MONTHYEARML0527801982005-09-30030 September 2005 Response to Request for Additional Information Regarding the 12-month Steam Generator Tube Inservice Inspection Report for the End-of-Cycle 5 Refueling Outage in 2003 Project stage: Response to RAI ML0600302742006-01-13013 January 2006 Summary of the Staff'S Review of the 12-Month Steam Generator Tube Inservice Inspection Report for the End-Of-Cycle 5 Refueling Outage in Fall 2003 Project stage: Approval 2005-09-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 SEP 302005 10 CFR 50.4 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
In the Matter of ) Docket No. 50-390 Tennessee Valley authority )
WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 12-MONTH STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR THE END-OF-CYCLE 5 REFUELING OUTAGE IN 2003 (TAC NO. MC4955)
Reference:
- 1. Watts Bar Nuclear Plant (WBN) Unit 1 - Steam Generator Inservice Inspection - Cycle 5 Twelve Month Report (TAC No. MC1048) dated September 24, 2004.
- 2. Watts Bar Nuclear Plant (WBN) Unit 1 - Request for Additional Information Regarding the 12-Month Steam Generator Tube Inservice Inspection Report for the End-Of-Cycle 5 Refueling Outage in 2003 (TAC No. MC4955) dated August 12, 2005.
The purpose of this letter is to provide TVA's response to NRC's request for additional information concerning TVA's 12-month steam generator inservice inspection report submitted in Reference 1. The enclosure provides TVA's response to the NRC's request in Reference 2.
A 1--7 PMlend recydEd pa
U.S. Nuclear Regulatory Commission Page 2 SEP 3 0 2005 There are no regulatory commitments associated with this submittal. If you have any questions concerning this matter, please call me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. D. V. Pickett, Project Manager U.S. Nuclear Regulatory Commission MS 08G9a One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 REQUEST FOR ADDITIONAL INFORMATION END-OF-CYCLE 5 12-MONTH STEAM GENERATOR INSERVICE INSPECTION REPORT NRC QUESTION 1 For Steam Generator 1 (SGI), eleven tubes were preventively plugged due to possible foreign objects near by and four tubes were plugged due to loose part wear. In addition, seven tubes were plugged due to loose part wear in SG4. Please address the following questions regarding loose parts.
- a. Discuss what inspections, if any, are performed to detect loose parts.
- b. Was the presence of possible foreign objects verified? If so, what type of foreign objects were verified.
- c. Were the foreign objects removed? If possible foreign objects were left in service, were engineering evaluations performed to ensure that tube integrity would be maintained until the next inspection of the associated tubes?
TVA RESPONSE
- a. During the Unit 1 end-of-cycle (EOC)-5 outage, foreign object search and retrieval (FOSAR) was performed on all four steam generators in the annulus, the tubelane, and several columns in-bundle at the top of the tubesheet.
Bobbin coil exams were performed which identified potential loose parts and loose parts wear. Also, Plus Point (+Point) examinations were performed at the top of the tubesheet which would identify loose parts or wear.
- b. Twelve tubes were plugged in SG1 due to two tubes with indications of wall loss which was characterized as loose part wear at the fifth cold leg support (R37C63 and R39C63) and three tubes with potential loose part calls by eddy current (R36C63, R38C63, and R39C64) at the fifth cold support with no associated wear. The additional seven tubes were plugged to bound the potential loose part, because FOSAR in this area is not possible.
Six tubes were plugged in SG4 due to a loose part indication above the third anti-vibration bar in tube R39C90 and a potential loose part identified by eddy current in R40C91 and R41C91 with no associated wear. The other three tubes were plugged to bound the potential for loose parts as these areas can not be inspected with FOSAR.
E-1
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 REQUEST FOR ADDITIONAL INFORMATION END-OF-CYCLE 5 12-MONTH STEAM GENERATOR INSERVICE INSPECTION REPORT
- c. No objects could be visually confirmed and evaluated; therefore, no engineering analysis was performed. All tubes with wear were plugged and the potential parts were bound by plugging adjacent tubes.
NRC QUESTION 2 For all four SGs, please discuss the nature, cause, and severity of all volumetric indications identified this cycle except the volumetric indications in tubes 3-35-58, 3-38-18, and 4-42-55, which were addressed in a previous request for additional information response dated July 19, 2004 (ML042040158).
TVA RESPONSE Volumetric indications and their severity in terms of axial extent, circumferential extent, maximum depth, and maximum voltage are included on the table below. In terms of voltage alone, these indications are very small and do not challenge structural or leakage integrity. The Electrical Power Research Institute (EPRI) In Situ Pressure Test Guidelines states that indications below 0.5 volts are not a challenge to structural or leakage integrity. The cause of the indication is assumed to be loose parts damage because of the location of the indication.
