December 1, 2005

Mr. W. Pearce

Acting Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

10 Center Road, A290

Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT - INFORMATION REQUEST FOR AN NRC

BIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI)

05000440/2006009(DRS)

Dear Mr. Pearce:

On January 30, 2006, the NRC will begin a biennial baseline Component Design Bases

Inspection (CDBI) at the Perry Nuclear Power Plant. A team of six inspectors will perform this

3-week inspection. This inspection will be performed in accordance with revised NRC baseline

Inspection Procedure 71111.21 and replaces the biennial Safety System Design and

Performance Capability inspection. Please note that the revised inspection procedure will be

available shortly.

The CDBI inspection focuses on components which have high risk and low design margins.

The components to be reviewed during this baseline inspection will be identified during an

information gathering visit and during the subsequent in-office preparation week. In addition, a

number of risk significant operator actions and operating experience issues, associated with the

component samples, will also be selected for review.

The inspection will include 4 weeks on-site, including the information gathering site visit and 3

weeks of on-site inspection. The inspection team will consist of six NRC inspectors. The

current inspection schedule is as follows:

Information gathering visit: Week of January 17, 2006

On-site weeks: January 30, 2006, February 13, 2006, and February 27, 2006

The purpose of the information gathering visits, is to meet with members of your staff to identify

potential risk-significant components, and operator actions. Additional information and

documentation needed to support the inspection will also be identified. A Region III Senior

Reactor Analyst will accompany the inspection team during the information gathering visit, to

review probabilistic risk assessment data and assist in identifying risk significant components,

which will be reviewed during the inspection.

W. Pearce

-2-

Experience with previous baseline design inspections of similar depth and length has shown

that these type of inspections are extremely resource intensive, both for the NRC inspectors

and the licensee staff. In order to minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for information needed for

the inspection. The request has been divided into three groups. The first group lists,

information necessary for a productive information gathering visit and for general preparation.

This information should be available to the Regional Office by no later than January 6, 2006.

Insofar as possible, this information should be provided electronically to the lead inspector.

Since the inspection will concentrate on high risk/low margin components, calculations

associated with your list of high risk components should be available for the inspectors to

review during the information gathering visit to assist in our selection of components based on

available design margin.

The second group of documents requested are those items which the team will need access to

when on-site. The third group lists information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important that all

of these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the on-site portions of the inspection. In

order to facilitate the inspection, we request that a contact individual be assigned to each

inspector to ensure information requests, questions, and concerns are addressed in a timely

manner.

The lead inspector for this inspection is Mr. Andrew Dunlop. We understand that our regulatory

contact for this inspection is Mr. Ken Russell of your organization. If there are any questions

about the inspection or the material requested in the Enclosure, please contact the lead

inspector at (630) 829-9726 or via e-mail at axd7@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by Andrew Dunlop Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Component Design Bases Inspection (CDBI) Document Request

W. Pearce

-3-

cc w/encl:

G. Leidich, President - FENOC

J. Hagan, Chief Operating Officer, FENOC

D. Pace, Senior Vice President Engineering and Services, FENOC

Director, Site Operations

Director, Regulatory Affairs

M. Wayland, Director, Maintenance Department

Manager, Regulatory Compliance

T. Lentz, Director, Performance Improvement

J. Shaw, Director, Nuclear Engineering Department

D. Jenkins, Attorney, First Energy

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

DOCUMENT NAME:E:\\Filenet\\ML053360602.wpd

G Publicly Available

G Non-Publicly Available

G Sensitive

G Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

ADunlop: LS

EDuncan

ADunlop for AMStone

DATE

11/29/05

12/1/05

12/1/05

OFFICIAL RECORD COPY

W. Pearce

-3-

cc w/encl:

G. Leidich, President - FENOC

J. Hagan, Chief Operating Officer, FENOC

D. Pace, Senior Vice President Engineering and Services, FENOC

Director, Site Operations

Director, Regulatory Affairs

M. Wayland, Director, Maintenance Department

Manager, Regulatory Compliance

T. Lentz, Director, Performance Improvement

J. Shaw, Director, Nuclear Engineering Department

D. Jenkins, Attorney, First Energy

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

W. Pearce

-4-

ADAMS Distribution:

GYS

WAM1

RidsNrrDipmIipb

GEG

KGO

RJP

CAA1

DRPIII

DRSIII

PLB1

JRK1

WDL (IRs only)

ROPreports@nrc.gov

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

1

Inspection Report: 05000440/2006009(DRS)

Information Gathering

Dates:

January 17-20, 2006

Inspection Dates:

January 30, 2006, through February 3, 2006, February 13-17,

2006, and February 27, 2006, through March 3, 2006

Inspection Procedure:

IP 71111.21, Component Design Bases Inspection

Lead Inspector:

Andrew Dunlop, Lead Inspector

(630) 829-9726

(axd7@nrc.gov)

I.

Information Requested Prior to the Information Gathering Visit

The following information is requested by January 6, 2005, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. (Please provide the information electronically in

.pdf files, Excel, or other searchable formats, preferably on CDROM. The CDROM

should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has a knowledge of boiling water reactor technology).

1.

Risk ranking of top 50 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2.

Provide a list of the top 500 cut-sets from your PSA.

3.

Risk ranking of operator actions from your site specific PSA sorted by RAW.

Provide copies of your human reliability worksheets for these items.

4.

If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire.

5.

Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

6.

List of high risk Maintenance Rule systems/components based on engineering or

expert panel judgement.

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

2

7.

A list of operating experience evaluations for the last 2 years.

8.

A list of modifications sorted by component identified in item 1.

9.

Information of any common cause failure of components experienced in the last

5 years at your facility.

10.

A list of the design calculations which provide the design margin information for

components included in item 1. (Calculations should be available during the

information gathering visit).

11.

List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

12.

Current management and engineering organizational chart.

II.

Information Requested to be Available on First Day of Inspection (January 30,

2006)

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 2 years.

2.

The corrective maintenance history associated with each of the selected

components for the last 2 years.

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of referenced material (such as drawings, engineering

requests, vendor letters).

4.

Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

6.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

7.

Trend data on the selected electrical/mechanical components performance for

last three years (For example, pumps performance including in-service testing,

other vibration monitoring, oil sample results, etc., as applicable).

8.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

INFORMATION REQUEST FOR PERRY NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION (CDBI)

Enclosure

3

III.

Information Requested to be provided throughout the inspection

1

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3.

Reference materials (make available if needed during all on-site weeks):

General set of plant drawings;

IPE/PRA report;

Procurement documents for components selected (verify retrievable);

Plant procedures (normal, abnormal, emergency, surveillance, etc.);

Technical Specifications;

Updated Final Safety Analysis Report; and

Vendor manuals.