Text
--- Entergoy Entergy Nuclear South Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6310 Fax 504-739-6698 jlaque~entergy.com Jason M. Laque Engineering Director, Acting Waterford 3 W3Fl-2005-0080 December 5, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
NRC Bulletin 2003-01 Response to Request for Additional Information Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38
Dear Sir or Madam:
By letter dated October 20, 2005, Entergy provided a response to your request for additional information (RAI) to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors for Waterford 3. On October 26, 2005, the NRC requested additional information as documented in attachment 1 of this letter.
The response to your request for additional information is included in attachment 1.
New commitments contained in this submittal are summarized in Attachment 2.
I declare under penalty of perjury that the foregoing is true and correct. Executed on December 5, 2005.
Si Director Attachment(s)
'' f 00
W3F11-2005-0080 Page 2 cc:
Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Morgan, Lewis & Bockius LLP ATTN: T.C. Poindexter 1111 Pennsylvania Avenue, NW Washington, DC 20004
Attachment I W3FI-2005-0080 NRC Bulletin 2003-01 RAI
Attachment I to W3F1-2005-0080 Page 1 of 1 NRC Request for Additional Information COA 5, "Refill of Refueling Water Storage Tank," you concluded that "this is currently covered under the SAMGs" without further explanation. Since the intent of the COA, as stated in WCAP-16204, Appendix A, is to include guidance in the EPGs/ERGs to ensure that "stating the prerequisites and line up for the refill will occur as soon as circumstances allow," and further, that for CE plants this guidance would be contained in the "LOCA Optimal recovery Guidelines(ORG) after step 21, LPSI Restart Criteria and in a similar location in the Functional Recovery Guideline," it is not understood how this guidance can be appropriately placed in the SAMGs. (FYI: for Westinghouse plants, the intent is stated another way - to be conducted when critical operator actions are completed but not until after transfer to recirculation).
Response
As documented in Waterford 3's letter W3F1 -2005-0058 dated 10/20/05, the refill of the RWSP is covered under the Severe Accident Management Guidelines (SAMGs).
Waterford 3 will put in procedures OP-902-002, Loss of Coolant Accident Recovery and OP-902-008, Functional Recovery Procedure, the requirement to line up and refill the RWSP as soon as critical operator actions are completed after a LOCA, but not until after switchover to recirculation.
W3FI-2005-0080 List of Regulatory Commitments to W3FI-2005-0080]
Page 1 of I List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED ONE- (C One)
COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE (If Required)
Waterford 3 will put in procedures OP-x 3/31/2006 902-002, Loss of Coolant Accident Recovery and OP-902-008, Functional Recovery Procedure, the requirement to line up and refill the RWSP as soon as critical operator actions are completed after a LOCA, but not until after switchover to recirculation.