Technical Specifications for Amendment No. 198, to Eliminate MOR and Orer
ML060200056
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/13/2006
From: Moroney B
Plant Licensing Branch III-2
To: Stall J
Florida Power & Light Co
Moroney Brenden 301-415-3974
Shared Package
ML053550096 List:
References
TAC MC8317, TAC MC8318
Download: ML060200056 (2)


Text

ADMINISTRATIVE CONTROLS 6.9.1.2 The startup report shall address each of the tests identified in the FSAR and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a compari-son of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.

6.9.1.3 Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the Startup Report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial operation), supplementary reports shall be submitted at least every three months until all three events have been completed.

ANNUAL REPORTSV1 6.9.1.4 Annual reports covering the activities of the unit as described below for the previous calendar year shall be submitted prior to March 1 of each year. The initial report shall be submitted prior to March 1 of the year following initial criticality.

6.9.1.5 Annual reports shall include the results of specific activity analysis in which the primary coolant exceeded the limits of Specification 3.4.8. The following information shall be included: (1) Reactor power history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded; (2) Results of the last 1/ A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station.

ST. LUCIE - UNIT 1 6-16 Amendment No. 23, 68 .ai404, 4i. 198

ADMINISTRATIVE CONTROLS isotopic analysis for radioiodine performed prior to exceeding the limit, results of analysis while the limit was exceeded and results of one analysis after the radioiodine activity was reduced to less than the limit. Each result should include date and time of sampling and the radioiodine concentrations; (3) Clean-up system flow history starting 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to the first sample in which the limit was exceeded; (4) Graph of the 1-131 concentration and one other radioiodine isotope concentration in microcuries per gram as a function of time for the duration of the specific activity above the steady-state level; and (5) The time duration when the specific activity of the primary coolant exceeded the radioiodine limit.

MONTHLY OPERATING REPORTS 6.9.1.6 Deleted ST. LUCIE - UNIT 1 6-1 6a Amendment No. 40-1-. 198