Mid-Cycle Performance Review and Inspection Plan - Clinton Power Station
ML052420427
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/30/2005
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Crane C
Exelon Generation Co
References
Download: ML052420427 (5)


Text

August 30, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

CLINTON POWER STATION

Dear Mr. Crane:

On August 9, 2005, the NRC staff completed its performance review of the Clinton Power Station for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. Please note that the plan contains a Safety System Design and Performance inspection scheduled for November 2005 and a Problem Identification and Resolution inspection scheduled for March 2007. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

C. Crane In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62

Enclosure:

Clinton Power Station Inspection/ Activity Plan See Attached Distribution DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2004 to 2005\MOC letters\clin.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII E NAME MRing:dtp DATE 08/25/05 OFFICIAL RECORD COPY

C. Crane cc w/encl: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Manager Licensing - Clinton Power Station Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Illinois Department of Nuclear Safety Clinton Police Department Mayor of Clinton Mayor of Weldon DeWitt County Board Chairman DeWitt County Sheriff Coordinator, DeWitt County Emergency Preparedness Mayor of Wapella McLean County Board Chairman McLean County Sheriff Director, McLean County ESDA Piatt County Board Chairman Piatt County Sheriff Director, Piatt County ESDA Macon County Board Chairman Macon County Sheriff Director, Macon County ESDA INPO

C. Crane ADAMS Distribution:

DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG KGO RML2 SRI Clinton DRSIII DRPIII PLB1 JRK1

Page 1 of 1 Clinton 08/29/2005 10:59:58 Inspection / Activity Plan Report 22 09/01/2005 - 03/31/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71114 - EP EXERCISE & EP PI INSP 2 1 IP 7111401 Exercise Evaluation 10/03/2005 10/07/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/03/2005 10/07/2005 Baseline Inspections SSDPC - SAFETY SYSTEM DESIGN & PERFORMANCE 5 1 IP 7111121 Safety System Design and Performance Capability 11/14/2005 12/02/2005 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 3 1 IP 7111111B Licensed Operator Requalification Program 11/14/2005 11/18/2005 Baseline Inspections IP 71121 - RAD ACCESS CONTROL & ALARA 1 1 IP 7112101 Access Control to Radiologically Significant Areas 11/28/2005 12/02/2005 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 11/28/2005 12/02/2005 Baseline Inspections ISI - CLINTON ISI INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 02/06/2006 02/10/2006 Baseline Inspections 7112102 - ALARA OUTAGE INSP 2 1 IP 7112102 ALARA Planning and Controls 02/06/2006 02/10/2006 Baseline Inspections 71114 - BASELINE EP INSPECTION 1 1 IP 7111402 Alert and Notification System Testing 03/20/2006 03/24/2006 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 03/20/2006 03/24/2006 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 03/20/2006 03/24/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/20/2006 03/24/2006 Baseline Inspections HS - HEAT SINK INSPECTION 1 1 IP 7111107B Heat Sink Performance 03/27/2006 03/31/2006 Baseline Inspections 7112202 - TRANSPORTATION & RADWASTE 1 1 IP 7112202 Radioactive Material Processing and Transportation 05/22/2006 05/26/2006 Baseline Inspections 7112101 - RADIOLOGICAL ACCESS CONTROL 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/28/2006 09/01/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/28/2006 09/01/2006 Baseline Inspections M50.59 - MOD 50.59 INSPECTION 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/18/2006 10/06/2006 Baseline Inspections ME - MAINTENANCE RULE INSPECTION 1 1 IP 7111112B Maintenance Effectiveness 11/13/2006 11/17/2006 Baseline Inspections 7112201 - RADIOLOGICAL EFFLUENTS 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/11/2006 12/15/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/11/2006 12/15/2006 Baseline Inspections PI&R - PROBLEM IDENITFICATION AND RESOLUTION 4 1 IP 71152B Identification and Resolution of Problems 03/24/2007 04/11/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.