Letter Sequence Approval |
---|
|
|
MONTHYEARML0428002122004-10-0808 October 2004 RAI, Proposed Changes to Control Rod Requirements Project stage: RAI ML0527200132005-09-27027 September 2005 Issuance of Amendment Changes to Control Rod Requirements - Technical Specification Pages, Reactivity Control Systems 3/4.4.3 Control Rods Control Rod Operability Project stage: Approval ML0526400732005-09-27027 September 2005 Partial Withdrawal of an Amendment Request Project stage: Withdrawal ML0526304512005-09-27027 September 2005 License Amendment, Changes to Control Rod Requirements Project stage: Other 2004-10-08
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23089A1242023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component ML22272A0372023-01-0303 January 2023 Issuance of Amendment Nos. 258 and 220 Regarding Technical Specifications 3/4.8.1, AC Sources-Operating and 3/4.5.1, ECCS-Operating ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21181A0442021-09-28028 September 2021 Issuance of Amendment Nos. 253 and 215 Technical Specification Changes Related to Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21032A2702021-02-22022 February 2021 Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20239A7252020-11-30030 November 2020 Issuance of Amendment Nos. 249 and 211 Adopt TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML20178A5142020-06-26026 June 2020 TS Change and Relief Requests Related to Safety Relief Valve Testing - Response to Request for Additional Information ML20034F6372020-02-28028 February 2020 Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML19207A0062019-10-0303 October 2019 Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML19029B2492019-02-12012 February 2019 Correction to Amendment No. 195 Revising Technical Specifications to Lower the Minimum Standby Liquid Control System Pump Flowrate ML19030A1472019-01-30030 January 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action to Adopt Risk-Informed Completion Times in Accordance with TSTF-505, Revision 2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18017A2012018-02-27027 February 2018 Issuance of Amendment Nos. 227 and 190 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9967 and MF9968; EPID L-2017-LLA-0260) ML17200D0962017-07-19019 July 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Rev. 2. ML17103A0812017-05-16016 May 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML16335A0382016-12-29029 December 2016 Issuance of Amendments to Revise Technical Specification Snubber Requirements ML16041A0212016-03-15015 March 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15356A1402016-01-28028 January 2016 Issuance of Amendments Secondary Containment Access Openings ML15218A5012015-09-15015 September 2015 Issuance of Amendment Nos. 219 and 181 Proposed Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15083A4032015-05-11011 May 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML14344A6812015-01-0707 January 2015 Issuance of Amendments - Main Steam Line Flow-High Isolation Response Time ML14324A8082014-12-29029 December 2014 Issuance of Amendments - Leak Detection System Setpoint and Allowable Value Changes ML14308A1442014-11-0303 November 2014 License Amendment Request Proposed Change to Add New Limiting Conditions for Operations 3.0.5 and 3.0.6 ML0527800342014-10-20020 October 2014 Current Facility Operating License NPF-39, Technical Specifications, Revised 08/15/2018 ML14191B1802014-07-10010 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML13214A0922014-03-26026 March 2014 Issuance of Amendments Elimination of Certain Technical Specifications Reporting Requirements ML13100A0202013-04-0909 April 2013 License Amendment Request to Eliminate Certain Technical Specifications Reporting Requirements ML1131802382011-11-10010 November 2011 Response to Request for Additional Information Concerning the License, Amendment Request Associated with the Reactivity Anomalies Surveillance ML1128700802011-10-12012 October 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1117100072011-06-14014 June 2011 License Amendment Request to Include an Alternate Method of Verifying Drywell Unidentified Leakage ML1115401202011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML1109700662011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1035001802010-12-15015 December 2010 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1030603792010-10-29029 October 2010 Response to Request for Additional Information, License Amendment Request, Proposed Technical Specification Allowed Outage Time Extensions to Support Residual Heat Removal Service Water Maintenance ML1024304662010-08-31031 August 2010 License Amendment Request, Proposed Administrative Changes to Technical Specifications ML1018104342010-06-30030 June 2010 License Amendment Request - Table 3.3.2-2, Item 4e, HPCI Equipment Room Delta Temperature High Isolation Trip Setpoint and Allowable Value Changes ML1008503952010-03-25025 March 2010 Markup of Proposed Operating License, Technical Specifications & Updated Final Safety Analysis Report Pages ML0912800592009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0821207302008-08-27027 August 2008 Tech Spec Pages for Amendment 154 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume ML0817802542008-08-0505 August 2008 Technical Specifications, Limerick Unit 1, Amendment 192, License NPF-39 ML0817802872008-08-0505 August 2008 Technical Specifications, Limerick Unit 2, Amendment 153, License NPF-85 ML0816305582008-06-11011 June 2008 Supplement to License Amendment Request Related to Proposed Changes to Emergency Diesel Generator Fuel Oil Requirements 2023-05-17
[Table view] |
Text
REACTIVITY CONTROL SYSTEMS 3/4.1.3 CONTROL RODS CONTROL ROD OPERABILITY LIMITING CONDITION FOR OPERATION 3.1.3.1 All control rods and scram discharge volume vent and drain valves shall be OPERABLE.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3***
ACTION:
- a. With one withdrawn control rod inoperable due to being immovable, as a result of excessive friction or mechanical interference, or known to be untrippable:
- 1. Within 1 hour:
a) Verify that the inoperable withdrawn control rod is separated from all other inoperable withdrawn control rods by at least two control cells in all directions.
