MONTHYEARML22207A0312022-07-22022 July 2022 NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility RS-20-140, Proposed Changes to Decommissioning Trust Agreements2020-10-30030 October 2020 Proposed Changes to Decommissioning Trust Agreements ML19101A4052019-04-10010 April 2019 Annual Assessment Meeting Attendee List ML18156A0142018-05-30030 May 2018 30-2018 Annual Assessment Meeting Attendee List ML17097A2102017-04-0707 April 2017 List of Attendees for Annual Assessment Meeting for Salem, Hope Creek ML16096A0412016-03-30030 March 2016 Attendance List for Salem_Hope Creek Aam March 30, 2016 ML16049A4582016-02-18018 February 2016 FOIA/PA-2016-0261 - Resp 1 - Final, Salem 2011 Annual Environmental Operating Report ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML13059A2972013-02-26026 February 2013 SL-011725, Rev. 0, Salem, Mitigation Strategies for Beyond Design Basis External Events, EA-12-049 Overall Integrated Plan Response. ML13052A7942013-02-21021 February 2013 Complete Set of NRC Questions_2-21-13 ML12334A4512012-11-21021 November 2012 SL-2012-10795, Rev. 0, Sgs Flood Walkdown Report, 10 CFR 50.54(f) Section 2.3 (Flood) Response. ML12366A2972012-11-0808 November 2012 Bypass Testing Information ML12290A1442012-10-0404 October 2012 EN-AA-602-0006, Revision 0, Cultural and Historic Resources ML12138A0062012-05-15015 May 2012 Aam Attendance Sheet, May 15, 2012 ML12129A3892012-04-27027 April 2012 Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 LR-N12-0124, Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-022012-04-27027 April 2012 Salem Generating Station, Units 1 and 2 - Attachment 1 to LR-N12-0124, Generic Letter 2004-02, Updated Supplemental Response for Salem Regarding Generic Letter 2004-02 ML12129A3902012-04-27027 April 2012 Attachments 1 Through Attachment 8, Response to Generic Letter 2004-02 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1113601032011-05-10010 May 2011 2011 Salem/Hope Creek Annual Assessment Meeting Attendance List ML1030003382010-10-22022 October 2010 Document: Salem NRC Punchlist ML1030003372010-10-22022 October 2010 Document: Configuration Change #80101381 Rev 1 ML1030003392010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0 Salem Unit 2 ML1030003402010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, Draft ML1030003412010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2, with Handwritten Notes ML1030003422010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes ML1030004062010-10-22022 October 2010 Document: SAP685996 ML1030004072010-10-22022 October 2010 Large Bore Pipe Detail Index List Psbp No. 132419, Aux Feedwater ML1030004092010-10-22022 October 2010 Document: Label Request Form, Label 12AF155 S1 Aix ML1030004052010-10-22022 October 2010 Document: Operability Evaluation, Opeval, Rev 0, Salem Unit 2 with Handwritten Notes ML1030004022010-09-21021 September 2010 Document PSEG Notification 20462034 Basis AFW Discharge Line Design Pressure ML1030104962010-08-18018 August 2010 Document: 1R20 AF Buried Pipe Insp Results, Notification #20457262, Salem 1- Auxiliary Feedwater ML1030104972010-08-18018 August 2010 Document: Operation Key Info, Buried Pipe Program Inspection Reports for 12 and 14 Aux Feedwater Lines ML1016002752010-06-17017 June 2010 List of Attendees for NRC Public Management No. Nm 10-019; Salem Nuclear Generating Station Discussion of Independent Spent Fuel Storage on 05/27/10 ML1030002042010-05-24024 May 2010 Document: Design Analysis Minor Revision, Subject: Qualification of Safety-Related Buried Commodities for Tornado Missile and Seismic Evaluation ML1030004032010-05-0505 May 2010 Document: PSEG Notification 2041785 ML1029502392010-04-29029 April 2010 Branch 3 Daily Status ML1034404482010-04-24024 April 2010 Document: Salem Unit 1 12/14 AF Piping Reroute, #80101382 Rev 2 ML1029804652010-04-23023 April 2010 RM Documentation No. SA-SURV-2010-001, Rev. 1, Risk Assessment of Missed Surveillance - Auxiliary Feedwater Discharge Line Underground Piping Pressure Testing. ML1034404512010-04-23023 April 2010 Document: Ansys Input Files and Calculation Package Drafts ML1030002032010-04-22022 April 2010 Document: Stress and Support Summary ML1029804892010-04-22022 April 2010 Operability Evaluation with Tracked Changes ML1029802612010-04-21021 April 2010 Notification 000020459689, Submitted by Edley Giles ML1030002012010-04-20020 April 2010 Document: Ultrasonic Thickness Examination Record, Order #60084266, Procedure #OU-AA-335-004 ML1029505412010-04-12012 April 2010 Branch 3 Daily Status ML1029503942010-04-0707 April 2010 Branch 3 Daily Status ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0913201102009-05-0505 May 2009 Aam Sign-in Sheets, 05/05/2009 ML0812207452008-05-0101 May 2008 Sign-In Sheet, April 30, 2008 ML0806704192008-03-0707 March 2008 CDBI Findings 2022-07-22
