MONTHYEARML0522300992005-08-16016 August 2005 Westinghouse, Request for Withholding Information from Public Disclosure for Byron, Unit 2 and Braidwood, Unit 2 Project stage: Withholding Request Acceptance ML0525904022005-09-19019 September 2005 Technical Specifications, Modifies the Inspection Requirements for Portions of the Steam Generator (SG) Tubes within the Hot Leg Tubesheet Region of the SGs Project stage: Other 2005-08-16
[Table View] |
Similar Documents at Byron |
---|
Category:Technical Specifications
MONTHYEARML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML21008A4052020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML20246G8652020-09-21021 September 2020 Issuance of Amendment Nos. 222 and 222 One-Time Extension of Unit No. 2 Steam Generator Inspections (COVID-19) ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20086M2882020-04-0202 April 2020 Correction of Amendments Nos. for Amendments Revising Instrument Testing and Calibration Definitions RS-19-115, Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-20020 December 2019 Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers RS-19-018, Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times2019-02-14014 February 2019 Supplement to Application to Revise Technical Specifications to Adopt Risk Informed Completion Times RS-18-102, License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.22018-08-10010 August 2018 License Amendment Request for a One-Time Extension to Technical Specification 3.8.1, AC Sources-Operating, Required Action A.2 ML18067A1812018-06-0404 June 2018 Correction to Technical Specification Amendment Identification Format ML16180A2512016-08-0101 August 2016 Issuance of Amendments Regarding Use of Optimized Zirlo as Fuel Cladding Material RS-16-034, License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding2016-02-23023 February 2016 License Amendment Request and 10 CFR 50.12 Exemption Request for the Use of Optimized Zirlo Fuel Rod Cladding ML15307A7762015-12-21021 December 2015 Braidwood - Issuance of Amendments Regarding Installation of New Low Degraded Voltage Relays and Timers on the 4.16 Kv Engineered Safety Features (ESF) Buses (CAC Nos. MF4051 - MF4054) ML15286A2762015-11-19019 November 2015 Technical Specifications ML15232A4412015-10-28028 October 2015 Issuance of Amendments to Utilize WCAP-16143-P, Revision 1 Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Byron/Braidwood Units 1 and 2, Dated October 2014 ML15268A4862015-10-0606 October 2015 Correction of Amendments Adopting Technical Specification Task Force Traveler TSTF-523 (TAC Nos. MF4436-MF4446) ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML14323A5222015-04-0808 April 2015 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training RS-14-337, Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement2014-12-18018 December 2014 Units 1 & 2 - License Amendment Request for Diesel Generator Load Rejection Surveillance Requirement ML14239A4272014-12-0707 December 2014 Issuance of Amendments to Clarify Technical Specification 3.3.1, Reactor Trip System Instrumentation, and TS 3.3.2, Engineered Safety Feature Actuation System Instrumentation RS-14-285, License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink(Uhs)2014-11-24024 November 2014 License Amendment Request to Revise Technical Specifications 3.7.9, Ultimate Heat Sink(Uhs) ML13311B4812014-07-21021 July 2014 Issuance of Amendments to Revise Technical Specifications Section 3.5.3 ML14085A5322014-07-21021 July 2014 Issuance of Amendments Adoption of TSTF-522 Ventilation System Surveillance Requirements ML13281A0002014-02-0707 February 2014 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate RS-13-137, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process2013-09-0303 September 2013 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Process RS-13-175, Bryon, Units 1 and 2, License Amendment Request to Revise Technical Specifications Section 3.7.2, Main Steam Isolation Valves (Msivs).2013-08-21021 August 2013 Bryon, Units 1 and 2, License Amendment Request to Revise Technical Specifications Section 3.7.2, Main Steam Isolation Valves (Msivs). RS-12-009, License Amendment Request - Diesel Generator Steady State Maximum Frequency and Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel2012-05-0101 May 2012 License Amendment Request - Diesel Generator Steady State Maximum Frequency and Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel RS-12-028, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.2012-03-22022 March 2012 Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. RS-12-023, License Amendment Request to Revise Tech Specs Sections 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator (SG) Tube Inspection Report, for Permanent Alternate Repair Criteria2012-03-20020 March 2012 License Amendment Request to Revise Tech Specs Sections 5.5.9, Steam Generator (SG) Program, and TS 5.6.9, Steam