Category:Letter
MONTHYEARIR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 05000414/LER-2022-003, Manual Reactor Trip and Auxiliary Feedwater System Actuation2022-12-23023 December 2022 Manual Reactor Trip and Auxiliary Feedwater System Actuation IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl 05000414/LER-2022-002, Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination2022-12-0606 December 2022 Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-09-05
[Table view] Category:Technical Specification
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change2023-04-24024 April 2023 Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies ML22186A0082022-06-21021 June 2022 SLC Revision to 16.9-22, TS Bases 3.7.7 RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0219, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-12-0404 December 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes RA-18-0226, Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System.2018-11-15015 November 2018 Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System. CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications CNS-18-005, Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes2018-02-0808 February 2018 Technical Specification Bases Changes and Ufsar/Selected Licensee Commitment Changes RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. CNS-17-033, Technical Specification Bases Changes2017-06-27027 June 2017 Technical Specification Bases Changes RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process CNS-16-046, Technical Specification Bases Changes, B 3.7 Plant Systems2016-06-14014 June 2016 Technical Specification Bases Changes, B 3.7 Plant Systems CNS-16-031, Technical Specification Bases Changes2016-04-26026 April 2016 Technical Specification Bases Changes CNS-16-015, Technical Specification Bases Changes2016-02-18018 February 2016 Technical Specification Bases Changes CNS-15-098, Technical Specification Bases Changes2015-12-14014 December 2015 Technical Specification Bases Changes RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 MNS-15-022, Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements2015-06-23023 June 2015 Renewed Facility Operating License Nos. NPF-35 and NPF-52 Removal of Superseded Technical Specification (TS) Requirements CNS-15-054, Submittal of Technical Specification Bases Changes 5.5.142015-06-0202 June 2015 Submittal of Technical Specification Bases Changes 5.5.14 CNS-15-021, Technical Specification Bases Changes Made According to the Provisions of Technical Specification 5.5.14, Technical Specifications (TS) Bases Control Program.2015-03-0909 March 2015 Technical Specification Bases Changes Made According to the Provisions of Technical Specification 5.5.14, Technical Specifications (TS) Bases Control Program. RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area CNS-14-079, Technical Specification Bases Changes2014-06-18018 June 2014 Technical Specification Bases Changes CNS-14-055, Technical Specification Bases Changes2014-05-0505 May 2014 Technical Specification Bases Changes CNS-14-032, Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications2014-03-10010 March 2014 Request for Notice of Enforcement Discretion (NOED) Regarding Technical Specifications CNS-14-026, Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System.2014-02-17017 February 2014 Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System. ML13269A0772013-09-23023 September 2013 Submittal of Technical Specification Bases Changes ML13263A3732013-09-18018 September 2013 Technical Specification Bases Changes ML13109A0802013-04-17017 April 2013 Technical Specification Bases Changes ML12314A0152012-11-0606 November 2012 Technical Specification Bases Changes ML12153A3282012-05-31031 May 2012 Proposed Technical Specifications Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (COLR) License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measurement Method ML11335A1482011-11-29029 November 2011 Technical Specification Bases Changes ML11327A1492011-11-22022 November 2011 Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML11171A0422011-06-15015 June 2011 Changes to Technical Specification Bases Pursuant to 10CFR 50.4 ML11138A3042011-05-10010 May 2011 Technical Specification Bases Changes, Pursuant to 1OCFR 50.4 ML1108907012011-03-24024 March 2011 Duke Energy Carolinas - Technical Specification Bases Changes 2024-05-23
[Table view] Category:Amendment
MONTHYEARRA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-21-0027, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-16016 September 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-20-0207, Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation2020-12-0303 December 2020 Duke Energy - Application to Revise the Technical Specification for Engineered Safety Feature Actuation System (ESFAS) Instrumentation RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML12153A3282012-05-31031 May 2012 Proposed Technical Specifications Amendment TS 3.1.3, Moderator Temperature Coefficient (Mtc) TS 5.6.5, Core Operating Limits Report (COLR) License Amendment Request for Conditional Exemption of the End of Cycle (EOC) Mtc Measurement Method ML11327A1492011-11-22022 November 2011 Proposed Technical Specifications (TS) and Bases Amendment TS and Bases 3.7.8, Nuclear Service Water System (Nsws) ML1026500392010-09-16016 September 2010 License Amendment Request to Revise Technical Specification 5.3, Unit Staff Qualifications ML1019002672010-06-29029 June 2010 License Amendment Request