ML052900084

From kanterella
Jump to navigation Jump to search
Technical Specification Pages Emergency Core Cooling System Accumulators
ML052900084
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/14/2005
From:
NRC/NRR/DLPM/LPD1
To:
References
Download: ML052900084 (2)


Text

3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)

ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each reactor coolant system accumulator shall be OPERABLE with:

a.

The isolation valve open,

b.

A contained volume of between 6,223 and 6,500 gallons of borated

water,
c.

A boron concentration of between 2,200 and 2,500 ppm, and,

d.

A nitrogen cover-pressure of between 595.5 and 647.5 psig.

APPLICABILITY: MODES 1, 2 and 3*.

ACTION:

a.

With one accumulator inoperable, except as a result of a closed isolation valve or boron concentration outside the required limits, restore the inoperable accumulator to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in HOT STANDBY within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.

With the boron concentration of one accumulator outside the required limits, restore the boron concentration to within the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than or equal to 1000 psig within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1 Each accumulator shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1.

Verifying the water level and nitrogen cover-pressure in the tanks, and

2.

Verifying that each accumulator isolation valve is open.

  • Pressurizer Pressure above 1000 psig.

SALEM - UNIT 1 3/4 5-1 Amendment No. 267

3/4.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)

ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each reactor coolant system accumulator shall be OPERABLE with:

a.

The isolation valve open,

b.

A contained volume of between 6223 and 6500 gallons of borated water,

c.

A boron concentration of between 2200 and 2500 ppm, and

d.

A nitrogen cover-pressure of between 595.5 and 647.5 psig.

APPLICABILITY: MODES 1, 2 and 3*.

ACTION:

a.

With one accumulator inoperable, except as a result of a closed isolation valve or boron concentration outside the required limits, restore the inoperable accumulator to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in HOT STANDBY within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

c.

With the boron concentration of one accumulator outside the required limits, restore the boron concentration to within the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than or equal to 1000 psig within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1 Each accumulator shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1.

Verifying the water level and nitrogen cover-pressure in the tanks, and

2.

Verifying that each accumulator isolation valve is open.

  • Pressurizer Pressure above 1000 psig.

SALEM - UNIT 2 3/4 5-1 Amendment No. 249