Generator (SG) Tube Inspection Report, for Permanent Alternate Repair Criteria RS-11-136, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications (TS) 3.3.12011-09-0202 September 2011 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications (TS) 3.3.1 ML1117900322011-06-23023 June 2011 Request for License Amendment Regarding Measurement Uncertainty Recapture (Mur) Power Uprate, Attachment 2B, Markup of Proposed Operating License and Technical Specifications Pages RS-11-070, Supplement to Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2011-05-0404 May 2011 Supplement to Information Supporting Request for License Amendment Regarding Ultimate Heat Sink RS-11-035, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2011-03-16016 March 2011 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink ML1106201482011-03-10010 March 2011 Summary of Meeting with Exelon Generation Company, LLC to Discuss the Request for Additional Information Related to License Amendment Regarding the Ultimate Heat Sink ML1032704352010-12-21021 December 2010 Tech Spec Pages for Braidwood and Byron Amendment Large Break Loss-of-Coolant Accident Analysis Using Astrum ML1032704452010-12-21021 December 2010 Tech Spec Pages for Braidwood and Byron Amendment Large Break Loss-of-Coolant Accident Analysis Using Astrum RS-10-197, License Amendment Request to Revise Technical Specifications (TS) Sections 5.5.9, Steam Generator Program, and TS 5.6.9, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criteria2010-12-14014 December 2010 License Amendment Request to Revise Technical Specifications (TS) Sections 5.5.9, Steam Generator Program, and TS 5.6.9, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criteria RS-10-184, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2010-11-0808 November 2010 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink RS-10-114, License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal2010-06-29029 June 2010 License Amendment Request Regarding Low Temperature Overpressure Protection and Loss of Decay Heat Removal RS-10-052, License Amendment Request for an Extension of the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process2010-03-29029 March 2010 License Amendment Request for an Extension of the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process RS-10-020, Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink2010-01-25025 January 2010 Additional Information Supporting Request for License Amendment Regarding Ultimate Heat Sink RS-09-164, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-4902009-12-0404 December 2009 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-490 2023-07-20
[Table view] |
Text
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Procram (continued)
- 4. A random sample of Ž 20% of the total number of laser welded sleeves and Ž 20% of the total number of Tungsten Inert Gas (TIG) welded sleeves installed shall be inspected for axial and circumferential indications at the end of each cycle. In the event that an imperfection exceeding the repair limit is detected, an additional 20% of the unsampled sleeves shall be inspected and if an imperfection exceeding the repair limit isdetected inthe second sample, all remaining sleeves shall be inspected. These inservice inspections will include the entire sleeve, the tube at the heat treated area, and the tube-to-sleeve joints. The inservice inspection for the sleeves is required on all types of sleeves installed in the SGs to demonstrate acceptable structural integrity;
- 5. For Unit 2 during Refueling Outage 12, a 20% minimum sample of all inservice tubes from the top of the hot leg tubesheet tq 37 inches below the top of the tubesheet shall be inspected by rotating probe. This sample shall include a 20% minimum sample of-the total population of bulges and overexpansions within the SG from the top of the hot leg tubesheet to 17 inches below the top of the tubesheet.
- c. Inspection Results Classification The results of each sample inspection shall be classified into one of the following three categories:
NOTE---------------------------
Previously degraded tubes or sleeves must exhibit significant (> 10% of wall thickness) further wall penetrations to be included in the percentage calculations.
Cateoorv Inspection Results C-1 < 5%of the total tubes inspected are degraded tubes and none of the inspected tubes are defective.
C-2 One or more tubes, but c 1% of the total tubes inspected are defective, or > 5% and c 10% of the total tubes inspected are degraded tubes.
C-3 > 10% of the total tubes inspected are degraded tubes or > 1% of the inspected tubes are defective.
BYRON - UNITS 1 & 2 5.5 - 9 Amendment 144
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Procram (continued)
- e. Acceptance Criteria
- 1. 'Imperfection means an exception to the dimensions, finish or contour of a tube or sleeve from that required by fabrication drawings or specifications'.
