|
---|
Category:E-Mail
MONTHYEARML21075A1582021-03-15015 March 2021 E-mail from T. Silko to J. Parrott, NMSS, Vermont Yankee on the State of Vermont Comments on the Review of the Draft Final SER and EA for 20.2002 Alternate Disposal Request ML21006A0242020-12-22022 December 2020 E-mail from J. Parrott to J. Tierney and N. Creed Vermont Yankee Request to NRC for Alternate Disposal of Wastewater ML20358A0702020-12-22022 December 2020 E-mail Acceptance Review for Request for Indirect License Transfer (License DPR-28, Docket No. 50-271) ML20175A2122020-06-23023 June 2020 Acceptance Review of Request for Alternate Disposal of Wastes Under 10 CFR 20.2002 (License DPR-28, Docket No. 50-271) ML19289A1292019-10-11011 October 2019 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML19288A0292019-10-11011 October 2019 NRC Acceptance Review - Northstar Request for Exemption from 10 CFR 20, App G, Section Iii.E (License DPR-28, Docket No. 50-271) ML19198A2512019-06-20020 June 2019 Alternate Disposal Request - Rail Shipments (License DPR-28, Docket No. 50-271) ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18289A3622018-10-11011 October 2018 Email from Daniel Doyle to Mark Leyse Status of PRM-50-93 and PRM-50-95 ML18127A5582018-04-25025 April 2018 Email to State of Vermont on Vermont Yankee Nuclear Power Station - Forthcoming Issuance of a License Amendment Regarding the Requirement for the VYNPS to Have a Cyber Security Plan ML18045A0862018-01-25025 January 2018 Email Request for Review of the Draft Safety Evaluation for Implementation of a Revised Emergency Plan at Vermont Yankee to Reflect an ISFSI-only Configuration ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17229B4842017-08-16016 August 2017 Request for Supplemental Documentation to Support Review of the Physical Security Plan ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17055A6262017-02-24024 February 2017 Cover Email from VY Shpo W Concurrence on No Effects Determination ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML17012A2472017-01-11011 January 2017 E-mail - State of Vermont Comments Regarding Vermont Yankee'S 10 CFR 20.2002 Request ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML17013A2502016-12-12012 December 2016 Email Requesting Review of Draft EA and SER for Vermont Yankee Request to NRC for Alternate Disposal of Waste ML16231A0282016-08-11011 August 2016 Response to NRC Questions Related to Request for 20.2002 Disposal of Contaminated Water ML16231A2192016-07-28028 July 2016 Follow-up Questions Related to Entergy Request for 20.2002 Disposal of Contaminated Water ML16069A0952016-03-0303 March 2016 Request for 20.2002 Disposal, Request for Additional Information ML16053A5152016-02-17017 February 2016 Comment (037) of Emma Stamas on ANPR-26, 50, 52, 73, and 140 - Regulatory Improvements for Decommissioning Power Reactors ML15329A1802015-11-24024 November 2015 E-mail from J. Whited Draft RAIs Re Duke License Amendment Request to Adopt TSTF-523 (CAC Nos. MF6413 Through MF6422) ML15295A2132015-10-21021 October 2015 NRR E-mail Capture - VY RAI for Off-site Insurance Exemption (10 CFR 140.11) - MF3980 ML15289A6002015-09-24024 September 2015 La 3 - Vermont Yankee Draft Responses or Edits 9 24 15.docx ML15289A6012015-09-23023 September 2015 La 3 - Nrr_Vermont Yankee Nuclear Power Station Decommissioning Status.Docx ML15288A3532015-09-21021 September 2015 La 3 - VY Dtf LAR - Status ML15257A6172015-09-14014 September 2015 La 3 - Testing the New Profile for Vermont Yankee La 3 - Public ML15195A3592015-07-14014 July 2015 NRR E-mail Capture - Acceptance Review for Vermont Yankee Amendment -Revise Cyber Security Plan Implementation ML15289A0022015-06-17017 June 2015 La 3 - Question from Ma ML15289A5982015-06-0909 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 5 2015 Letter from Vermont, Vynpc, and Gmp to NRC Attached ML15289A0072015-06-0505 June 2015 La 3 - Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15289A2432015-06-0404 June 2015 La 3 - FW: Docket No. 50-271 (Vermont Yankee); June 4 2015 Vermont Letter to NRC Attached ML15289A0062015-06-0404 June 2015 La 3 - FW: Information Regarding Vermont Yankee Decommissioning Trust Fund Exemption ML15288A3592015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3602015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A3622015-06-0101 June 2015 La 3 - Vermont Yankee LA3 - Availability for Oral Argument ML15288A4822015-05-22022 May 2015 La 3 - Vermont Reply to NRC & Entergy Answers Re VY LA-3 ML15289A0042015-05-19019 May 2015 La 3 - New Proposal Dates for Phone Call with VT ML15289A0052015-05-11011 May 2015 La 3 - ML Numbers for Disbursement Letters for Vermont Yankee ML15289A5992015-05-0808 May 2015 La 3 - Call with State of VT ML15289A0032015-05-0707 May 2015 La 3 - Other than for Comanche Peak, ML15289A1252015-05-0606 May 2015 La 3 - FRN Review - VY Dtf Exemption ML15128A0232015-04-27027 April 2015 NRR E-mail Capture - Petitioners Response to Request for Comments on the Proposed Director'S Decision on the 2.206 Petition Regarding Financial Qualifications of Entergy 2021-03-15
[Table view] |
Text
. - - - - - - - - - - - - -- 3 I Rick Ennis - FMd: imagies for VY SD II1 Pane 1 Paoe I Rick Ennis Fwd: images for VY SD From: John White To: Rick Ennis Date: 11/3/05 10:44AM °(0L(5)
CFP z-IO CF IC
Subject:
Fwd: Images forVY SD CC: Anne Passarelli; Cliff Anderson
Ic:\temrpNGWI00001 .TMP Page Paae 1II1 I c:temD\GW1OOOQ1 .TMP Mail Envelope Properties (436A3022.936 3: 26073)
Subject:
Fwd: images for VY SD Creation Datc: 11/3/05 10:43AM From: John White Created By: JRWI@nrc.gov Recipients nrc.gov kplpo.KPDO AEP CC (Anne Passarelli )
CJA CC (Cliff Anderson) nrc.gov ourf4_po.OWlFNDO RXE (Rick Ennis)
Post Office Route k-plpo.KPDO nrc.gov of4_po.OWFNDO nrc.gov Files Size Date & Time MESSAGE 1141 11/03/05 10:43AM Mail Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard
Rick Ennis - Fwd: images for VY SD Page 1 l From: Anne Passarelli To: John White Date: 1112105 5:17PM
Subject:
Fwd: images for VY SD , 10 CFR Z. 3 'l (ad)(5 )
Rick Ennis - Images for VY SD Pag From: Anne Passarelli To: Brian Holian; Cliff Anderson Date: 11/2/05 5:13PM
Subject:
images for VY SD See fax diagrams.
