ML053110368

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 192 Regarding Revise TS 3.6.3, Containment Isolation Valves Surveillance Requirements
ML053110368
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/03/2005
From:
Plant Licensing Branch III-2
To:
Donohew J N, NRR/DLPM,415-1307
Shared Package
ML052780499 List:
References
TAC MC5828, TAC MC5829
Download: ML053110368 (2)


Text

T Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS


NOTE----------_-_-_-_____-__-___-_-_

Section A, B, C, D, and E isolation valves are located in the LCS.

SURVEILLANCE FREQUENCY SR 3.6.3.1 Verify each 42 inch purge valve is sealed 31 days closed except for one purge valve in a penetration flow path while in Condition D of this LCO.

SR 3.6.3.2 Verify each 8 inch purge valve is closed 31 days except when the 8 inch purge valves are open for pressure control, ALARA or air quality considerations for personnel entry, or for Surveillances that require the valves to be open.

SR 3.6.3.3 -------------- NOTES--------------------

1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2. SR 3.0.4 is not applicable Verify each containment isolation manual valve 31 days and blind flange that is located outside containment and not locked, sealed, or otherwise secured and is required to be closed during accident conditions As closed, except Il for containment isolation valves that are open under administrative controls.

(continued)

SAN ONOFRE--UNIT 3 3.6-13 Amendment No. 192-

Containment Isolation Valves 3.6.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEI LLANCE FREQUENCY

.9 SR 3.6.3.4 ------------ NOTES--------------1---

1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2. SR 3.0.4 is not applicable.

Verify each containment isolation manual valve Prior to and blind flange that is located inside entering MODE 4 containment and not locked, sealed, or from MODE 5 if otherwise secured and required to be closed during accident conditions is closed, except not performed within the I

for containment isolation valves that are open previous under administrative controls. 92 days SR 3.6.3.5 Verify the isolation time of each Section A In accordance and B power operated and each automatic with the containment isolation valve iswithin limits. Inservice Testing Program SR 3.6.3.6 ---------------- NOTES-----------------

Results shall be evaluated against acceptance criteria applicable to SR 3.6.1.1 Perform leakage rate testing for containment 184 days purge valves with resilient seals.

Within 92 days after opening the valve (continued)

SAN ONOFRE--UNIT 3 3.6-14 Amendment No. 192