Category:Letter
MONTHYEARIR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000346/20230112023-08-30030 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000346/2023011 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000346/20230052023-08-24024 August 2023 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2023005) L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20230502023-08-0303 August 2023 Special Inspection Report 05000346/2023050 IR 05000346/20230902023-08-0101 August 2023 EA-23-002 Davis-Besse Nuclear Power Station - NRC Inspection Report No. 05000346/2023090 (Public) ML23178A2742023-08-0101 August 2023 Letter to the Honorable Marcy Kaptur from Chair Hanson Responds to Letter Regarding the License Transfer Application for the Davis-Besse Nuclear Power Station L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program IR 05000346/20230022023-07-27027 July 2023 Integrated Inspection Report 05000346/2023002 ML23193A7842023-07-13013 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000346/2023402 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23160A2342023-06-13013 June 2023 Confirmation of Initial License Examination L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models IR 05000346/20235012023-06-13013 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000346/2023501 L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) ML23131A2732023-05-15015 May 2023 Notification of NRC Supplemental Inspection 95001 and Request for Information L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection IR 05000346/20230102023-05-0909 May 2023 Commercial Grade Dedication Inspection Report 05000346/2023010 ML23123A1272023-05-0303 May 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20230012023-05-0101 May 2023 Integrated Inspection Report 05000346/2023001 and 07200014/2022001 L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 ML23111A1972023-04-26026 April 2023 Information Meeting with Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Plant Station ML23114A1062023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-14014 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23096A1382023-04-11011 April 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage ML23066A2892023-03-14014 March 2023 Request for Threshold Determination Under 10 CFR 50.80 and 10 CFR 72.50 for an Amendment to the Voting Agreement ML23066A2592023-03-14014 March 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2, Davis Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 2024-02-02
[Table view] |
Text
October 28, 2005 Mr. Robert Freeman, Manager Environmental Health, Safety and Licensing Framatome ANP, Inc.
Mt. Athos Road Facility Lynchburg, VA 24506-1646
Dear Mr. Freeman,
We would like to inform you of our having developed a Temporary Instruction (TI) 2600/012, Institutionalizing Concern Regarding Safety Issues Identified in Selected Past Generic Communications, that was issued on September 28, 2005, for occasional application at fuel cycle facilities during our upcoming inspection cycle that ends on December 31, 2006.1 Our intent is to conduct this TI as part of each fuel facilitys core inspection program, to minimize, to the degree possible, additional burden on fuel cycle licensees. However, if experience proves that the implementation of this TI requires additional effort, beyond the resources committed for the core inspection program, resources that have been set aside for regional initiatives may be used, as well.
You may be aware of an event that occurred at the Davis-Besse Nuclear Power Station in March 2002, where a cavity was discovered to have formed in a pressure vessel head due to boric acid corrosion. Because this event had significant safety implications, the U.S. Nuclear Regulatory Commission (NRC) soon afterward formed a Davis-Besse Lessons Learned Task Force (DBLLTF) to conduct a study of how the NRC could better improve its regulatory oversight in light of this Davis-Besse event. Although the results of this study had the most direct implications for the NRCs reactor oversight program, the Division of Fuel Cycle Safety and Safeguards (FCSS) reviewed the DBLLTF report to determine what lessons and recommendations also may apply to the fuel cycle regulatory oversight program.
One of the lessons learned was that the responses to generic issues sometimes may not endure over a long period of time, so that the same generic issues may re-emerge at the same or at other facilities after an initial period of concerted activity, following which the issue no longer remains in the forefront of NRC and licensee safety consciousness.
To determine if there was potential for the re-emergence of such issues in the fuel cycle arena, the FCSS staff, in coordination with Region II fuel cycle inspection staff, examined NRC generic communications (including Bulletins, Generic Letters, and Information Notices) ranging over the last two decades, addressed wholly, or in part, to fuel cycle licensees or certificate holders.
This examination identified those generic communications that addressed ongoing and currently risk-significant issues that may merit further examination, to determine if there is a risk 1
This TI has been posted on the NRC public web site at the following location:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/temp-instructions/ti2600012.pdf .
R. Freeman of these issues re-emerging as risk-significant conditions or events. TI 2600/012 was developed to support specific inspection activity at the fuel cycle facilities believed to be affected by the identified issues.
The issues to be inspected in TI 2600/012 all fall under existing inspection areas currently addressed in the NRCs core fuel cycle inspection program, but the applicable procedures may not contain sufficiently detailed guidance relative to the issues to be inspected in TI 2600/012.
The results of the inspections conducted under this TI may lead to improvements in current inspection or license review guidance to ensure that the issues will not form the basis for later undesired conditions or events at regulated fuel cycle facilities.
Should you have any questions regarding this temporary instruction, please contact Lance Lessler, of my staff, at (301) 415-8144 or ljl@nrc.gov.
/RA/
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards
R. Freeman of these issues re-emerging as risk-significant conditions or events. TI 2600/012 was developed to support specific inspection activity at the fuel cycle facilities believed to be affected by the identified issues.
The issues to be inspected in TI 2600/012 all fall under existing inspection areas currently addressed in the NRCs core fuel cycle inspection program, but the applicable procedures may not contain sufficiently detailed guidance relative to the issues to be inspected in TI 2600/012.
The results of the inspections conducted under this TI may lead to improvements in current inspection or license review guidance to ensure that the issues will not form the basis for later undesired conditions or events at regulated fuel cycle facilities.
Should you have any questions regarding this temporary instruction, please contact Lance Lessler, of my staff, at (301) 415-8144 or ljl@nrc.gov.
/RA/
Robert C. Pierson, Director Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards DISTRIBUTION:
FCSS r/f BGleaves ML053000611 INDICATE IN BOX: E=COPY W/ATT/ENCL; C=COPY W/O ATT/ENCL; N=NO COPY OFFICE TSG Region II TSG FCSS NAME Llessler:dw DCollins: via email MGalloway RPierson DATE 10/ 27 /05 10/ 27 /05 10/ /05 10/ 28 /05 OFFICIAL RECORD COPY