Axial Circumferial Maximum SG Row Column Location Extent Extent Maximum Depth Voltage (inches) (degrees) (percentage) (volts) 3 22 51 HTS+0.58 0.15 25 32 0.17 3 35 56 HTS-0.10 0.12 90 26 0.26 3 36 52 HTS-1.07 0.15 90 33 0.20 4 21 57 HTS+0.23 0.22 42 5% 0.12 4 46 30 HTS-0.36 0.66 80 36 0.30 4 46 31 HTS-0.11 0.50 94 Undetermined 0.31 4 48 29 HTS-0.14 0.49 84 Undetermined 0.57 4 48 34 HTS-0.18 0.48 96 Undetermined 0.21 1 39 63 C05+0.93 0.26 107 49 0.32 4 39 90 AV3+3.52 0.16 28 42 0.27 E-2
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 REQUEST FOR ADDITIONAL INFORMATION END-OF-CYCLE 5 12-MONTH STEAM GENERATOR INSERVICE INSPECTION REPORT NRC QUESTION 3 In Table 1 you indicated that you performed +Point exams in the low row U-Bends and array probe exams in higher row U-Bends.
Please consider which rows are considered low or high. Also discuss the percentage of tubes in each of these categories. If a 100 percent inspection was not performed in these areas, discuss the basis for limiting the scope.
TVA RESPONSE Because the array probes are too large to traverse the bends in Rows 4 and lower, +Point probes were used in these rows and considered "low rows." A 100 percent inspection was performed in Rows 1 through 4 using the +Point probe. A 100 percent inspection was performed in Rows 5 through 10 using the Mitsubishi Intelligent Array (MHI) probe. A 20 percent sample was performed in Rows 17 through 23 using the MHI array probe.
This scope is based upon recommendations from Westinghouse in a report titled "Generic Evaluation of U-Bend PWSCC Susceptibility for Model 51 SGs with Mill Annealed Alloy 600 Tubing," dated September 15, 2003. This report documented a study on the stress strain levels associated with U-Bend tubes in Model 51 SGs and also specifically addressed WBN Model D SGs. Industry data has validated this scope as conservative.
NRC QUESTION 4 Several indications were identified in the sludge pile (i.e., +6" to -3"). Please describe the +Point exam extent at the top of the tubesheet. Does this scope include the entire sludge pile height? If not, discuss the basis for the axial extent of the rotating probe examinations.
TVA RESPONSE Axial outside diameter stress corrosion cracking (ODSCC) identified in the sludge region were all less than 2-inches above the top of the tubesheet. The planned Plus Point exam above the tubesheet was 2-inches. This is typically exceeded by acquisition. The 2-inches was based on the height of the sludge measured during the Unit 1 Cycle 4 inspection. During the Unit 1 Cycle 5 inspection, sludge calls from eddy current were reviewed E-3
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 REQUEST FOR ADDITIONAL INFORMATION END-OF-CYCLE 5 12-MONTH STEAM GENERATOR INSERVICE INSPECTION REPORT every shift and if the sludge pile was discovered higher in a certain area, that area would be reexamined to encompass the sludge pile, if necessary. The final examination included the entire sludge pile height.
NRC QUESTION 5 Freespan outside diameter stress corrosion cracking was identified in tubes 2-13-66 and 3-3-111. Please discuss how these indications were detected (bobbin, rotating coil). If the indications were not found with bobbin coil, discuss the technical basis for the scope of your examinations. Discuss the severity (structural and leakage) of these indications.
TVA RESPONSE One of the freespan ODSCC crack-like indications was identified by bobbin coil between the first and second support plate. The voltage on this indication was 0.19 volts and the axial extent was measured as 0.28 inches, which indicates that the indication is very small and would not challenge structural or leakage integrity. The other freespan indication was identified during
+Point inspections of the U-Bend areas. SG 3 Row 3 Column 11 had an outside diameter crack-like indication in the straight section tubing above the top cold leg support and just before the U-bend starts. This area is not tested with bobbin since it is tested with +Point. Therefore it is not known if the bobbin exam would have identified the indication; however, the indication is only 0.07 volts and the axial extent was measured as 0.12 inches.
Since the bobbin coil identified one of the indications and because of the extensive U-Bend examinations, TVA did not considered it necessary to expand the inspection scope.
NRC QUESTION 6 In general, did you confirm that all tubes inspected had adequate structural and leakage integrity at the time of your last inspection?
TVA RESPONSE TVA did confirm that all tubes inspected had adequate structural and leakage integrity at the time of the last inspection.
Condition monitoring was performed considering each indication E-4
ENCLOSURE WATTS BAR NUCLEAR PLANT (WBN) UNIT 1 REQUEST FOR ADDITIONAL INFORMATION END-OF-CYCLE 5 12-MONTH STEAM GENERATOR INSERVICE INSPECTION REPORT identified during the inspection. All tubes met structural and leakage integrity from the past cycle and for the full planned Cycle 6.
E-5