Also, attached reports Including photos. Open them with WordViewer.
Nothing Is public yet.
Anne Passarelli, 610-337-5078 Reactor Inspector Plant Support Branch 2 Division of Reactor Safety Region I CC: Beth Sienel; Ed Knutson
A - Entergy AR EVA Vermont Yankee.RFO-25 In-Vessel Visual Inspection Indication Notification Form Date: 29 Oct 05 INF # 001 Time: 0400 Component: DVD Number: DVD
Title:
HE-V1 @ 270 Disk 8 2 HA-V4 @ 90 Disk.10 12 Descriptionof Condition:
During the VT-1 examination of HE-VI @ 270 nine linearindicationswere observed in the base metal on the left side of the weld. See attachedpictures.
During the VT-1 examination of HA-V4. @ 90 six linearindications were observed in the base metal on the left side of the weld. See attachedpictures.
FramatomeLevel 111:
CustomerAcknowledgement: Date:
(Return Copy to FANP for Records) 1 of 14
A Entergy AREVA 1st indication from the top 2 of 14
A , En tergy AREVA 2nd Indication from the top 3of14.
A - Entergy AREVA 3 rd Indication from the top 4 of 14
A Entergy ARE VA 4' Indication from the top 5 of 14
A Entergy AREVA 5"' and 6h Indication from the top 6 of 14
A 'Entergy AREVA 6th and 7 th Indication from the top 7 of 14
A . Enterg~y AREVA 8th Indication from the top 8 of 14
A .
`Ad Entei-D7 I
ARE VA 9 th Indication from the top 9 of 14
A d Etntesrgy ARE VA Ist Indication from the top
... ,,II .t *-.....
10 of 14
A -- E77tergy AREVA 2 nd Indication ftom the top 11 of 14
A ., Entergy AREVA 4 Ic 3 rd 3and Indication ffrom the top 12 of 14
A , Entergy ARE VA 5'hIndication from the top 13 of 14
A -~Entergy AR EVA 6t' Indication from the top 14 of 14
A --Entergy ARE VA Vermont Yankee RFO-25 In-Vessel Visual Inspection Indication Notification Form Date: 30 Oct 05 INF # 002 Time: 1500 Component: DVD Number: DVD
Title:
HB-V04 Disk 5 7 Description of Condition:
During the VT-I examination of HB-V04 ten linearindicationswere observed in the base metal on the left side of the weld (see attachedpictures). RFO 24 data identified 7 indications (ref. INR VYR24-04-02 R2). Review of RFO-24 video revealed 9 of the 10 indicationsidentified in the RFO-25 video. No discernable change was notedin those indications which couldbe correlated.
The one unidentified indicationduring RFO-24 was due to technique differences and does not have the appearanceof being a new indication. It is similarin size and location to the other indicationson this component.
FramatomeLevel Ill:
CustomerAcknowledgement: -
Date:
(Return Copy to FANP for Records) 1 of 10
A Entergy AREVA Ist indication from the top 2 of 10
A !_ Et AR EVA 2 nd Indication from the top 3 of 10
A - Entergy AR EVA 3rd Indication from the top 4 of 10
A -- Entergy AREVA 4 Indication from the top 5 of 10
A Entergy AREVA 5t Indication from the top 6 of 10
A Enlter~gy AR EVA 6 h Indication from the top 7 of 10
A -En tergy AREVA 7th Indication from the top 8 of 10
A - Entergy AREVA 8 and 9 Indication from the top 9 of 10
A -- Entergy AREVA 1 0 th Indication from the top 10 of 10
A ~ Entergy AREVA Vermont Yankee RFO-25 In-Vessel Visual Inspection Indication Notification Form Date: 31 Oct 05 INF # 003 Time: 0530 Component: DVD Number: DVD
Title:
HE-V4@270 Disk 18 2 Descriptionof Condition:
During the VT-1 examination of HE-V4@270 one linearindication was observed in the base metal on the right side of the weld (see attachedpicture).
Framatome Level l/l:
CustomerAcknowledgement: Date: _ _ _-
(Return Copy to FANP for Records) 1 of 2
A - Entergy AR EVA Indication on Weld IAE-V4@270 2of2