David Mauldin Vice President Nuclear Engineering and Support Palo Verde Nuclear Generating Station Tel: 623-393-5553 Fax: 623-393-6077 Mail Station 7605 PO Box 52034 Phoenix. Arizona 85072-2034 102-05328-CKSITNW/RJR August 19, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-530 Action from ISI Relief Request 33 As part of the Relief Request 33, Arizona Public Service made a commitment to assess any long term impacts of the Unit 3 Pressurizer heater overheating condition on previously approved Palo Verde Nuclear Generating Station ISI Relief Requests 23 and
- 29. This assessment has been completed and it has been confirmed that the overheating condition, documented in Relief Request 33, did not result in any changes to the conclusions reached in Relief Requests 23 and 29.
No commitments are being made to the NRC in this letter.
If you have any questions on this issue, please contact Thomas N. Weber at (623) 393-5764.
Sincerely, 7SX2eL CDM/TNW/RJR/ca cc:
B. S. Mallett M. B. Fields G. G. Wamick NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS.
4NcS1 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway