Meeting with Florida Power and Light, Proposed Amendment for Spent Fuel Pool Boraflex Remedy (TAC Mc 8424 and TAC Mc 8425)
ML052930039
Person / Time
Site: Turkey Point  
Issue date: 10/28/2005
From: Moroney B
NRC/NRR/DLPM/LPD2
To:
Florida Power & Light Co
Moroney B, NRR/DLPM, 415-3974
Shared Package
ML052930043 List:
References
TAC MC8424, TAC MC8425
Download: ML052930039 (5)


Text

October 28, 2005 LICENSEE:

Florida Power and Light Company FACILITY:

Turkey Point Plant, Units 3 and 4

SUBJECT:

SUMMARY

OF OCTOBER 19, 2005, PUBLIC MEETING WITH FLORIDA POWER AND LIGHT COMPANY REGARDING PROPOSED AMENDMENT FOR SPENT FUEL POOL BORAFLEX REMEDY (TAC NOS. MC8424 AND MC8425)

On October 19, 2005, the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives of the Florida Power and Light Company (FPL the licensee) at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss a proposed license amendment to use a combination of soluble boron, fuel element location restrictions and Metamic inserts in fuel racks, as a remedy for degradation of boraflex in the Turkey Point spent fuel pools. The licensee was assisted in the presentation by Holtec, the manufacturer of the Metamic inserts. The meeting was open to the public as stated in the meeting notice dated October 5, 2005 (ML052770278). There were no members of the public present. Enclosure 1 is a list of attendees. Enclosure 2 is a copy of the FPL view graphs presented during the meeting. Enclosure 3 is a copy of a draft partial amendment request that FPL prepared to illustrate the proposed scope and format for the submittal.

The licensee reviewed its plans and proposed schedule for submitting and obtaining approval of the amendment. The design and use of the Metamic inserts, the controls to be used for fuel element location, criticality, thermal-hydraulics, structural and seismic effects were discussed.

The NRC staff asked questions to obtain clarification of the design, fabrication and utilization of the Metamic inserts and controls to be used for fuel storage location. The staff also provided feedback on the format and content of the draft submittal. No regulatory decisions were made.

The licensee indicated that the amendment request would be submitted in early 2006 and requested approval within 1 year. The staff indicated that the proposed schedule was reasonable and achievable depending on the technical quality of the submittal.

Please direct any inquiries regarding this meeting to me at (301) 415-3974 or btm3@nrc.org.

/RA/

Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosures:

As stated cc w/encls: See next page ATTENDANCE LIST NUCLEAR REGULATORY COMMISSION STAFF MEETING WITH FLORIDA POWER AND LIGHT COMPANY AT NRC HEADQUARTERS OCTOBER 19, 2005 NRC FPL J. Nakoski C. OFarrill M. Marshall G. Adams B. Moroney P. Czaya A. Hiser Y. Kao L. Lois P. Sharp C. Lauron K. Parczewski B. Grimmel Y. Diaz K. Jabbour Holtec S. Anton

ML052930039 : ML052930317 Package No.: ML052930043 : ML052930384 NRC-001 OFFICE PDII-2\\PM PDII-2\\LA PDII-2\\SC NAME BMoroney BClayton MMarshall DATE 10/26/05 10/26/05 10/28/05

SUBJECT:

SUMMARY

OF OCTOBER 19, 2005, PUBLIC MEETING WITH FLORIDA POWER AND LIGHT COMPANY REGARDING PROPOSED AMENDMENT FOR SPENT FUEL POOL BORAFLEX REMEDY (TAC NOS. MC8424 AND MC8425)

Date: October 28, 2005 Distribution:

PUBLIC PDII-2 R/F RidsNrrPMBMoroney RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDLpm RidsNrrDlpmLpdii RidsNrrDlpmLpdii2 RidsNrrLABClayton (Hard Copy)

RJasinski JNakoski AHiser LLois CLauron KParczewski BGrimmel YDiaz KJabbour BWetzel RidsRgn2MailCenter (JMunday, BDesai)

Florida Power and Light Company TURKEY POINT PLANT cc:

Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW.

Suite 220 Washington, DC 20004 Terry O. Jones Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 Northwest 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344th Street Florida City, Florida 33035 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Michael O. Pearce Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Walter Parker Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mark Warner, Vice President Nuclear Operations Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420