G:\\ALLEG\\PANEL\\20020160arb.wpd ALLEGATION REVIEW BOARD DISPOSITION RECORD Allegation No. RI-2002-A-0160 (SSW)
Branch Chief (AOC): Meyer Site/Facility: irn
{'.V Acknowledged: N/A ARB Date:
0If08703 \\
Confidentiality Granted: N/A Issue discussed:- The resident inspectors identified one potential safety issue and two potential staff suspected wrongdoing (S imatioqLgu their conversation with ther l
LJ{~ffu~la ot presenting the issues as arlegations, as suspected wrongdoing matters, or as issues requiring followup. Rather, he was discussing matters in the context of management's interface with union workers.] The SSW issues relate to (1) a potential unauthorized installation of commercial grade equipment to assist in chemistry monitoring and (2) the apparent failure to document the issue in the corrective action system once it was raised to management in August 2002. The technical issue relates to the installation of commercial grade computer equipment that could be used to improve monitoring capability. The technical concerns relate to making additional penetrations through existing fire barriers and/or installing power supplies in parallel with existing monitoring equipment.
Alleger contacted prior to referral to licensee (if applicable)?
N/A ALLEGATION REVIEW BOARD DECISIONS Attendees: Chair - Roage Branch Chief (AOC) - Barber (Act) SAC - Vito 01 Rep. - Monroe, Rze eka RI Counsel - Fewell Others - Meyer, Walker DISPOSITION ACTIONS: (List actions for processing and closure. Note responsible person(s),
form of action closure document(s), and estimated completion dates.)
- 1.
DRP to review existing installation to determine if added equipment effects safety related activity. Provide documentation of review to SAC and 01.
Responsible Person:
Meyer ECD:
1/17/2003 Closure Documentation:
Completed:_
- 2.
Repanel to determine if 01 investigation is warranted Responsible Person:
SAC ECD:
1/22103 Closure Documentation:
Completed:_
SAFETY SIGNIFICANCE ASSESSMENT: The risk significance of this concern appears low since 7C personnel that might be involved with any future tagging evolutions would be knowledgeable of the equipment installation.
PRIORITY OF 01 INVESTIGATION:
If potential discrimination or wrongdoing and 01 is not opening a case, provide rationale here (e.g., no prima facie, lack of specific indication of wrongdoing):
Rationale used to defer 01 discrimination case (DOL case in progress):
Information in this record was deleted in accordance with the Freedom of Intms OR Act, exemptOnS i
FOIA ARB MUTES ARE REVIEWED AND APPROVED AT THE ARB
2 Although SSW is usually of concern because of it involves personal integrity, the low significance of the underlying technical issues mollifies this inherent priority.
ENFORCEMENT STATUTE OF LIMITATIONS CONSIDERATION (only applies to wrongdoing matters lincluding discrimination issues) that are under investigation by 01. DOL, or DOJ):
What is the potential violation and regulatory requirement?
When did the potential violation occur?__
(Assign action to determine date, if unknown)
Once date of potential violation is established, SAC will assign AMS action to have another ARE at four (4) years from that date, to discuss enforcement statute of limitations issues.
NOTES: (Include other pertinent comments. Also include considerations related to licensee referral, if appropriate. Identify any potential generic issues)