ML053430253

From kanterella
Jump to navigation Jump to search

TS Withdraw of COLR Amendment - TACs MC5561 and MC5562
ML053430253
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/02/2005
From: Wang A
Plant Licensing Branch III-2
To: Oatley D
Pacific Gas & Electric Co
Wang A, NRR/DLPM, 415-1445
References
TAC MC5561, TAC MC5562.
Download: ML053430253 (5)


Text

December 2, 2005 Mr. David H. Oatley Acting Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - WITHDRAWAL OF THE REQUEST FOR RELOCATION OF TECHNICAL SPECIFICATION CYCLE-SPECIFIC PARAMETERS TO THE CORE OPERATING LIMITS REPORT (TAC NOS. MC5561 AND MC5562)

Dear Mr. Oatley:

By letter dated December 28, 2004, Pacific Gas and Electric Company (PG&E) applied for an amendment to the Facility Operating License No. DPR-80 and Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, (DCPP), respectively. The license amendment request (LAR) proposed to relocate certain reactor coolant system related cycle-specific parameters from the Technical Specifications (TS) to the Core Operating Limits Report (COLR) for DCPP. Subsequently, by letter dated September 22, 2005, PG&E requested to withdraw this LAR.

Accordingly, the subject TACs are being closed. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses with the Office of the Federal Register for publication.

Sincerely,

/RA/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

Notice of Withdrawal cc w/encl: See next page

December 2, 2005 Mr. David H. Oatley Acting Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 - WITHDRAWAL OF THE REQUEST FOR RELOCATION OF TECHNICAL SPECIFICATION CYCLE-SPECIFIC PARAMETERS TO THE CORE OPERATING LIMITS REPORT (TAC NOS. MC5561 AND MC5562)

Dear Mr. Oatley:

By letter dated December 28, 2004, Pacific Gas and Electric Company (PG&E) applied for an amendment to the Facility Operating License No. DPR-80 and Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, (DCPP), respectively. The license amendment request (LAR) proposed to relocate certain reactor coolant system related cycle-specific parameters from the Technical Specifications (TS) to the Core Operating Limits Report (COLR) for DCPP. Subsequently, by letter dated September 22, 2005, PG&E requested to withdraw this LAR.

Accordingly, the subject TACs are being closed. The Commission has filed the enclosed Notice of Withdrawal of Application for Amendments to Facility Operating Licenses with the Office of the Federal Register for publication.

Sincerely,

/RA/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 DISTRIBUTION:

and 50-323 PUBLIC LPLIV Reading

Enclosure:

Notice of Withdrawal RidsNrrDorl (CHaney/CHolden)

RidsNrrPMAWang cc w/encl: See next page RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (BJones)

RidsNrrDorlLpliv (DTerao)

RidsNrrDorlDpr ACCESSION NO.: ML OFFICE LPL4/PM LPL4/LA LPL4/BC NAME AWang LFeizollahi DTerao DATE 12/2/05 12/1/05 12/2/05 E:\\Filenet\\ML053430253.wpd OFFICIAL RECORD COPY

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NOS. 50-275 AND 50-323 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENTS TO FACILITY OPERATING LICENSES The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Pacific Gas and Electric Company (PG&E/the licensee) to withdraw its December 28, 2004, license amendment request (LAR) for proposed amendments to Facility Operating License No. DPR-80 and Facility Operating License No. DPR-82 for the Diablo Canyon Power Plant, Unit Nos. 1 and 2, respectively, located in San Luis Obispo County, California.

The proposed amendments would have relocated certain reactor coolant system related cycle-specific parameters from the Technical Specifications (TS) to the Core Operating Limits Report (COLR) for Diablo Canyon Power Plant, Units 1 and 2. The justification to implement this expansion of the COLR is provided in Westinghouse WCAP-14483-A, Generic Methodology for Expanding Core Operating Limits Report, approved by the NRC on January 19, 1999. PG&E had stated that the proposed changes are consistent with NRC-approved Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-339, Revision 2, "Relocate TS Parameters to COLR." However, during the course of this review the NRC staff has informed PG&E that previous approvals of COLR-related amendments may not have met the intent of 10 CFR 50.36 and that the NRC staff intends to issue a generic communication providing additional guidance to the industry. As no date has been established for issuance of the revised guidance, by letter dated September 22, 2005, the licensee withdraws this LAR.

The Commission had previously issued a Notice of Consideration of Issuance of Amendments published in the Federal Register on April 26, 2005 (70 FR 21460). However, by letter dated September 22, 2005, the licensee withdrew the proposed change. The licensee's application dated December 28, 2004, and the withdrawal letter dated September 22, 2005, are available in the NRC's Agencywide Documents Access and Management System (ADAMS) under Accession Numbers ML050040334 and ML053350345, respectively.

For further details with respect to this action, see the application for amendment dated December 28, 2004, and the withdrawal letter dated September 22, 2005. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the ADAMS Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams/html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this day of December 2005.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

October 2005 Diablo Canyon Power Plant, Units 1 and 2 cc:

NRC Resident Inspector Diablo Canyon Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Sierra Club San Lucia Chapter c/o Henriette Groot 1000 Montecito Road Cayucos, CA 93430 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408 Mr. Truman Burns Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Richard F. Locke, Esq.

Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 Mr. Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Mr. James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)

Sacramento, CA 95814 Mr. James R. Becker, Vice President Diablo Canyon Operations and Station Director Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 94111