[Table view] |
Text
.a.- I
- . i t g:\alleg\panel\20020034arb.wpd ALLEGATION REVIEW BOARD DISPOSITION RECORD Allegation No.: RI-2002-A-0034 Branch Chief (AOC): Meyer Site/Facility: Salem Acknowledged: No ARB Date: 3/06/2002 Confidentiality Granted: No Issue discussed: Allener stated that he received a significant uptake of radioactive material in 1983 that he believes caused his thyroid cancer. He has requested his bioassay/internal exposure data from the licensee from that period, but has not vet been provided this information. Also. he believes there may have been an effort to cover-up his exposure.
Alleger contacted prior to referral to licensee (if applicable)? Yes - No problem with referring his concerns - He has already been in contact with PSEG on this issue.
ALLEGATION REVIEW BOARD DECISIONS Attendees: Chair - Crleniak Branch Chief(AOC) - Meyer SAC - Vito 01 Rep. - Monroe RI Counsel - Fewell Others - Barklev. Smith. Nick DISPOSITION ACTIONS: (List actions for processing and closure. Note responsible person(s),
form of action closure document(s), and estimated completion dates.)
- 1) Acknowledgment letter - DRP to provide response to Concern 1. Indicate that the alleger will be asked for more information regarding the alleged coverup.
Responsible Person: SAC/Barklev ECD: 3/20/2002 Closure Documentation:_ Completed:
- 2) Call alleger to determine whether he has since received his bioassay records from PSEG. Also, ask him for additional information regarding the coverup of this matter that he is alleging. If his bioassay records are provided by 3/25/2002 and he provides no supporting information regarding an alleged coverup, close out this allegation.
Responsible Person: Barkley ECD: 4/04/2002 Closure Documentation:_ Completed:
3). If alleger does not receive his bioassay records by 3/25/2002, request in writing that PSEG provide those records to the individual and/or the NRC. DRS to review the exposure records when received. Also, if additional, supporting information is provided by the alleger, repanel this allegation to determine an appropriate course of action.
Responsible Person: Barklev Referral & Reoanel (if necessary)
Nimitz (Review Bioassay Record) ECD: 6101/2002 Closure Documentation:_ Completed:
SAFETY SIGNIFICANCE ASSESSMENT: The risk significance of this allegation is very low as the event in question in 1983 was reviewed by the NRC and no personnel overexposures occurred at that time (allow several significant individual exposures occurred), and the issue involves licensee operational/radcon performance 19 years ago.
ARB MINUTES ARE REVIEWED AND APPROVED AT THE ARB ;
PRIORITY OF 01 INVESTIGATION: N/A If potential discrimination or wrongdoing and 01 is not opening a case, provide rationale here (e.g., no prima facie, lack of specific indication of wrongdoing):
The case shore give edium or low priority due to the termination o indiv al's empi ent, is na test ositio (at-leve and tlasen of any issuwi his w performa e.
Rationale used to defer 01 discrimination case (DOL case in progress):
ENFORCEMENT STATUTE OF LIMITATIONS CONSIDERATION (only applies to wrongdoing matters (including discrimination issues) that are under investigation by 01, DOL, or DOJ):
What is the potential violation and regulatory requirement? 10 CFR Part 26, 10 CFR 50.5 When did the potential violation occur? February 2002 Once date of potential violation is established, SAC will assign AMS action to have another ARB at four (4) years from that date, to discuss enforcement statute of limitations issues.
NOTES:
Distribution: Panel Attendees, Regional Counsel, 01, Responsible Individuals (original to SAC)