DSER Section Table of Contents Page, Section, and Paragraph DSER Text Suggested Revision Justification Category Page 6-v Add the following text 2.1.4 Conclusion page2-25 3
Page 6-v 2.3.1.1 Class 1 Piping/components System 2.3.1.1 Class 1 Piping/Components System 3
Page 6-vii 2.5.1.6 High-voltage Insulators 2.5.1.6 High-Voltage Insulators 3
Page 6-viii 3.0.3.3 AMPs That Are Not Consistent with or Not Addressed in the GALL Report....
3.0.3.3 AMPs That Are Not Consistent With or Not Addressed in the GALL Report....
3 Page 6-viii 3.1.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Not Recommended..
3.1.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Not Recommended..
3 Page 6-viii Add the following text 3.1.2.2 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Recommended.3-139 3
Page 6-viii Add the following text 3.1.3 Conclusion3-166 3
Page, Section, and Paragraph DSER Text Suggested Revision Justification Category Page 6-viii Add the following text 3.2.2.2 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Recommended.3-171 3
Page 6-viii 3.3.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Not Recommended..
3.3.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Not Recommended..
3 Page 6-viii 3.3.2.2 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Recommended.
3.3.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Not Recommended..
3 Page 6-ix 3.5.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Not Recommended...
3.5.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Not Recommended...
3 Page 6-ix 3.5.2.3 AMR Results That Are Not Consistent with or Not Addressed in the GALL Report....
3.5.2.3 AMR Results That Are Not Consistent With or Not Addressed in the GALL Report....
3
Page, Section, and Paragraph DSER Text Suggested Revision Justification Category Page 6-ix 3.6.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Not Recommended...
3.6.2.1 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Not Recommended...
3 Page 6-ix 3.6.2.2 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation Is Recommended.
3.6.2.2 AMR Results That Are Consistent with the GALL Report, for Which Further Evaluation is Recommended.
3 Page 6-ix Add the following text 3.7 Conclusion for Aging Management...3-303 3
Page 6-xii Add the following text 4.5 Loss of Preload4-60 4.5.1 Containment Tendon Loss of Preload4-60 4.5.1.1 Summary of Technical Information in the Application4-60 4.5.1.2 Staff Evaluation 4-60 4.5.1.3 FSAR Supplement4-63 3
Page, Section, and Paragraph DSER Text Suggested Revision Justification Category Page 6-xii 4.8.1.4 Conclusion.........
4-70 4.8.1.4 Conclusion.........
4-71 3
Page 6-xii Add the following text 4.9 Conclusion for Time-Limited Aging Analyses4-71 3
Page 6-xx STP Steam Trap STP-Sewage Treatment Plant Clarification 2
3