ML053180065
| ML053180065 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/26/2005 |
| From: | Entergy Nuclear Indian Point 2 |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2005-0369 CR-IP2-2005-03470 | |
| Download: ML053180065 (1) | |
Text
-Entergy ADMIN l CR-IP2-2005-03470 Initiated Date: 8/26/2005 11:22 Owner Group :Eng Project Mgmt Current
Contact:
Current Significance: C - REVIEW & CORRECT Closed by: Schmidt,George P 9/15/2005 12:13 Summary
Description:
During excavation of Unit 2 Fuel Storage Building loading bay area in support of the dry cask storage project, a hole opened up in the soil beneath the east loading bay cinder-block wall. This does NOT effect the integrity of the spent fuel pool, which is a separate structure. The cinder-block wall remains structurally sound because it is supported by coulmn-to-column beams.
Remarks
Description:
Closure
Description:
Per CA&A review noted the CR owner recommended closure of this CR.
Per CA&A review, concur with the CR owner's recommendation to close the CR. The issue was resolved, therefore this CR closed.