.;r :-A EA-03-097 Palo Verde Nuclear Generating Station Gregg R. Overbeck Senior Vice President Nuclear TEL (623) 393-5148 FAX (623) 393-6077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 102-05147-GRO/SAB/DGM September 3, 2004 Secretary Office of the Secretary of the Commission U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission ATTN: Margaret V. Federline Room 8 D41, Mail Stop. 8 A23 Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852-2738
Reference:
- 1) Order dated August 18, 2004, Requiring Implementation of Additional.
Security Measures Associated with Access Authorization for Palo Verde Nuclear Generating Station Units 1, 2 and 3 ("Order EA 097"or "Order")
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket No. STN 50-528; 50-529; 50-530 License No. NPF-41; NPF-51; NPF-74 Response to 20 Day Request and Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization for Palo Verde Nuclear Generating Station Units 1, 2 and 3 and Report of Full Compliance
Dear Sirs:
Via reference 1, the U.S. Nuclear Regulatory Commission (NRC or Commission) issued an Order to APS that modifies the current operating licenses for PVNGS Units 1, 2 and
- 3. The Order is immediately effective and requires compliance with specified additional security measures for the independent spent fuel storage installation (ISFSI) as stated in an attachment to the Order.
Information In this record was deleted in accordance with the Freedom of 1nfor`ation Act, xemPtons 3 FBIA.
-3 ENCLOSURES CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE REMAINS EXEMPT FROM PUBLIC DISCLOSURE
U. S. Nuclear Regulatory Commission ATTN: Margaret V. Federline Response to 20 Day Request and Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization and Report of Full Compliance Page 2 The Order requires a 20-day response to Conditions B.1, B.2 and C.1 of Section III of the Order. Enclosure 1 to this letter provides that 20-day response for APS. Enclosure 2 is a description of the actions being taken by APS to comply with the Order.
This response also reports full compliance with the order as required by Condition C.2 of Section IlIl of the Order. Enclosure 2 to this letter describes the method of compliance.
This response is hereby submitted to the Commission in accordance with 10 CFR 50.4 and 10 CFR 2.202. If you have questions regarding this submittal, please contact me at 623-393-5148 or Mr. Scott Bauer, Department Leader, Regulatory Affairs, at (623) 393-5978.
Arizona Public Service Company makes no commitments in this letter.
Some of the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
The remainder of this response contains sensitive unclassified information related to physical protection as defined by 10 CFR 2.390(d)(1) and is exempt from public disclosure.
Sincerely, GRO/SAB/DGM/dgm
Enclosures:
- 1) 20 Day Response and Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization for Palo Verde Nuclear Generating Station Units 1, 2 and 3
- 2)
Schedule For Achieving Compliance With The Order cc:
Director, Office of Nuclear Material Safety and Safeguards Assistant General Counsel for Materials Litigation and Enforcement ENCLOSURES CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE REMAINS EXEMPT FROM PUBLIC DISCLOSURE
! se EtZl
- teoltTi;
I
'J U. S. Nuclear Regulatory Commission ATTN: Margaret V. Federline Response to 20 Day Request and Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization and Report of Full Compliance Page 3 B. S. Mallett M. B. Fields N. L. Salgado NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS ENCLOSURES CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE REMAINS EXEMPT FROM PUBLIC DISCLOSURE
U. S. Nuclear Regulatory Commission ATTN: Margaret V. Federline Response to 20 Day Request and Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization and Report of Full Compliance Page 4 STATE OF ARIZONA COUNTY OF MARICOPA
) ss.
1, Gregg R. Overbeck, represent that I am Senior Vice President - Nuclear, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, and that to the best of my knowledge and belief, the statements made therein are true and correct.
Gregg R verbeck Sworn To Before Me ThiW
( d Day Of 7Of X), 2004.
c4LD& (cr
Io Mt-6.
Notary Pgb1c SUSIE LYNN ERGISH Notary Public - Arizona Mailcopa County My Comm. Expires Jul 14.2007 I
I 0
Notary Commission Stamp ENCLOSURES CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE REMAINS EXEMPT FROM PUBLIC DISCLOSURE
T-1 A
I l
I ENCLOSURE I I
20 Day Response and Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization For Palo Verde Nuclear Generating Station Units 1, 2 and 3 ENCLOSURES CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE REMAINS EXEMPT FROM PUBLIC DISCLOSURE
~ =
i
~
M I,
ENCLOSURE 2 Schedule For Achieving Compliance With The Order ENCLOSURES CONTAIN SAFEGUARDS INFORMATION UPON StPARATION THIS PAGE REMAINS EXEMPT FROM PUBLIC DISCLOSURE