to Revise Reactor Trip System and Engineered Safety Feature Actuation System Technical Specifications ML0928600672009-09-30030 September 2009 Units 1 & 2 and Oconee, Units 1, 2, & 3 - License Amendment Request (LAR) Catawba and McGuire Containment Spray Nozzle and Oconee Reactor Building Spray and Cooling Systems Technical Specification Surveillance Requirement ML0925302402009-09-0303 September 2009 Request to Amend Technical Specification (TS) 3.7.10: Control Room Area Ventilation System ML0911202002009-02-27027 February 2009 Duke Energy Carolinas, LLC - License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0829005322008-10-0202 October 2008 Units 1 and 2 - Amendment to Technical Specification 3.6.13, Ice Condenser Doors, Revised Surveillance Requirements ML0823106722008-09-0808 September 2008 Issuance of Amendments Regarding (TAC MD6961 and MD6962) ML0824900942008-09-0202 September 2008 Technical Specifications (TS) And/Or Bases Sections: 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation 3.3.3, Post Accident Monitoring (PAM) Instrumentation 3.5.4, Refueling Water Storage. ML0819807732008-07-30030 July 2008 Tech Spec Pages for Amendments 243 and 237 Regarding Single Supply Header Operation of the Buried Nuclear Service Water System ML0819801982008-07-14014 July 2008 Proposed Technical Specification Amendment, Technical Specification 3.6.6, Containment Spray System; 3.7.5, Auxiliary Feedwater System ML0813000352008-05-28028 May 2008 Tech Spec Pages for Amendments 241 and 236 Regarding Changes to the Update Final Safety Analysis Report ML0800100042008-01-0202 January 2008 Technical Specifications Related to Amendment No. 239 One-Time Extension of the 1B Emergency Core Cooling System & the Auxiliary Building Filtered Ventilation Exhaust System Allowed Outage Time ML0734804452007-12-11011 December 2007 Units 1 & 2 - Proposed Technical Specification (TS) Amendment to Relax Completion Times and Surveillance Intervals for the Reactor Trip System (RTS) Instrumentation TS 3.3.1, Engineered Safety Feature ML0727601252007-09-27027 September 2007 Application for Technical Specification Change TSTF-491, Removal of the Main Steam (TS 3.7.2) and Main Feedwater (TS 3.7.3) Valve Isolation Times from Technical Specifications, Using the Consolidated Line Item Improvement Process ML0527002472005-09-19019 September 2005 Proposed Technical Specifications and Bases Amendment ML0525902472005-09-13013 September 2005 Proposed Technical Specifications 3.7.16, Spent Fuel Assembly Storage, and 4.3, Fuel Storage ML0525902452005-09-13013 September 2005 Proposed Technical Specifications 3.5.2, Emergency Core Cooling System; 3.6.6, Containment Spray System; 3.6.17, Containment Valve Injection Water System; 3.7.5, Auxiliary Feedwater System & 3.7.7, Component Cooling Water System ML0520202062005-07-0707 July 2005 Units 1 & 2 - License Amendment Request Applicable to Technical Specification 3.9.1, Boron Concentration. ML0516705512005-06-10010 June 2005 Tech Spec Pages for Amendments 225 and 220 Regarding Extending the Interval Between Local Leakage Rate Tests of the Containment Purge and Vent Valves with Resilient Seals ML0501901302005-01-13013 January 2005 Enclosure, Amendment, TS for SG Tube Integrity (Tac No. MB7842, MB7843) ML0426602802004-09-13013 September 2004 Proposed Technical Specifications (TS) Amendments Revision to Steam Generator TS ML0412502172004-04-29029 April 2004 Amendment Nos. 213 and 207, Increasing Flexibility in Mode Restraints ML0409101232004-03-23023 March 2004 Duke Energy Corp License Amendment Request Applicable to Technical Specifications 5.5.7, Reactor Coolant Pump Flywheel Inspection Program, Using the Consolidated Line Item Improvement Process (CLIIP) ML0406500112004-03-0404 March 2004 Amd Nos. 212/206, Re. Heatup, Cooldown, Criticality, and Inservice Test Pressure and Temperature Limits, and LTOP System Pressure-Temperature Limits ML0403002752004-01-15015 January 2004 Duke Energy Corporation Catawba Nuclear Station, Units 1 and 2 Proposed Technical Specification Amendment TS 3.4.3 - Reactor Coolant System (RCS) Pressure and Temperature (P/T) Limits, TS 3.4.6, RCS Loops - Mode 4, TS 3.4.7, RCS Loops - Mod ML0335803932003-12-19019 December 2003 Technical Specification Pages for Amendments 210 and 204 ML0321304972003-06-25025 June 2003 Proposed Technical Specifications and Bases Amendment 2.0, Safety Limits; 3.3, Instrumentation; 3.4, Reactor Coolant System; 5.6, Reporting Requirements ML0316904972003-06-12012 June 2003 Amendment to Technical Specification 3.6.12 - Ice Bed Revise Ice Mass Surveillance Requirements Supplement and Response to Request for Additional Information ML0309000372003-03-20020 March 2003 Proposed TS Amendment TS 3.4.3 - Reactor Coolant System Pressure & Temperature Limits ML0306900292003-02-25025 February 2003 Application for Amendment to Licenses NPF-35 & NPF-52, to Change & Add Technical Specifications ML0302104322003-01-0808 January 2003 Proposed Technical Specifications (TS) Amendments, Technical Specification 5.5.2 One-Time Extension of ILRT Interval ML0211401132002-04-22022 April 2002 Technical Specifications for Amendments 197 and 190 Eliminating Response Time Testing Requirements for Selected Sensors and Specified Instrumentation to Loops for the Engineered Safety Features and the Reactor Trip System ML0208104712002-03-20020 March 2002 Technical Specifications for Amendments 196 & 189, Revising TS 3.3.2 & TS 3.3.6 ML0206402842002-02-26026 February 2002 Technical Specifications Pages for Amendments 195 & 188 2024-05-23
[Table view] |