October 28, 2005 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
REVIEW OF SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 INSERVICE INSPECTION
SUMMARY
REPORT (TAC NO. MC6317)
Dear Mr. Scarola:
By letter dated February 15, 2005, Carolina Power and Light Company (the licensee) submitted its Inservice Inspection (ISI) Summary Report for Refueling Outage No. 12 for Shearon Harris Nuclear Power Plant, Unit 1. The unit is in its second 10-year ISI interval. The licensee submitted the Report in accordance with the reporting requirement specified in American Society of Mechanical Engineers Code, 1989 Edition,Section XI, Article IWA-6220(c).
The Report includes non-destructive examination of Welds Summary, Component Support and Snubber Examination Summary, Steam Generator ISI Summary, System Pressure Tests Summary, Containment Inspections Summary, and Repair and Replacement Summary.
The licensee stated that, in its testing of 27 mechanical snubbers, one was observed to have excessive noise and was replaced. In its containment inspection, a recordable condition of blistering of the coating was observed in the containment valve chambers. The coatings were removed from the affected areas, and visual and ultrasonic examinations were performed.
The results showed no significant thickness reduction. The affected surface areas were re-coated.
In its steam generator inspection, three tubes were found damaged by a loose part which had caused a small primary-to-secondary leakage. The three tubes were subsequently plugged.
Steam generator inspection results and reports are being reviewed under separate action.
This letter completes our review of the subject ISI summary report and no followup action is required.
Sincerely,
/RA/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-400 cc: See next page
ML052970245 NRR-106 OFFICE PM:PDII/S2 LA:PDII/S2 SC:PDII/S2 NAME CPatel BClayton MMarshall DATE 10 / 27 /05 10/ 27 /05 10/ 28 /05
Mr. James Scarola Shearon Harris Nuclear Power Plant Carolina Power & Light Company Unit 1 cc:
David T. Conley Associate General Counsel II -
Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Resident Inspector/ Harris NPS c/o U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Ms. Beverly Hall, Section Chief Division of Radiation Protection N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Chris L. Burton Manager Performance Evaluation and Regulatory Affairs PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Eric McCartney Plant General Manager Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 3 New Hill, North Carolina 27562-0165 Mr. Robert J. Duncan II Director of Site Operations Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. Herb Council, Chair Board of County Commissioners of Wake County P. O. Box 550 Raleigh, North Carolina 27602 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County P. O. Box 87 Pittsboro, North Carolina 27312 Mr. Terry C. Morton, Manager Support Services Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.
Washington, DC 20037-1128