the Issuance of the amendments will not be inimical to th common defense and security or to the health and safety of the public.
6.0 ENVIRONMENTAL CONSIDERATION
The subject application is for approval of a transfer of licenses Issued by the NRC and approval of conforming amendments. Accordingly, the actions Involved meet the eligibility criteria for categorical exclusion set forth In 10 CFR 51.22(cX21). Pursuant to 10 CFR 51.22(b), no environmental Impact statement or environmental assessment need be prepared In connection with approval of the application.
7.0 CONCLUSION
in view of the foregoing, the NRC staff finds that, subject to the conditions discussed herein, FENGenCo is qualified to hold the operating authority under the 10 CFR Part 50 licenses for BVPS 1, BVPS 2, Davis-Besse, and Perry, to the extent proposed in the applications, and that the transfers of these licenses to FENGenCo are otherwise consistent with applicable provisions of law, regulations, and orders Issued by the Commission pursuant thereto.
Principal Contributor A.F. McKelgney Date: