3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each reactor coolant system accumulator shall be OPERABLE with:
- a.
The isolation valve open,
- b.
A contained volume of between 6,223 and 6,500 gallons of borated
- water,
- c.
A boron concentration of between 2,200 and 2,500 ppm, and,
- d.
A nitrogen cover-pressure of between 595.5 and 647.5 psig.
APPLICABILITY: MODES 1, 2 and 3*.
ACTION:
- a.
With one accumulator inoperable, except as a result of a closed isolation valve or boron concentration outside the required limits, restore the inoperable accumulator to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b.
With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in HOT STANDBY within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c.
With the boron concentration of one accumulator outside the required limits, restore the boron concentration to within the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than or equal to 1000 psig within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.1 Each accumulator shall be demonstrated OPERABLE:
- a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
- 1.
Verifying the water level and nitrogen cover-pressure in the tanks, and
- 2.
Verifying that each accumulator isolation valve is open.
- Pressurizer Pressure above 1000 psig.
SALEM - UNIT 1 3/4 5-1 Amendment No. 267
3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each reactor coolant system accumulator shall be OPERABLE with:
- a.
The isolation valve open,
- b.
A contained volume of between 6223 and 6500 gallons of borated water,
- c.
A boron concentration of between 2200 and 2500 ppm, and
- d.
A nitrogen cover-pressure of between 595.5 and 647.5 psig.
APPLICABILITY: MODES 1, 2 and 3*.
ACTION:
- a.
With one accumulator inoperable, except as a result of a closed isolation valve or boron concentration outside the required limits, restore the inoperable accumulator to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b.
With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in HOT STANDBY within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- c.
With the boron concentration of one accumulator outside the required limits, restore the boron concentration to within the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than or equal to 1000 psig within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.1 Each accumulator shall be demonstrated OPERABLE:
- a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:
- 1.
Verifying the water level and nitrogen cover-pressure in the tanks, and
- 2.
Verifying that each accumulator isolation valve is open.
- Pressurizer Pressure above 1000 psig.
SALEM - UNIT 2 3/4 5-1 Amendment No. 249