L A P A subsidiary ofPinnade Wat Capital Corporation 10 CFR 50.55a Craig K Seaman
- Director, Mail Staion 7636 Regulatory Affairs P.O. Box 52034 Palo Verde Nuclear Tel. 623-393-5421 Phoenix, Arizona 85072-2034 Generating Station Fax 623-393-5442 CSeaman@apsc.oom 102-05348-CKS/TNW/RJR September 26, 2005 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3, Docket No. STN 50-530 Analysis of Reactor Vessel Material Surveillance Capsule at 2300 Pursuant to 10 CFR 50, Appendix H, this letter transmits the attached copy of Westinghouse Report WCAP-1 6449-NP, "Analysis of Capsule 230' from Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program,"
dated August 2005. APS completed Unit 3's Refueling Outage on December 7, 2004.
The report presents the results of the examination of the Unit 3 surveillance capsule removed from the 230° location and' is the second capsule to be removed from the reactor. The 230° capsule was removed from the reactor vessel during Unit 3's 11]
refueling outage after 13.75 effective full power years (EFPY) of plant operation (exposure).
Based on the enclosed surveillance capsule test results, properties of the reactor beltline materials are predicted to remain more than adequate for continued safe plant operation through the end of the current license (about 32 EFPY) and a potential license renewal (to about 54 EFPY). The surveillance results presented in the enclosed report do not change the value of RT (PTS) calculated for Palo Verde pursuant to 10 CFR 50.55a. No changes to the current PVNGS Technical Specification are required as a result of this Analysis.
AoeS A member of the STA2RS :(Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South. Texas Project
- Wolf Creek
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk U3 Reactor Vessel Material Surveillance Capsule at 2300 Page 2 This letter does not make any commitments to the NRC. Please contact Thomas N.
Weber at (623) 393-5764 if you have any questions or require additional information.
Since I CKSJTNWIRJRIca Attachment WCAP-16449-NP, *Analysis of Capsule 2300 from Arizona Public Service Company Palo Verde Unit 3 Reactor Vessel Radiation Surveillance Program', dated August 2005.
cc:
B. S. Mallett M. B. Fields G. G. Wamick