ML053220530
Jump to navigation
Jump to search
| ML053220530 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/25/2004 |
| From: | Thomas Koshy Office of Nuclear Reactor Regulation |
| To: | Gody A NRC Region 4 |
| References | |
| FOIA/PA-2004-0307 | |
| Download: ML053220530 (1) | |
Text
ITony God _- Fwd: RE: Electronic Copy of Palo Verde Switchyard Voltage Pg From:
Thomas Koshy To:
Gody, Tony Date:
Fri, Jun 25, 2004 12:12 PM
Subject:
Fwd: RE: Electrohic Copy of Palo Verde Switchyard Voltage APS has agreed to add a second level of protection between 500 KV and 230 KV switchyard.
Attached is the email from steve Thomas Koshy, email:txk@ nrc.gov, Tel:(301)415-1176 Electrical Engineering Section Electrical, Instrumentation & Controls Branch Mail Stop 0-4A15A CC:
Calvo, Jose; Jenkins, Ronaldo "LbwJ