ML053050017

From kanterella
Jump to navigation Jump to search

11/3/05 Fort Calhoun, Correction Letter Amendment No. 226
ML053050017
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/03/2005
From: Wang A
NRC/NRR/ADRO/DORL/LPLG
To: Ridenoure R
Omaha Public Power District
Wang A, NRR/DLPM, 415-1445
Shared Package
ML053080196 List:
References
TAC MC0194
Download: ML053050017 (4)


Text

November 3, 2005 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

CORRECTION TO AMENDMENT NO. 226 (TAC NO. MC0194)

Dear Mr. Ridenoure:

On May 7, 2004, the Commission issued Amendment No. 226 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment modified Technical Specification (TS) 2.1.4, "Reactor Coolant System (RCS) Leakage Limits," by (1) adding a requirement for no RCS pressure boundary leakage, (2) combining the existing RCS leakage limits into a format similar to the Improved Standard TS (ISTS), and (3) replacing the existing basis associated with this TS with a basis similar in format and content to the ISTS.

The amendment was in response to your application dated July 25, 2003, and its supplement dated December 5, 2003.

The TS pages that were issued with Amendment No. 226 were incorrect. By letter dated June 17, 2004, we re-issued the insert/remove page and the corrected TS pages. However, as a result of a current review regarding these TS pages, we have determined that we did not issue all the corrected TS pages associated with Amendment 226. We only issued pages 2.1 -

Page 13 to 2.1 - Page 17. Due to pagination changes, pages 2.1 - Page 18 to 2.1 - Page 24 were also revised. Enclosed are the corrected TS pages 2.1 - Page 13 to 2.1 - Page 24. We apologize for any inconvenience this may have caused.

Sincerely,

/RA/

Alan Wang, Project Manager Plant Licensing Branch G Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Enclosures:

1. Insert/Remove Page
2. TS Pages cc w/encls: See next page

November 3, 2005 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Post Office Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

CORRECTION TO AMENDMENT NO. 226 (TAC NO. MC0194)

Dear Mr. Ridenoure:

On May 7, 2004, the Commission issued Amendment No. 226 to Renewed Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. The amendment modified Technical Specification (TS) 2.1.4, "Reactor Coolant System (RCS) Leakage Limits," by (1) adding a requirement for no RCS pressure boundary leakage, (2) combining the existing RCS leakage limits into a format similar to the Improved Standard TS (ISTS), and (3) replacing the existing basis associated with this TS with a basis similar in format and content to the ISTS.

The amendment was in response to your application dated July 25, 2003, and its supplement dated December 5, 2003.

The TS pages that were issued with Amendment No. 226 were incorrect. By letter dated June 17, 2004, we re-issued the insert/remove page and the corrected TS pages. However, as a result of a current review regarding these TS pages, we have determined that we did not issue all the corrected TS pages associated with Amendment 226. We only issued pages 2.1 -

Page 13 to 2.1 - Page 17. Due to pagination changes, pages 2.1 - Page 18 to 2.1 - Page 24 were also revised. Enclosed are the corrected TS pages 2.1 - Page 13 to 2.1 - Page 24. We apologize for any inconvenience this may have caused.

Sincerely,

/RA/

Alan Wang, Project Manager Plant Licensing Branch G Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Enclosures:

1. Insert/Remove Page
2. TS Pages DISTRIBUTION:

cc w/encl: See next page PUBLIC LPLG Reading DTerao RidsNrrPMAWang RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn4MailCenter (DGraves)

TBoyce GHill (2)

PKG: ML053080196 TS Pages: ML053050155 Nrr-100 ACCESSION NO.: ML053050017 Nrr-058 OFFICE NRR/LPLG/LA NRR/LPLG/PM NRR/LPLG/BC NAME LFeizollahi AWang DTerao DATE 11/3/05 11/3/05 11/3/05 OFFICIAL RECORD COPY

ATTACHMENT TO LICENSE AMENDMENT NO. 226 RENEWED FACILITY OPERATING LICENSE NO. DPR-40 DOCKET NO. 50-285 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

REMOVE INSERT 2.1 - Page 13 2.1 - Page 13 2.1 - Page 14 2.1 - Page 14 2.1 - Page 15 2.1 - Page 15 2.1 - Page 16 2.1 - Page 16 2.1 - Page 17 2.1 - Page 17 2.1 - Page 18 2.1 - Page 18 2.1 - Page 19 2.1 - Page 19 2.1 - Page 20 2.1 - Page 20 2.1 - Page 21 2.1 - Page 21 2.1 - Page 22 2.1 - Page 22 2.1 - Page 23 2.1 - Page 23 2.1 - Page 24 2.1 - Page 24

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 Lucas State Office Building, 5th Floor 321 East 12th Street Chairman Des Moines, IA 50319 Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Centential Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550 September 2005