ML052770354

From kanterella
Jump to navigation Jump to search
NRC Regulatory Issue Summary (RIS) 2005-19, Preparation and Scheduling of Operating Licensing Examinations
ML052770354
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/26/2005
From: Shortell T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
99434, RIS-05-019
Download: ML052770354 (3)


Text

Nuclear Learning Center 450 Lake Road Oswego, New York 13126

.. Constellation Energy-Nine Mile Point Nudear Station September 26, 2005 99434 U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555-0001

Subject:

Nine Mile Point Units I and 2 Docket Nos. 50-220 and 50-410 Facility Operating License Nos. DPR-63 and NPF-69 NRC Regulatory Issue Summary (RIS) 2005-19, Preparation and Scheduling of Operating Licensing Examinations Gentlemen:

Nine Mile Pont Nuclear Station, LLC, has gathered the information requested by RIS 2005-19 and has documented the information on the attached NRC Forms 536. Ifyou have any questions, please contact Mr.

Robert I. Browvn at (315)3494531.

Sincerely,

.A Thomas J. Shortell Manager Training TJS/RAH/bab Attachments Cc: Mr. S.J. Collins, NRC Regional Administrator, Region I Mr. G.K. Hunges, NRC Senior Resident Inspector HoAD 0 3

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0813112008 05)Estimated burden per response to comply with this voluntary Information collection request I hour. This information collecion is used to plan budgets and resources for operator examinations. Send comments rerding burden OPERATOR LICENSING estimate to the Records and FOlAiPrivacy Services Branch (-r- tFy3. U.S.

Nula ReuaoyCommission, Washington. DC 20555-0001 orby intemet EXAM INATION DATA e-mail toinlectslnrcgov, and l the Desk Officer, Office of Informabon A ATB-10202 (31500131). Office of Management and Washington. DC 20503. if a means used to impose an iformation nt dspay curetlyvaid MBcontrol number, the NRC may colectondoe not Conduct or sponsor, an~dra personis not required to respond to, the kifonnation collection FACIUTY NRC REGICN Nine Mile Point Unit I Region 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2006 CY2007 CY2008 CY2009 ESTIMATED NUMBER OF 0 LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2006 C02007 C02008 C2009 NUMBER OF REACTOR 5 0 4 0 OPERATORS NUMBER OF SENIOR REACTOR 6 0 4 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/111/2006 09/2912008 ALTERNATE DATE 1012712008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2007 PROPOSED _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEDI NUMBER OF 8 -

8 CANDIDATES NRC FORM 536 (84M PRINTED ON RECYCLED PAPER

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08&312008 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This intormation collecion Is used to plan budgets and resources for operator examinations. Send comments re din burden OPERD OPERATO L.__., A rnullestimate A TOR ICENSING to the Records and FOIA/Prvacy Services Branch T-5 Fg3 ), U.S.

Nuclear Regulatory Commission. Washington, DC 20555-0001, or b internet EXAMINATION DATA e-mail to infoc olects@nrcgov. and to the Desk Officer, Office o Intormafon and Regulatory Affairs NEOB-10202. (3150-0131). Office of Management and Budget, Washington. DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct Or sponsor, and a person is not required to respond to, the information collection.

FACILrrY NRC REGION Nine Mile Point Unit 2 Region 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2006 CY2007 CY2008 CY2009 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2006 Ct2007 CY2008 C'r2009 NUMBER OF REACTOR 0 6 0 6 OPERATORS NUMBER OF SENIOR REACTOR 4 0 4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 OPERATORS - UPGRADE _

NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/24/2007 09/28/2009 ALTERNATE DATE 10/22/2007 10/26/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER ESTIMATED NUMBER OF 10 10 CANDIDATES _ . I NRC FORM 53 (hI) PRINTED ON RECYCLED PAPER