Eddy current testing indications < 20% of the nominal tube or sleeve wall thickness, if detectable, may be considered as imperfections;
- 2. Degradation means a service induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube or sleeve;
- 3. Degraded Tube means a tube or sleeve containing unrepaired imperfections Ž 20% of the nominal tube or sleeve wall thickness caused by degradation;
- 4. % Degradation means the percentage of the tube or sleeve wall thickness affected or removed by degradation;
- 5. Defect means an imperfection of such severity that it exceeds the plugging or repair limit. A tube or sleeve containing an unrepaired defect is defective;
- 6. Plugging or Repair Limit means the imperfection depth at or beyond which the tube shall be removed from service by plugging or repaired by sleeving in the affected area. The plugging or repair limit imperfection depth for the tubing is equal to 40% of the nominal wall thickness. The plugging limit imperfection depth for laser welded sleeves is equal to 38.7% of the nominal wall thickness. The plugging limit imperfection depth for TIG welded sleeves is equal to 32% of the nominal wall thickness.
For Unit 2 during Refueling Outage 12 and the subsequent operating cycle, this definition does not apply to degradation identified in the portion of the tube below 17 inches from the top of the hot leg tubesheet. Degradation found in the portion of the tube below 17 inches from the top of the hot leg tubesheet does not require plugging or repair.
For Unit 2 during Refueling Outage 12 and the subsequent operating cycle, degradation identified in the portion of the tube from the top of the hot leg tubesheet to 17 inches below the top of the tubesheet shall be plugged or repaired upon detection; BYRON - UNITS 1 & 2 5.5 - 12 Amendment 144
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Program (continued)
- 7. Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an OBE, LOCA, or a steam line or feedwater line break as specified in Specification 5.5.9.d.4;
- 8. Tube Inspection means an inspection of the SG tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg. For a tube that has been repaired by sleeving, the tube inspection shall include the sleeved portion of the tube.
For Unit 2 during Refueling Outage 12 and the subsequent operating cycle, the portion of the tube below 17 inches from the top of the hot leg tubesheet is excluded;
- 9. Preservice Inspection means an inspection of the full length of eachi ube in each SG performed by eddy current techniques prior to service to establish a baseline condition of the tubing. This inspection shall be performed prior to initial MODE 1 operation using the equipment and techniques expected to be used during subsequent inservice inspections;
- 10. Tube Repair refers to a process that reestablishes tube serviceability. Acceptable tube repairs will be performed by the following processes:
- i. Laser welded sleeving as described in a Westinghouse Technical Report and subject to the limitations and restrictions as approved by the NRC, or ii. TIG welded sleeving as described in ABB Combustion Engineering Inc., Technical Reports:
Licensing Report CEN-621-P, Revision 00, "Commonwealth Edison Byron and Braidwood Unit 1 and 2 Steam Generators Tube Repair Using Leak Tight Sleeves, FINAL REPORT," April 1995; and Licensing Report CEN-627-P, Operating Performance of the ABB CENO Steam Generator Tube Sleeve for Use at Commonwealth Edison Byron and Braidwood Units 1 and 2," January 1996; subject to the limitations and restrictions as noted by the NRC Staff.
BYRON - UNITS 1 & 2 5.5 - 13 Amendment 144
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Steam Generator (SG) Tube Surveillance Proaram (continued)
Tube repair includes the removal of plugs that were
.previously installed as a corrective or preventative measure. A tube inspection per Specification 5.5.9.e.8 is required prior to returning previously plugged tubes to service;
- 11. The SG shall be determined OPERABLE after completing the corresponding actions (plug or repair in the affected area all tubes exceeding the plugging or repair limit) required by Table 5.5.9-2; and
- 12. For Unit 2 during Refueling Outage 12 and the subsequent operating cycle:
Bulge refers to a tube diameter deviation within the tubesheet of 18 volts or greater as measured by bobbin coil probe; and Overexpansion refers to a tube diameter deviation within the tubesheet of 1.5 mils or greater as measured by bobbin coil probe.
5.5.10 Secondary Water Chemistry ProQram This program provides controls for monitoring secondary water chemistry to inhibit SG tube degradation. The program shall include:
- a. Identification of a sampling schedule for the critical variables and control points for these variables;
- b. Identification of the procedures used to measure the values of the critical variables;
- c. Identification of process sampling points, which shall include monitoring the discharge of the condensate pumps for evidence of condenser inleakage;
- d. Procedures for the recording and management of data;
- e. Procedures defining corrective actions for all off control point chemistry conditions; and
- f. A procedure identifying the authority responsible for the interpretation of the data and the sequence and timing of administrative events, which is required to initiate corrective action.
BYRON - UNITS 1 & 2 5.5 - 14 Amendment 144