b) Disarm the associated directional control valves** either:
- 1) Electrically, or
- 2) Hydraulically by closing the drive water and exhaust water isolation valves.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- 2. Restore the inoperable withdrawn control rod to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With one or more control rods trippable but inoperable for causes other than addressed in ACTION a, above:
- 1. If the inoperable control rod(s) is withdrawn, within 1 hour:
a) Verify that the inoperable withdrawn control rod(s) is separated from all other inoperable withdrawn control rods by at least two control cells in all directions, and b) Demonstrate the insertion capability of the inoperable with-drawn control rod(s) by inserting the control rod(s) at least one notch by drive water pressure within the normal operating range*.
- May be rearmed intermittently, under administrative control, to permit testing associated with restoring the control rod to OPERABLE status.
LIMERICK - UNIT I 3/4 1-3 Amendment No. 1-6B, 178
REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.1.3.1.2 When above the preset power level of the RWM, all withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:
- a. At least once per 7 days, and
- b. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery that a control rod is immovable as a result of excessive friction or mechanical interference.
4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4.1.3.2, 4.1.3.4, 4.1.3.5, 4.1.3.6, and 4.1.3.7.
4.1.3.1.4 The scram-discharge volume shall be determined OPERABLE by demonstrating:
- a. The scram discharge volume drain and vent valves OPERABLE at least once per 24 months, by verifying that the drain and vent valves;
- 1. Close within 30 seconds after receipt of a signal for control rods to scram, and
- 2. Open when the scram signal is reset.
- b. Proper level sensor response by performance of a CHANNEL FUNCTIONAL TEST of the scram discharge volume scram and control rod block level instrumentation at least once per 92 days.
LIMERICK - UNIT 1 3/4 1-5 Amendment No. 74, 4, Ags Igl178
REACTIVITY CONTROL SYSTEMS 3/4.1.3 CONTROL RODS CONTROL ROD OPERABILITY LIMITING CONDITION FOR OPERATION 3.1.3.1 All control rods and scram discharge volume vent and drain valves shall be OPERABLE.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3***
ACTION:
- a. With one withdrawn control rod inoperable due to being immovable, as a result of excessive friction or mechanical interference, or known to be untrippable:
- 1. Within 1 hour:
a) Verify that the inoperable withdrawn control rod is separated from all other inoperable withdrawn control rods by at least two control cells in all directions.
b) Disarm the associated directional control valves** either:
- 1) Electrically, or
- 2) Hydraulically by closing the drive water and exhaust water isolation valves.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- 2. Restore the inoperable withdrawn control rod to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With one or more control rods trippable but inoperable for causes other than addressed in ACTION a, above:
- 1. If the inoperable control rod(s) is withdrawn, within 1 hour:
a) Verify that the inoperable withdrawn control rod(s) is separated from all other inoperable withdrawn control rods by at least two control cells in all directions, and b) Demonstrate the insertion capability of the inoperable with-drawn control rod(s) by inserting the control rod(s) at least one notch by drive water pressure within the normal operating range*.
- May be rearmed intermittently, under administrative control, to permit testing associated with restoring the control rod to OPERABLE status.
LIMERICK - UNIT 2 3/4 1-3 Amendment No. 4-31,140
REACTIVITY CONTROL SYSTEMS 5URVEILLACLELREQUIREMENTS (Continued) 4.1.3.1.2 When above the preset power level of the RWM, all withdrawn control rods not required to have their directional control valves disarmed electrically or hydraulically shall be demonstrated OPERABLE by moving each control rod at least one notch:
- a. At least once per 7 days, and
- b. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery that a control rod is immovable as a I result of excessive friction or mechanical interference.
4.1.3.1.3 All control rods shall be demonstrated OPERABLE by performance of Surveillance Requirements 4.1.3.2, 4.1.3.4, 4.1.3.5, 4.1.3.6, and 4.1.3.7.
4.1.3.1.4 The scram discharge volume shall be determined OPERABLE by demonstrating:
- a. The scram discharge volume drain and vent valves OPERABLE at least once per 24 months, by verifying that the drain and vent valves:
- 1. Close within 30 seconds after receipt of .a signal for control rods to scram, and
- 2. Open when the scram signal is reset.
- b. Proper level sensor response by performance of a CHANNEL FUNCTIONAL TEST of the scram discharge volume scram and control rod block level instrumentation at least once per 92 days.
LIMERICK - UNIT 2 3/4 1-5 Amendment No. 33, 34, £g, 4-4, 140