Duke Energy Corporation Plans for Submitting a Combined Construction and Operating License (COL) Application
ML053050378
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 10/25/2005
From: Barron H
Duke Energy Corp
To: Matthews D
Document Control Desk, Division of Regulatory Improvement Programs
References
FOIA/PA-2008-0001
Download: ML053050378 (2)


Text

-

_ Duke HENRYB. BARRON Group VP, Nuclear Generation and WUUEne e

Chief Nuclear Officer Duke Power EC07H1526 South Church Street Charlotte, NC 28201-1006 Mailing Address:

October 25, 2005 P.O. Box 1006-EC07H Charlotte, NC 28201-1006 704 3822200 Document Control Desk 7043826058 U.S. Nuclear Regulatory Commission hbarTofOduke-enepy~com Washington, DC 20555-0001 Attention:

David Matthews, Director Division of Regulatory Improvement Programs

Subject:

Duke Energy Corporation Plans for Submitting a Combined Construction and Operating License (COL) Application The purpose of this letter is to update the NRC Staff regarding Duke Energy Corporation's (Duke's) plans for development of a Combined Construction and Operating License (COL) application, to notify the Staff regarding Duke's selection of a reactor technology, and to request allocation of Staff resources to pre-application interactions with Duke. Duke has completed its technology evaluation, and has decided to develop a COL application for two AP-1 000 reactors. The selection of a site is in progress and on schedule for completion by the end of calendar year 2005. While detailed schedule information is in development, Duke's target schedule for submittal of a COL application remains consistent with our previous discussions (i.e., late 2007 or early 2008).

By letter dated March 4, 2005 (Barron to US NRC Document Control Desk, Plans for Submitting a Combined Construction and Operating License [COL] Application), Duke notified the Staff of Duke's intent to prepare a COL application, including a preliminary schedule for award of a contract for support of an application beginning in May 2005.

Subsequently, on March 14, 2005, Duke personnel met with the Staff to discuss additional details of Duke's plans. As a result of a study of the scope, schedule, and costs for preparing a COL application, Duke determined that selection of a site and a reactor technology should be conducted separately from preparation of the COL application, and prior to selection of a contractor to support that activity. Accordingly, award of a contract for COL application support was deferred until later in 2005.

A-O www.duke-energy.com

Document Control Desk October 25, 2005 Page 2 of 2 Duke wishes to initiate the pre-application discussions mentioned in our previous letter, and to request allocation of Staff resources for this purpose. We propose to meet at your convenience to discuss these interactions. Please contact Peter Hastings at (980) 373-7820 to discuss details of such a meeting, or if you have any questions.

Sincerely, Henry B. Barron xc:

William Beckner, USNRC/HQ Laura Dudes, USNRC/HQ Frank Gillespie, USNRC/HQ Bryan Dolan Peter Hastings John Thrasher