NRC 2005-0079, Request for Withholding of Proprietary Information from Public Disclosure

From kanterella
(Redirected from ML052520084)
Jump to navigation Jump to search

Request for Withholding of Proprietary Information from Public Disclosure
ML052520084
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/01/2005
From: Koehl D
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2005-0079, NRC 2005-0110, NRC 2005-0114
Download: ML052520084 (2)


Text

Committed to NuclearExcellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 1, 2005 NRC 2005-0114 10 CFR 2.390 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Request for Withholdina of Proorietarv Information from Public Disclosure

References:

1. Letter from NMC to NRC dated August 26,2005 (NRC 2005-0110)
2. Letter from NMC to NRC dated June 20, 2005 (NRC 2005-0079)

In Reference 1, Nuclear Management Company, LLC (NMC), submitted the reclassified non-proprietary version of Westinghouse Calculation Note Number CN-RCDA-05-68, Revision 2, "Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop", dated July 18, 2005. Reference 2 had submitted an earlier version of this calculation (Revision 1) as a proprietary document. Revision 2 superseded Revision 1.

Westinghouse Electric Company ("Westinghouse"), the owner of the information, has informed NMC that CN-RCDA-05-68, Revision 2, consisted of additions and clarifications to Revision 1. Westinghouse stated that since CN-RCDA-05-68, Revision 2, was reclassified by Westinghouse as non-proprietary, previous revisions of CN-RCDA-05-68, including Revision 1, also contain no proprietary information and may be released for public disclosure by the NRC.

This letter contains no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on September 1, 2005.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC OD 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321

Document Control Desk Page 2 cc: Project Manager, Point Beach Nuclear Plant, USNRC Regional Administrator, Region IIl, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC